Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
01.25.18 2018 4-WD Pickup Truck-Code Enforcement
01.25.18 2018 Phelps Youth Playscape Project
02.15.18 2018 University Ave/Phase I Project
03.01.2018 Demolition Services 807, 809-811 E. 4th
03.01.2018 Spring Stump Removal-3/1/2018
03.08.2018 5th & 6th St Systemic Traffic Safety Improvemnts
03.08.2018 Automated Side-load Garbage Truck-3/8/2018
03.08.2018 FY 19 Complaint Mowing w/Complaint Snow Removal
03.22.2018 FY 18 Asphalt Overlay Program Contract No. 943
03.29.2018 FY 18 Ansborough Ave Improvements Contract No. 942
04.05.2018 2018 Right of Way Mowing
04.05.2018 2018 Street Reconstruction #944
04.05.2018 Backhoe Purchase
04.05.2018 Center for the Arts 2018 Restoom Renovation
04.05.2018 FY 18 Lift Station Mowing
04.12.2018 Ridgeway Towers PTAC Cooling Unit Project
04.19.2018 60x80 Pole Bldg.
04.26.2018 2WD Chevy Colorado Pickup
04.26.2018 Airport PARCS
05.03.2018 FY 18 Bridge & Culvert Repairs, Contract No. 950
05.03.2018 FY 18 Sidewalk Repair Program
05.17.2018 Police Interceptor Vehicles
05.17.2018 Waste Management HVAC Cooling System (2)
05.24.2018 1 Ton 4x4 w/84" cab with snow plow Pkg.
05.31.2018 City owned prop. mowing
06.07.2018 Asbestos Abatement 807, 809-811 E. 4th St
06.14.2018 Rehabilitate West Terminal Apron Project No. 3-19-0094-046
06.21.2018 2019 Truck with Dump Box
07.11.2018-FY 19 Levee Rip Rap, #961
07.12.2018 City Janitorial Services
07.12.2018-FY 19 Police Ammunition
07.12.2018-FY 19 Police Vehicle Equipment
07.12.2018-HVAC Cooling System
07.26.18 FY19 Brock 3rd Addition Sanitary Sewer Ext., Cont 954
08.23.2018 2018 Fall Stump Removal Project
08.23.2018 FY 2019 Waterloo Yard Waste Water Sanitary Sewer Extension, Contract 952
08.23.2018 Waste Management Cleaning of Anaerobic Digester #3
09.13.2018 2018 Triple Combination Pumper for WFD
09.13.2018 FY2019 Wing Dike, Cont no. 966
09.13.2018 Satellite Wet Well Rehabilitation Cont No. 907
10.04.2018 FY19 Sidewalk Repair, Zone 8, Cont 958
10.11.2018 2019 1-Ton Single Cab Pickup Truck with Plow Attachment.
10.11.2018 2019 Service Truck for Street Department.
10.11.2018 2019 Snow Blower for John Deere Endloader.
10.11.2018 FY 2019 Recycling Processing Facility to Support the City of Waterloo's Curbside Recycling Program.
10.11.2018 Rental of Four (4) Motor Graders to Support Snow Operations.
11.01.2018 2018 Tree Removal Project
11.08.2018 Public Works - Old CMC Building Roofing Project
11.29.2018 FY 2019 Levee Tree clearing Cedar River Contract No. 968
12.27.2018 Riverfront Stadium Group Seating Boxes Project
xxxx