HomeMy WebLinkAboutJasper Construction Svcs - C.O. 6-1-3/20/2017CHANGE ORDER NO. 6-1
Owner: City of Waterloo
Project: Repairs to 6t" St, 18"' St and Ansborouoh Avenue
Owners Contract No. 916
Date: 3-14-17
Contractor: Jasper Construction Services
Date of Contract Start: 9-17-16 $ 223,910.00
You are directed to make the following changes in the Contract Documents. Description:
Replace southwest expansion joint, repair southwest backwall concrete, clean south abutment seat, provide
partial depth sidewalk patching, remove and replace southwest approach pavement, remove one damaged
lateral bracing, and provide traffic control on the Park Avenue Bridge over the Cedar River as shown in attached
sheets V.24 and V.25.
Reason for Change Order:
The abutment backwall supporting the expansion joints are failing at the southwest corner and sidewalk
concrete is spalled.
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $223,910.00 Original Completion Date: 06-02-17 (All Items)
Previous CIO's (ADD/DEDUCT): $8,352.04 Previous CIO's (ADD/DEDUCT): N/A
This C.O. (ADD/DEDUCT): $ 53,065.50
Contract Price with all
approved Change Orders: $285,327.54
This C.O. (ADD/DEDUCT): N/A
REVISED: N/A
Revised Completion Date: 06-30-17
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)
ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above,
there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
APPROVED:
By:
OWNER (Authorized Signature)
ACCEPTED:
By: �%j�/�
CONTRA T, _R-( uthorized Signature)
3/zE7/I 1
Date
Date
-3//e-yi
AECOM, Inc.
60521749 / 6-1
Project Change
Number Order No.
CHANGE ORDER FORM Page CO -1
AECOM 60521749
CHANGE ORDER NO. 6-1
Owner: City of Waterloo Date: 3-14-17
Project: Repairs to 6th St, 18th St, and Ansborouph Avenue
Owner's Contract No. 916 Contractor: Jasper Construction Services
Date of Contract Start: 9-17-16 $ 223,910.00
You are directed to make the following changes in the Contract Documents. Description:
Replace southwest expansion joint, repair southwest backwall concrete, clean south abutment seat, provide
partial depth sidewalk patching, remove and replace southwest approach pavement, remove one damaged
lateral bracing, and provide traffic control on the Park Avenue Bridge over the Cedar River as shown in attached
sheets V.24 and V.25.
Reason for Change Order:
The abutment backwall supporting the expansion joints are failing at the southwest corner and sidewalk
concrete is spalled.
CONTRACT PRICE CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original: $223,910.00 Original Completion Date: 06-02-17 (All Items)
Previous CIO's (ADD/DEDUCT): $8,352.04 Previous CIO's (ADD/DEDUCT): N/A
This C.O. (ADD/DEDUCT): $ 53,065.50
Contract Price with all
approved Change Orders: $285,327.54
This C.O. (ADD/DEDUCT): N/A
REVISED: N/A
Revised Completion Date: 06-30-17
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s)
ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above,
there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
APPROVED:
By:
3/x/,'1
OWNER (Authorized Signature) Date
ACCEPTED:
By.
CONTRA T R-( uthorized Signature) Date
-3/pip '7
AECOM, Inc.
60521749 / 6-1
Project Change
Number Order No.
CHANGE ORDER FORM Page CO -1
AECOM 60521749
WEST WATERLOO
SEE DETAIL A
TURN UP EXTRUSION END
(TYP.)
REMOVE AND REPLACE
TOP OF DECK
REMOVE ANO REPLACE
REINFORCED APPROACH
PAVEMENT
REMOVE AND REPLACE
TOP OF BACKWALL
RB
PL
PROVIDE
SAWCUT
DETAIL A
E NEW
EMOVE AND REPLACE
EXISTING EXPANSION DEVICE
SAWCUT
SECTION B -B
FLOORBEAM
(UACI
EXISTING STEEL
ROADWAY PLATES
SHALL REMAIN
PROPERTY OF THE
CITY.(TO BE REMOVED
AND HAULED OFF BY
THE CITY.)
SITUATION PLAN
END OF STEEL
EXTRUSION & CURBS
END OF CONCRETE
DECK & BACKWALL
EXPANSION OPENING DETAIL
A THIS DIMENSION MAY VARY SLIGHTLY DEPENDING
ON MANUFACTURER FURNISHING THE JOINT.
USED FOR ALL OUT TO OUT DIMENSIONS OF SLAB,
AA THE DIMENSION MAY VARY SLIGHTLY DEPENDING ON
MANUFACTURER FURNISHING THE JOINT.
3x}x0'-6
TOP OF DECK
OR BACKWALL
1
EXPANSION
JOINT
SETTINGS
STEEL EXTRUSION
Vvpos_f__
I�
naa_n
1
2-R l i x e
TABLE OF APPROVED EXPANSION DEVICES
MANUFACTURER
oA
N
v
-
AVENUE
CORRESPONDING
MAXIMUM
DECK
TEMPERATURE
WATSON-BOWMAN &
ACME CORP.
TRAFFICPARK
SE -500
2 M.
0
Nr
550
Le
Steel Extrusi on Joint With Neoprene
30
TRAFFIC
m
30
m
u c
8
EA
TURN UP EXTRUSION END
(TYP.)
REMOVE AND REPLACE
TOP OF DECK
REMOVE ANO REPLACE
REINFORCED APPROACH
PAVEMENT
REMOVE AND REPLACE
TOP OF BACKWALL
RB
PL
PROVIDE
SAWCUT
DETAIL A
E NEW
EMOVE AND REPLACE
EXISTING EXPANSION DEVICE
SAWCUT
SECTION B -B
FLOORBEAM
(UACI
EXISTING STEEL
ROADWAY PLATES
SHALL REMAIN
PROPERTY OF THE
CITY.(TO BE REMOVED
AND HAULED OFF BY
THE CITY.)
SITUATION PLAN
END OF STEEL
EXTRUSION & CURBS
END OF CONCRETE
DECK & BACKWALL
EXPANSION OPENING DETAIL
A THIS DIMENSION MAY VARY SLIGHTLY DEPENDING
ON MANUFACTURER FURNISHING THE JOINT.
USED FOR ALL OUT TO OUT DIMENSIONS OF SLAB,
AA THE DIMENSION MAY VARY SLIGHTLY DEPENDING ON
MANUFACTURER FURNISHING THE JOINT.
3x}x0'-6
TOP OF DECK
OR BACKWALL
1
EXPANSION
JOINT
SETTINGS
STEEL EXTRUSION
Vvpos_f__
I�
naa_n
1
2-R l i x e
TABLE OF APPROVED EXPANSION DEVICES
MANUFACTURER
TYPE OF
STEEL
EXTRUSION
NEOPRENE
GLAND
MINIMUM
OPENING FOR
GLAND
INSTALLATION
CORRESPONDING
MAXIMUM
DECK
TEMPERATURE
WATSON-BOWMAN &
ACME CORP.
A
SE -500
2 M.
80° F.
550
Le
Steel Extrusi on Joint With Neoprene
30
LF
APPROVED EQUAL
30
LF
Safety Closure (Includes Sidewalks)
8
EA
Traffic Control
1
IS
Mobilization
q AT 90° F.
2e AT 50° F.
41, AT 100 F.
TOP OF DECK
OR BACKWALL
ANCHORAGE SYSTEM
AT I'-6 MAX.
SECTION THROUGH JOINT
NOTE:JOINT SETTINGS FOR
OTHER TEMPERATURES ARE
PROPORTIONAL. TEMPERATURES
SHOWN ARE CONCRETE DECK
TEMPERATURES ON THE
UNDERSIDE DR SHADED
PORTION OF THE DECK.
PARK AVENUE BRIDGE
OVER CEDAR RIVER
CITY BRIDGE NO.
FHWA NO.011831
NOTES:
5T WATERLOO
CHANGE ORDER 6-1 INLCUDES ALL MATERIAL LABOR AND EQUIPMENT
NECESSARY TO COMPLETE THE WORK DETAILED ON SHEETS V.24 AND
V.25, PAY ITEM IS 'MISCELLANEOUS REPAIRS'. METHOD OF MEASUREMENT
AND BASIS OF PAYMENT IS LUMP SUM.REFER TO OTHER NOTES IN
THESE PLANS FOR MATERIAL SPECIFICATIONS AND PROCEDURES SUCH AS
NEOPRENE GLAND INSTALLATION AND WATER TESTING,
BACKWALL AND DECK CONCRETE SHALL BE REMOVED TO SOUND CONCRETE,
TO THE EXTENT THAT THE EXISTING EXPANSION DEVICE CAN BE
REMOVED AND THE NEW EXPANSION DEVICE INSTALLED. ALL CONCRETE
REMOVALS SHALL BE INITIATED WITH SAWCUTS TO PREVENT SPALLING.
STRIAGHTEN CLEAN AND RE -USE LONGITUDINAL REINFORCEMENT AND
HOOPS. SUPPLEMENT' DAMAGED BARS WITH DRILLED -IN AND EPDXIED
DOWELS AS DIRECTED BY THE ENGINEER.NEW TRANSVERSE BARS SHALL
MATCH EXISTING SIZE AND SPACING.ALL SUPPLEMENTAL REINFORCEMENT
SHALL BE EPDXY COATED.
SIDEWALK PATCHING REMOVALS SHALL INCLUDE ALL LOOSE MATERIAL BY
HAND AND COMPRESSED AIR METHODS.REMOVALS DOWN TO SOUND
CONCRETE I5 NOT REQUIRED.RAIL REMOVAL AND REPLACEMENT IS NOT
REQUIRED TO FACILITATE ACCESS FOR REPAIRS.REMOVAL MATERIAL
SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR.
CONCRETE FOR SIDEWALK PATCHES SHALL BE DESIGNED FOR USE IN THIN
SURFACE PATCH APPLICATIONS.PATCHES MAY BE HAND FINISHED BUT
SHALL HAVE A NEAT SURFACE PROFILE THAT DRAINS WATER.CONCRETE
PATCHES MAY TAPER FROM THE RAIL GUTTERLINE TO THE EDGE OF DECK
AS REQUIRED TO ELIMINATE THE NEED FOR FORMING AT THE EDGE OF
DECK. SEE SHEET V.25 FOR PATCH LOCATIONS.
DEBRIS SHALL BE REMOVED FROM THE ABUTMENT SEATS AT THE SOUTH
ABUTMENT WITH HAND AND COMPRESSED AIR METHODS,
THE DAMAGED LATERAL BRACING SHALL BE REMOVED AND DISPOSED OF
OFF-SITE. THE BRACING SHALL BE CUT OFF AT THE NEAREST JOINT
LOCATION AS DIRECTED BY THE ENGINEER.
SIDEWALK CLOSURES AND TRAFFIC CONTROL SHALL BE SIMILAR TO
OTHER BRIDGE SITES ON THE PROJECT.
Park Ave Bridge Repairs
Item
Quantity
Unit
Removals, As Per Plan
1
IS
Structural Concrete (Misc.)
5
CY
Reinforcing Steel, Epoxy Coated
550
Le
Steel Extrusi on Joint With Neoprene
30
LF
Neoprene Gland Installation and Testing
30
LF
Safety Closure (Includes Sidewalks)
8
EA
Traffic Control
1
IS
Mobilization
1
IS
Remove Lateral Brading
1
EA
Clean Abutment Seat
1
LS
Partial Depth Sidewalk Patching
275.1
SF
Bridge Approach Pavement Remove and Replace
1
LS
PARK AVENUE BRIDGE
MISCELLANEOUS REPAIRS
MAY, 2017
CITY OF WATERLOO, IOWA
DESIGN TEAM A COM
CITY OF WATERLOO
CONTRACT NUMBER 916
SHEET NUMBER V.24
PROJECTS\Park Ave Patching\PARK AVE BRIDGE PATCHING.dwg 2/28/2017 1:18 PM
Light Pole
—no
34.2 SF
17.1 SF
�7.3 SF
Light Pole
South bound lanes
North bound lanes
4.6 SF '-29.1 SF
8.2 SF
Light Pole 14.7 SF Light Pole
6.7 SF `'18.4 SF
Areas greater than 1.0 SF to patch -16 total at 209.1 SF -
4 west side (60.3 SF) and 12 east side (148.8 SF)
U Areas roughly 1.0 SF to patch - 41 total -14 west side and 27 east side
Not shown: Roughly 100 spot patches generally 0.25 SF in area
Light Pole
Ex. Steel Plates
4.6 SF
Cedar River
Light Pole
Light Pole
1
17 SF/
4.6 SF
13.6 SF
11.8 SF
— - -
L
25.4 SF
Light Pole
7.1 SF
Scale: 1" = 50'
50 25 0 50
CO
W (0
W Z
"_
Z U
7 re 1—
CO Q
Cf w
1
2 Q W
(-0-0
W
y
eceay
co ym
O art-
CO.
a'
_
• ).7 0
CO d
.c Q
F
• t
N p U
LL
<1—
o
M
— wr9w
L• ce s8)4
• O 0 C ry
V
Q Z w O i N
D
u W M F m M
3VV
Z
DATE: 2/28/2017
SHEET
V.25