HomeMy WebLinkAboutMike Dolan Concrete - Final Qty Adj FY15 - Cont. 851-3/13/2017CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2015 Cunningham School Safe Routes to School Program PCC Sidewalks CONTRACT NO. 851 Date Prepared: r ya 21, 207 AMOUNT: $3,769.95 DECREASE TO: MIKE DOLAN CONCRETE AND MASONRY , Contractor You are hereby ordered to perform the following extra work on your contract dated June 15, 2015. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: Mayor ATTEST: 3/(31(1 Date Final Qty. Adj. TOTAL DECREASE $3,769.95 MIKE DOLAN CONCRETE AND MASONRY CONTRACTOR �J BY: G)'%'F L £ TITLE: (resided' a -r7 Date Date APPROVED: City Engineer Date 3/ 'Ji7 Contract No. 851 Sheet 1 of 1 F.Y. 2015 Cunningham School Safe Routes To School Program PCC Sidewalks CONTRACT NO. 851 FINAL PERIOD: Due 30 Days from date of acceptance of work Bid Item Bid Item Description Units Original Bid Quantity Final Quantity lQuantityDolan Difference Dolan Unit Price Unit Price Extended Increase / Decrease 1 Clearing and Grubbing UNIT 120.0 0.0 _:,': -120.0 $ 70.00 $ - $ (8,400.00) 2 Excavation, Class 10, Waste CY 108.9 108.9 - `" 0.0 $ 30.00 $ 3,267.00 $ 3 Topsoil, Furnish and Spread CY 328.8 328.8 ---` 0.0 ' $ 25.00 $ 8,220.00 $ - 4 Removal of Curb STA 1.350 1.705 -)'_. <:0.355 :-' $ 1,200.00 $ 2,046.00 $ 426.00 5 Surfacing, Driveway, Class A Crushed Stone TON 2.0 11.38 --`: 9.38 ': $ 40.00 $ 455.20 $ 375.20 6 Removal of Sidewalk SY 142.9 145.5 2.6 $ 18.00 $ 2,619.00 $ 46.80 7 Sidewalk, PC Concrete, 4 in. SY 379.8 353.6 -26.2 : $ 45.00 $ 15,912.00 $ (1,179.00) 8 Sidewalk, PC Concrete, 5 in. SY 26.6 31.4 - -:=-4.8 `- $ 54.00 $ 1,695.60 $ 259.20 9 Sidewalk, PC Concrete, 6 in. 5Y 73.7 72.9 -0.8 ': $ 58.50 $ 4,264.65 $ (46.80) 10 Detectable Warnings SF 116.0 116.0 ---'i00.0 '.. $ 25.00 $ 2,900.00 $ 11 Curb and Gutter, PC Concrete, 2.0 ft. LF 135.3 170.5 - 35.2 ': $ 20.00 $ 3,410.00 $ 704.00 12 Driveway, PC Concrete, 5 in. SY 20.7 21.8 7 1.1 :: $ 54.00 $ 1,177.20 $ 59.40 13 Driveway, PC Concrete, 6 in. SY 67.4 76.5 -:"9.1" $ 58.50 $ 4,475.25 $ 532.35 14 Removal of Paved Driveway SY 88.1 96.4 ' 8.3 $ 18.00 $ 1,735.20 $ 149.40 15 Safety Closure EACH 15.0 15.0 :a:B0.01'. $ 55.00 $ 825.00 $ 16 Perforated Square Steel Tube Posts LF 11.0 11.0 /: 0.0 $ 11.00 $ 121.00 $ 17 Type A Signs, Sheet Aluminum SF 15.0 15.0 :P.d 0.0 $ 20.00 $ 300.00 $ - 18 Construction Survey L5 1.0 1.0 t' 00'd $ 2,000.00 $ 2,000.00 $ 19 Traffic Control LS 1.0 1.0 ;:7c0.0 '' $ 2,000.00 $ 2,000.00 $ 20 Mobilization LS 1.0 1.0 0.0 ' $ 500.00 $ 500.00 $ - 21 Mulching, Wood Cellulose Fiber ACRE 0.1 0.0 -->-I-0.1 `::; $ 10,890.00 $ - $ (1,089.00) 22 Seeding and Fertilizing (Urban) ACRE 0.1 0.1 ---: 0.0 $ 10,890.00 $ 1,089.00 $ 23 Perimeter and Slope Sediment Control Device, 6 in. dia. LF 40.0 50.0 1110.0 ::' $ 7.00 $ 350.00 $ 70.00 24 Removal of Perimeter and Slope Sediment Control Device LF 40.0 50.0 - -`50.0 <. $ 1.00 $ 50.00 $ 10.00 8001 Combined Concrete Sidewalk and Retaining Wall CY - 5.75 --%>'' 5.75 $ 750.00 $ 4,312.50 $ 4,312.50 $ 63,724.60 $ (3,769.95) TOTAL PAY ESTIMATE#1 $ 56,070.35 PAY ESTIMATE#2 $ 447.45 PAY ESTIMATE#3 $ 4,045.57 RETAINAGE $ 3,161.23 TOTAL PAYMENTS $ 63,724.60 TOTAL ORIGINAL CONTRACT AMOUNT 67,494.55 REQUIRED DEDUCTIONS PER IOWA DOT CONTRACT SPECIFICATIONS (500.00) NEW CONTRACT AMOUNT 66,994.55 FINAL NEW CONTRACT AMOUNT $ 66,994.55 FINAL QUANTITY SUMMARY $ (3,769.95) FINAL CONTRACT AMOUNT $ 63,224.60 Cont. 3851 FINAL QTY. ADJ. 5RT5-U-8155728)--8U-07 Sheet 2 of 2