Loading...
HomeMy WebLinkAboutCouncil Packet-11/14/2011bs-14,0Ereivo cWe I51tgo ("h) THE CITY COUNCIL OF THE CITY OF WATERLOO, �,IAl"(aCQ� t" �`I?S IOWA, REGULAR SESSION TO BE HELD AT THE (� CITY HALL COUNCIL CHAMBERS, 5:30 P.M. O rM St) SALItiq MONDAY, NOVEMBER 14, 2011 CITY OF WATERLOO GOALS 1. Support economic development efforts that attract, retain and create quality jobs resulting in a diverse economic base and increased population. 2. Continue to support implementation of the Downtown Master Plan. 3. Facilitate and promote the development of housing options to meet the needs of current and future Waterloo citizens. 4. Develop a customer -centered service delivery approach. 5. Seek additional opportunities to share services and resources with other government entities. 6. Collaborate with statewide elected officials to reduce the burden on local property taxes. 7. Address the changing public workforce needs in Waterloo. 8. Enhance and protect a diverse, family-oriented community where neighborhoods are safe and well maintained. 9. Enhance the quality of place opportunities for the citizens of our community. General Rules for Public Participation 1. Although not required by city code of ordinances, oral presentations may be allowed at the chair/presider's (usually the Mayor or Mayor Pro Tern) discretion. The "oral presentations" section of the agenda is your opportunity to address items not on the agenda. A speaker may speak to one (1) issue per meeting for a maximum of three (3) minutes. Official action cannot be taken by the Council at that time, but may be placed on a future agenda or referred to the appropriate department. 2. At the chair/presider's discretion, you may address an item on the current agenda by stepping to the podium, and after recognition by the chair/presider, state your name, address and group affiliation (if appropriate) and speak clearly into the microphone. 3. If there is a hearing scheduled as part of an agenda item, the chair/presider will allow everyone who wishes to address the council, using the same participation guidelines found in these "general rules". 4. You may speak one (1) time per item for a maximum of three (3) minutes. 5. Keep comments germane and refrain from personal, impertinent or slanderous remarks. 6. Questions concerning these rules or any agenda item may be directed to the Clerk's Office at 291-4323. 7. Citizens are encouraged to register with the Clerk's Office by 5:00 p.m. on Monday of the day of the City Council meeting to appear before the City Council (may also register by phone). Registered speakers will be given first priority. Roll Call. Moment of Silence. Pledge of Allegiance: Mayor Buck Clark. November 14, 2011 5. Motion to receive and file Mayor Clark's recommendation of the following appointments: Page 3 Appointee Board/ Commission Expiration Date New or Re - Appointment Jane Scott Cable TV Commission December 31, 2013 Re Appointment Barbara Heinze Cable TV Commission December 31, 2013 New Appointment Class C Beer License Pennit Application 6. Aldi, Inc. #33, 1918 Schukei Road (Renewal) (Expires 11/3/12) (Includes Sunday Sales) 7. Independence Ave Food & Liquor, 1761 Independence Avenue (New) (Expires 11/1/12) (Includes Sunday Sales) Class C Liquor License Permit Application 8. El Mecca Shrine Club, 325 E. Park Avenue (New) (Expires 10/28/ 12) 9. Volk Haus, 324 E. 4th Street (Renewal) (Expires 11/22/12) (Includes Sunday Sales) 10. The Brown Bottle, 209 W. 5th Street (Renewal) (Expires 10/21/12) (Includes Sunday Sales) Class E Liquor License Permit Application 11. Independence Ave Food & Liquor, 1761 Independence Avenue (New) (Expires 11/1/12) (Includes Sunday Sales) Special Class C Beer/ Wine License Permit Application 12. Honey Garden Family Restaurant, 826 La Porte Road (New) (Expires 11/8/12) (Includes Sunday Sales) Class B Wine License Permit Application 13. Aldi, Inc. #33, 1918 Schukei Road (Renewal) (Expires 11/3/12) (Includes Sunday Sales) 14. Independence Ave Food & Liquor, 1761 Independence Avenue (New) (Expires 11/1/12) (Includes Sunday Sales) 15. Bonds November 14, 2011 Page 5 7.., 105 W� Resolution approving transfer of the remaining balance of $5,000.00 of the hotel/motel discretionary grant previously awarded August 2, 2010 to Main Street for marketing the Public Market to Leisure Services. Submitted by Michelle Weidner, Chief Financial Officer 8. Resolution authorizing the submission of a Community Attraction and Tourism Program Marketing grant application in the amount of $15,000.00 to the Iowa Department of Economic Development Vision ,/lifst Iowa/CAT program. Submitted by Cammie Scully, Cultural & Arts Commission Director ORDINANCES 9. Traffic Ordinance Change - Adding Activated Hybrid Beacons Section. Motion to receive, file, consider and pass for the first time an Ordinance amending the 2008 Traffic Code by enacting a new Section 540A, Activated Hybrid Beacons Motion suspending the rules. jjd3 Motion to consider and pass for the second and third time and adopt ordinance. Submitted by Sandie Greco, Traffic Operations Superintendent OTHER COUNCIL BUSINESS 10. Motion approving Change Order No. 1 for a net increase of $67,668.84 for work performed by Americlean of Waterloo, Iowa in conjunction with Five Sullivan Brothers Convention Center Duct and Coil Cleaning. Submitted by Craig C/ark, Building Oficial/Maintenance Administrator 11. 2011 Riverview Recreation Area Passive Unit Enhancement Phase II Motion to instruct Leisure Services Director to prepare plans, specifications, form of contract, etc. Motion to receive and file plans, specifications, form of contract, etc. Resolution preliminarily approving plans, specifications, form of contract, etc. )16 -�/Resolution setting date of hearing and bid opening as December 5, 2011 (� and instruct City Clerk to publish notice of plans, specifications, form of contract, etc. Submitted by Rick Curran, Leisure Services Facilities Manager ORAL PRESENTATIONS Motion to receive and file oral comments. Motion to adjourn to Executive Session. November 14, 2011 Page 7 3. F.Y. 2010 Riverfront Renaissance Lower Plaza, Contract No. 763 Pay estimate No. 33 to Peterson Contractors in the total amount due of $226,408.52 4. F. Y. 2010 Street Reconstruction, Contract No. 772 Pay estimate No. 29 to Aspro in the total amount due of $205,569.37 5. F.Y. 2011 River Renaissance North Downtown Trail, Contract No. 786 Pay estimate No. 13 to Vieth Construction Company in the total amount due of $21,822.73 6. F.Y. 2011 River Renaissance North Downtown Trail, Contract No. 786 Pay estimate No. 14 to Vieth Construction Company in the total amount due of $78, 549.08 7. F.Y. 2011 Asphalt Overlay Program, Contract No. 796 Pay estimate No. 12 to Aspro in the total amount due of $437, 033.10 8. F.Y. 2011 Street Reconstruction, Contract No. 798 Pay estimate No. 13 to Aspro in the total amount due of $470,354.73 9. F.Y. 2011 Cattle Congress Storm Water Pump Station, Contract No. 801 Pay estimate No. 12 to Peterson Contractors Inc. in the total amount due of $85,951.72 10. F. Y. 2012 Sidewalk Repair Assessment Program - Zone 1, Contract No. 811 Pay estimate No. 4 to B & B Builders & Supply in the total amount due of $7,408.81 11. F.Y. 2012 Flood Control Systems Tree Removal Pay estimate No. 1 to Control Services, Inc. in the total amount due of $17,917.00 12. Dili Run Creek Arch Storm Water Manhole & Value Replacements Payment to AECOM in the total amount due of $17,067.75 13. Waterloo Stormwater Lift Stations at Cedar Bend, Hollywood and Fletcher Avenue Payment to Snyder & Associates in the total amount due of $33,323.88 THE CITY COUNCIL OF THE CITY OF WATERLOO, IOWA, REGULAR SESSION TO BE HELD AT THE CITY HALL COUNCIL CHAMBERS, 5:30 P.M. MONDAY, NOVEMBER 14, 2011 CITY OF WATERLOO GOALS 1. Support economic development efforts that attract, retain and create quality jobs resulting in a diverse economic base and increased population. 2. Continue to support implementation of the Downtown Master Plan. 3. Facilitate and promote the development of housing options to meet the needs of current and future Waterloo citizens. 4. Develop a customer -centered service delivery approach. 5. Seek additional opportunities to share services and resources with other government entities. 6. Collaborate with statewide elected officials to reduce the burden on local property taxes. 7. Address the changing public workforce needs in Waterloo. 8. Enhance and protect a diverse, family-oriented community where neighborhoods are safe and well maintained. 9. Enhance the quality of place opportunities for the citizens of our community. General Rules for Public Participation 1. Although not required by city code of ordinances, oral presentations may be allowed at the chair/presider's (usually the Mayor or Mayor Pro Tem) discretion. The "oral presentations" section of the agenda is your opportunity to address items not on the agenda. A speaker may speak to one (1) issue per meeting for a maximum of three (3) minutes. Official action cannot be taken by the Council at that time, but may be placed on a future agenda or referred to the appropriate department. 2. At the chair/presider's discretion, you may address an item on the current agenda by stepping to the podium, and after recognition by the chair/presider, state your name, address and group affiliation (if appropriate) and speak clearly into the microphone. 3. If there is a hearing scheduled as part of an agenda itern, the chair/presider will allow everyone who wishes to address the council, using the same participation guidelines found in these general rules". 4. You may speak one (1) time per item for a maximum of three (3) minutes. 5. Keep comments germane and refrain from personal, impertinent or slanderous remarks. 6. Questions concerning these rules or any agenda item may be directed to the Clerk's Office at 291-4323. 7. Citizens are encouraged to register with the Clerk's Office by 5:00 p.m. on Monday of the day of the City Council meeting to appear before the City Council (may also register by phone). Registered speakers will be given first priority. Roll Call. Moment of Silence. Pledge of Allegiance: Mayor Buck Clark. November 14, 2011 5. Motion to receive and file Mayor Clark's recommendation of the following appointments: Page 3 Appointee Board/ Commission Expiration Date New or Re Appointment Jane Scott Cable TV Commission December 31, 2013 Re Appointment Barbara Heinze Cable TV Commission December 31, 2013 New Appointment Class C Beer License Permit Application 6. Aldi, Inc. #33, 1918 Schukei Road (Renewal) (Expires 11/3/12) (Includes Sunday Sales) 7. Independence Ave Food & Liquor, 1761 Independence Avenue (New) (Expires 11/1/12) (Includes Sunday Sales) Class C Liquor License Permit Application 8. El Mecca Shrine Club, 325 E. Park Avenue (New) (Expires 10/28/ 12) 9. Volk Haus, 324 E. 4th Street (Renewal) (Expires 11/22/12) (Includes Sunday Sales) 10. The Brown Bottle, 209 W. 5th Street (Renewal) (Expires 10/21/12) (Includes Sunday Sales) Class E Liquor License Permit Application 11. Independence Ave Food & Liquor, 1761 Independence Avenue (New) (Expires 11/1/12) (Includes Sunday Sales) Special Class C Beer/ Wine License Permit Application 12. Honey Garden Family Restaurant, 826 La Porte Road (New) (Expires 11/8/12) (Includes Sunday Sales) Class B Wine License Permit Application 13. Aldi, Inc. #33, 1918 Schukei Road (Renewal) (Expires 11/3/12) (Includes Sunday Sales) 14. Independence Ave Food & Liquor, 1761 Independence Avenue (New) (Expires 11/1/12) (Includes Sunday Sales) 15. Bonds November 14, 2011 Page 5 7. Resolution approving transfer of the remaining balance of $5,000.00 of the hotel/motel discretionary grant previously awarded August 2, 2010 to Main Street for marketing the Public Market to Leisure Services. Submitted by Michelle Weidner, Chief Financial Officer 8. Resolution authorizing the submission of a Community Attraction and Tourism Program Marketing grant application in the amount of $15,000.00 to the Iowa Department of Economic Development Vision Iowa/CAT program. Submitted by Cammie Scully, Cultural & Arts Commission Director ORDINANCES 9. Traffic Ordinance Change - Adding Activated Hybrid Beacons Section. Motion to receive, file, consider and pass for the first time an Ordinance amending the 2008 Traffic Code by enacting a new Section 540A, Activated Hybrid Beacons Motion suspending the rules. Motion to consider and pass for the second and third time and adopt ordinance. Submitted by Sandie Greco, Traffic Operations Superintendent OTHER COUNCIL BUSINESS 10. Motion approving Change Order No. 1 for a net increase of $67,668.84 for work performed by Americlean of Waterloo, Iowa in conjunction with Five Sullivan Brothers Convention Center Duct and Coil Cleaning. Submitted by Craig C/ark, Building Official/Maintenance Administrator 11. 2011 Riverview Recreation Area Passive Unit Enhancement Phase II Motion to instruct Leisure Services Director to prepare plans, specifications, form of contract, etc. Motion to receive and file plans, specifications, form of contract, etc. Resolution preliminarily approving plans, specifications, form of contract, etc. Resolution setting date of hearing and bid opening as December 5, 2011 and instruct City Clerk to publish notice of plans, specifications, form of contract, etc. Submitted by Rick Curran, Leisure Services Facilities Manager ORAL PRESENTATIONS Motion to receive and file oral comments. Motion to adjourn to Executive Session. November 14, 2011 Page 7 3. F.Y. 2010 Riverfront Renaissance Lower Plaza, Contract No. 763 Pay estimate No. 33 to Peterson Contractors in the total amount due of $226,408.52 4. F.Y. 2010 Street Reconstruction, Contract No. 772 Pay estimate No. 29 to Aspro in the total amount due of $205,569.37 5. F.Y. 2011 River Renaissance North Downtown Trail, Contract No. 786 Pay estimate No. 13 to Vieth Construction Company in the total amount due of $21,822.73 6. F.Y. 2011 River Renaissance North Downtown Trail, Contract No. 786 Pay estimate No. 14 to Vieth Construction Company in the total amount due of $78,549.08 7. F.Y. 2011 Asphalt Overlay Program, Contract No. 796 Pay estimate No. 12 to Aspro in the total amount due of $437, 033.10 8. F.Y. 2011 Street Reconstruction, Contract No. 798 Pay estimate No. 13 to Aspro in the total amount due of $470,354.73 9. F.Y. 2011 Cattle Congress Storm Water Pump Station, Contract No. 801 Pay estimate No. 12 to Peterson Contractors Inc. in the total amount due of $85,951.72 10. F.Y. 2012 Sidewalk Repair Assessment Program - Zone 1, Contract No. 811 Pay estimate No. 4 to B & B Builders & Supply in the total amount due of $7,408.81 11. F.Y. 2012 Flood Control Systems Tree Removal Pay estimate No. 1 to Control Services, Inc. in the total amount due of $17,917.00 12. Dry Run Creek Arch Storm Water Manhole & Valve Replacements Payment to AECOM in the total amount due of $17,067.75 13. Waterloo Stormwater Lift Stations at Cedar Bend, Hollywood and Fletcher Avenue Payment to Snyder & Associates in the total amount due of $33,323.88 November 7, 2011 The Council of the City of Waterloo, Iowa, met in Regular Session at City Hall Council Chambers, Waterloo, Iowa, at 5:30 p.m., on Monday, November 7, 2011. Mayor Ernest G. Clark in the Chair. Roll Call: Cole, Getty, Jones, Greenwood, Schmitt, Welper, Hart. Moment of Silence. Pledge of Allegiance: Sandie Greco, Superintendent of Traffic Operations. 137555 - Hart/Schmitt that the Agenda, as amended changing the vehicle on item 06, for the Regular Session on Monday, November 7, 2011, at 5:30 p.m., be accepted and approved. Voice vote -Ayes: Seven. Motion carried. 137556 - Hart/Schmitt that the Minutes, as proposed, for the Regular Session on Monday, October 24, 2011, at 5:30 p.m., be accepted and approved. Voice vote -Ayes: Seven. Motion carried. Mayor Clark recognized the November 2011 Team Member of the Month - Rita Bollans. Presentation of Leisure Services Youth Football Character Counts Coach of the Year Awards to: Christopher Chris, Brad Frost and Sean Ostendorf. Presentation of Leisure Services Youth Football Character Counts Player of the Year Awards to: Nate Ewell and Isaivon Labeaux. CONSENT AGENDA 137557 - Hart/Schmitt that the following items on the consent agenda be received, placed on file and approved: a. Resolutions to approve the following: 1. Resolution approving Schedule AP642, pp. 1-85, dated November 7, 2011, in the amount of $2,875,158.92, a copy of which is on file in the City Clerk's office, together with recommendation of approval of the Finance Committee. Resolution adopted and upon approval by Mayor assigned No. 2011-1027. 2. Request to certify the following assessments to properties for work performed by the Water Works, together with recommendation of approval of Board of Water Works Trustees -Submitted by Dennis Clark, General Manager of Waterloo Water Works: Address Amount to certify 1716 Bertch Avenue $325.31 508 Independence Avenue $875.00 Resolution adopted and upon approval by Mayor assigned No. 2011-1028. b. Motion to approve the following: 1. 2. Travel Requests Name & Title of Personnel Class/Meeting Destination Date(s) Amount not to Exceed Ernie Colbert, USDA Employee/Trainer Trevor Kehler, USDA Employee/Trainer Airport Wildlife Training To Waterloo, Iowa from Des Moines, Iowa November 2, 2011 $900.00 Dave Zellhoefer, Assistant City Attorney. Iowa Municipal Attorney's Association Annual Seminar Johnston, Iowa November 18, 2011 $157.50 '„Nona' UT oga '6ZOT-TTOZ 'oN peubrsse zoAew Aq TPAoadde uodn pue pagdope uorgnTosag •uanaS :saAy-agon TT'° flog •pagdope eq abegses zepeo7_epTS pageuogny ZTOZ (T) eu0 3o esEgosnd g;TM uorgounCuoo 'guaunoop prq 'suorgeoT;Toads go Tenosdde burusTguoo uorgnTose'd ge4g peoeTd pue sadTaM/g;TUIMOS - •parzseo uorgof •uanaS :seAv-agon eoron •enr3 uo peAreoas eq sgue nuoo uagg-XM pue Ipso pue pasoTo eq burzeaq eq; gegg uaggrnM so; paTTeo soAeN eqg uanaS saTano3 (T) eu0 'burseeq zadTaM/ggrulgoS 09SL£T •euou eleM asagg pue suoTgoaCgo Teso pue oTTgnd 3o eoeld pue aur. aq; bureq sTUI - 6S9LET •parssso uaTgow :sally-agon aorop •aTT3 uo paoeTd pue panraoes eq 'ITO? '0? sagogo0 uo ooTzaa.EM eqg TOT pegsTTgnd se 'xonzy ebegseO sapeo7-apes pageuogny CEO? go esegoznd uo burzeeq oTTgnd go aOrgou ;o uorgeoTTgnd 3o 3oosd a.egq. enuany sapnTOuI) (ZT/OI/TT zadTaM/ggrmgos SONRiy3H OIZECId •paTaseo uoTgow •uanaS :saAk-eq.on TTeo TTog spuog•6T eouepuadepuI T9LT 'zonbr7 9 poo enuany eouapuedepui•ST uoT;eoTTddy grused aggasebro sasrdxg) peog ggTMa0 g9Z£ 'gnTo ssosTAsadng eg3'LT gaazgS asoueoAS L09T 'claorS 44ET atiJ'91 gaazgS q417'M 00£ 'guAo2 ezgaad s,Aeor Agbno3•ST uorgeOTTddy easy aornsa3 zoopgn0 (MaN) peog 4011Me sapnTouI) (ZT/TZ/OT sasTdxg) (TeMauag) gessgs (TT/TT/OT sATgoa33g) (agepdn drgssauMo) ❑ S9Z£ 'gnTO (saTeS Aspuns ssosTAaadnS a4S'17T (sales Aepuns azoueoA5 L09T 'de;S 442T ag,L'£T gaazgS yiS 'M OT6 'Pagrun 3Hg'Z1 (saTeS Aepun5 sepnloui) (ZT/L/OT setTdxa) (TeMauag) gaazgS yob 'M 00E 'guAor ezgaad s,AaoQ Agb1-}00'IT (ZT/OE/TT sasrdx2) (TeMauag) anr1Q euoToAO STS? 'o'T`I eds Teorpew euTA,Q'OT uoTgeoTTddy gru:zad esueor7 zonbr7 O sseTO (ZT/OZ/9 sasrdx3) (TeMauag) anuany x..sed '2 SZE 'gnT3 auTsgs eooaN T3 '6 uoTgeoTiddy grusad esueor7 sonbr7 y sswTo (ZT/02/6 Tned Aq Naea 3o sazrdxg) (TeMauag) (saTeS AepunS sapnTouI) anuany TTetogTN •2 S£OZ 'da speozsso10 uaTgeorlddy grusad esueor7 saag O sseT3 sogoasTQ seotAsa5 PaggrmgnS-TTOZ '8 sequanoN anrgoa33a 'Azgseso3 - uoT;Tsod eqg og goneg eTAx 3o guaugurodde 3o ants -car! 'burgnH II aoueuaguTsK uorgepuaunuooag 69'0995 ITO? '.ZI-6 zequaAoN eMoI 'seurow SSC eoueie;ua0 ysW3i ;JT4S E zaoT330 Te0TPaH 'zepueusag uoseS 69'0295 TIO? 'TT -OT saguanoN eMoI 'seurow SGC aouasa;uo0 VSN2I 43TMS 0 Jeor330 Teo1P9W 'Nogg FETE 00'8L9'It TTOZ '0Z -LT sagmanoN EPTzOT3 'eTepzapne7 gzog seurues uorg9TOossy gdesbATod eprzoT3 ueouna zogebrgsanuI 00'0825 TTOZ '6 saqu1eAoN eMoI 'oolsageM sseTo . agepdn TTOZ epoO °T140aT2 TeuoT;eN goal SOI 'u9UAH TOMOS :ueuaso3 131 'urnb Sue) Z abed 'L .9 .5 'E - BSSLET ITO? 'L sequianoN November 7, 2011 137561 - Schmitt/Welper Page 3 that "Resolution authorizing to proceed in conjunction with Purchase of One (1) 2012 Automated Side -Loader Garbage Truck", be adopted. Roll .call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1030. 137562 - Schmitt/Welper to receive, file and instruct City Clerk to open and read bids and refer to Public Works Director for review: Bidder Bid Amount Cedar Rapids Truck Center 9201 6th Street SW $216,564.00 PO Box 67 $252,144.00 Cedar Rapids, Iowa 52406 Truck Country 700 29th Avenue SW $239,252.50 Cedar Rapids, Iowa 52404 $267,351.50 Twin Bridges Truck City 2250 W 76 Street $226,130.00 Davenport, Iowa 52806 $254,546.00 Voice vote -Ayes: Seven. Motion carried. 137563 - Greenwood/Schmitt that proof of publication of notice of public hearing on Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) Group 2 for the Hazard Mitigation Grant Program (HMGP) Property Acquisition Project, as published in the Waterloo Courier on October 27, 2011, be received and placed on file. Voice vote -Ayes: Seven. Motion carried. 137564 This being the time and place of public hearing, the Mayor called for written and oral objections. Noel Anderson, Community Planning and Development Director, reported that there is one property on San Souci Island and the rest are in the Sherwood Park area. Greenwood/Schmitt that the hearing be closed and oral and written comments be received and placed on file. Voice vote -Ayes: Seven. Motion carried. 137565 - Greenwood/Schmitt that "Resolution confirming approval of Request for Proposals, plans, specifications, form of contract, etc. in conjunction with Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) Group 2 for the Hazard Mitigation -Grant Program (HMGP) Property Acquisition Project", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1031. 137566 - Greenwood/Schmitt that "Resolution ordering construction in conjunction with Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) Group 2 for the Hazard Mitigation Grant Program (HMGP) Property Acquisition Project", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1032. November 7, 2011 137567 - Greenwood/Schmitt Page 4 to receive, file and instruct City Clerk to open and read bids and refer to Community Planning & Development Director for review: Bidder 5% Guarantee by certified check or bid bond (yes or no) Total lump sum bid (total cost based on the tabulated amounts from each property bid tab) Active Thermal Concepts 2805 Stonegate Court Hiawatha, Iowa 52233 5% $72,910.00 Baker Concrete & Excavating 2203 E. Bremer Avenue PO Box 277 Waverly, Iowa 50677 5% $69,921.00 Benton's Sand & Gravel, Inc 905 Center Street Cedar Falls, Iowa 50613 5% $103,750.00 Kelly Demolition LLC 1100 W. Mt. Vernon Road Mount Vernon, Iowa 52314 5% $98,835.36 McClain & Company, Inc. 520 Charles Street Waterloo, Iowa 50703 5% $63,250.00 Peterson Contractors Inc. Box A Reinbeck, Iowa 50669 5% $125,640.00 Affordable Hazards Removal, Inc. 121 E Grand Street Monticello, IA 52310 5% $171,075.00 Voice vote -Ayes: Seven. Motion carried. 137568 - Getty/Hart that proof of publication of notice of public hearing on Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) for the Former Grand Hotel, as published in the Waterloo Courier on October 14, 2011 and October 27, 2011, be received and placed on file. Voice vote -Ayes: Seven. Motion carried. 137569 - This being the time and place of public hearing, the Mayor called for written and oral objections. It was clarified that the project should be completed by the end of the year. Getty/Hart that the hearing be closed and oral and written comments be received and placed on file. Voice vote -Ayes: Seven. Motion carried. 137570 - Getty/Hart that "Resolution confirming approval of Request for Proposals,' plans, specifications, form of contract, etc. in conjunction with Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) for the Former Grand Hotel", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1033. 137571 - Getty/Hart that "Resolution ordering construction in conjunction with Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) for the Former Grand Hotel", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1034. November 7, 2011 137572 - Getty/Hart Page 5 to receive, file and instruct City Clerk to open and read bids and refer to Community Planning & Development Director for review: Bidder Bid Security Bid Amount Active Thermal Concepts 2805 Stonegate Court Hiawatha, Iowa 52233 5% $224,224.00 Baker Concrete & Excavating 2203 E. Bremer Avenue PO Box 277 Waverly, Iowa 50677 5% $217,000.00 Beriton's Sand & Gravel, Inc 905 Center Street Cedar Falls, Iowa 50613 5% $202,828.00 Kelly Demolition LLC 1100 W. Mt. Vernon Road Mount Vernon, Iowa 52314 5% $218,642.00 Frickson Brothers Excavation 737 Colleen Avenue Evansdale, Iowa 50707 $8,100.00 check $162,000.00 Peterson Contractors Inc. Box A Reinbeck, Iowa 50669 5% $149,700.00 Voice vote -Ayes: Seven. Motion carried. RESOLUTIONS 137573 - Hart/Welper that "Resolution approving Convention and Visitors Bureau Board recommendation for denying funding the hotel/motel grant request of Grout Museum District in the amount of $30,000.00 -Submitted by Aaron Buzza, Executive Director of Waterloo Convention & Visitors Bureau", be adopted. Roll call vote -Ayes: Two. Nays Five. Motion failed. Ms. Cole asked to have the clarification of what a yes and no vote for this item mean. Mayor Clark explained that a yes -vote will deny the request. Mr. Welper asked for a clarification of why the Convention and Visitors Bureau is requesting denial. Aaron Buzza, Waterloo Convention and Visitors Bureau, reported that the size of the request would set precedence for future grants and out of character for previous requests. This size of grant could not be maintained; therefore the board is recommending denial. Ms. Cole asked if Council chose to fund the request, where the funding would come from. Mayor Clark reported Council could choose to fund the request from the CVB reserve fund. The monies are left over from grants previously awarded but not used, from the tax grant pool. Mr. Getty clarified that in the future Council could take $30,000 from the Convention and Visitor's Bureau and moved to the Council discretionary funds to allocate to the Grout Museum. Mr. Jones appreciates the effort of the CVB Board in working through the requests. They are in a challenging position. Mayor Clark thanked all the volunteers for their efforts. 137574 - Hart/Schmitt that "Resolution approving funding the hotel/motel tax grant request of Grout Museum District in the amount of $30,000.00 to be paid out of the hotel/motel tax grant reserves , be adopted. Roll call vote -Ayes: Seven. Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1035. November 7, 2011 137575 - Schmitt/Welper Page 6 that "Resolution approving Completion of Project and Recommendation of Acceptance of Work performed by Trans -Iowa Equipment Inc., of Ankeny, Iowa at a total cost of $585,000.00 in conjunction with Purchase of Carrier Vehicle with front mounted Sweeper for Waterloo Regional Airport", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1036. 137576 - Schmitt/Welper that "Resolution approving Certificate of Substantial Completion to Prairie Construction Co. Inc. of Waterloo, Iowa in the amount of $79,290.00 in conjunction with 2011 Public Market Window Replacement and New Vestibules; and authorize Mayor to execute said document -Submitted by Rick Curran, Leisure Services Facilities Manager", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1037. 137577 - Schmitt/Welper that "Resolution approving agreement with Ament, Inc. of Cedar Rapids, Iowa in an amount not to exceed $18,000.00 for engineering services in conjunction with University/US 63 Intersection Traffic Study -Submitted by Sandie Greco, Traffic Operations Superintendent", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1038. 137578 - Cole/Hart that "Resolution approving agreement with Cedar Bend Humane Society for Black Hawk Animal Control Services at the rate of $17,229.50 per month plus a fee of $55.00 for each DOA deer disposal, effective November 8, 2011 to June 30, 2012 - Submitted by Sandie Greco, Traffic Operations Superintendent", be adopted. Roll call vote -Ayes: Seven. Mr. Schmitt clarified that the amount of the contract will not be increasing but services will be reduced. Mr. Welper noted that the City of Des Moines is struggling with the issue of animal control as well. Mr. Greenwood clarified that the Humane Society will still assist with wild animals during business hours but other organizations will need to be called if after hours. Resolution adopted and upon approval by Mayor assigned No. 2011-1039. November 7, 2011 137579 - Cole/Hart Page 7 that "Resolutions approving the assignment of resolution for each of the below Requests to Release Real Estate Mortgage for Payment of Promissory Note in conjunction with the Kimball South Rural Water Main Project; and authorize Mayor and City Clerk to execute said documents -Submitted by Dennis Clark, General Manager of Waterloo Water Works", be adopted. Property Owner Address Resolution adopted and upon approval by Mayor Assigned Number as Indicated Michael J. Flaherty and Louann J. Flaherty 7438 Kimball Avenue 2011-1040 Karolyn E. Harmon and Jay H. Harmon 400 W. Schrock Road 2011-1041 Veryl A. Dietz and Rosemary Dietz 9042 Douglas Drive 2011-1042 Melvin W. Steimel and Mary Margaret Steimel 10826 Kimball Avenue 2011-1043 Patricia A. Mangrich and Lavern Mangrich 34 East Eagle Road 2011-1044 Roger D. DeVries and Gladys M. DeVries 11707 Kimball Avenue 2011-1045 Richard A. Brandhorst and Joyce A. Brandhorst 11145 Kimball Avenue 2011-1046 Glen N. Nyman and Joan M. Nyman 9007 Kimball Avenue 2011-1047 Mary Margaret Steimel and Melvin W. Steimel 10319 Kimball Avenue 2011-1048 Richard L. Sweet and Marjorie A. Sweet 8509 Hammond Avenue 2011-1049 Carl W. Schaefer and Janet M. Schaefer 12049 Kimball Avenue 2011-1050 Scott Matthew Hottle and Elizabeth Rose Hottle 9526 Kimball Avenue 2011-1051 Richard J. Platt and Lori Platt 8611 Hammond Avenue 2011-1052 Joseph J. Schaefer and Joyce A. Schaefer 8411 Kimball Avenue 2011-1053 Roll call vote -Ayes: Seven. 137580 - Cole/Hart that "Resolution approving the acquisition of land generally described as a 2 - foot by 40 -foot parcel of land located at the northerly end of Stanley Court with recording costs and filing fees not to exceed $1,000.00; and authorize Mayor and City Clerk to execute any necessary documents -Submitted by Noel Anderson, Community Planning & Development Director", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1054. 137581 - Hart/Welper that "Resolution approving a Waiver and Release of Reversionary Interest for property located at 25 Commercial Street, Unit. No. 10; and authorize Mayor and City Clerk 'to execute any necessary documents -Submitted by Noel Anderson, Community Planning & Development Director", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1055. 137582 - Hart/Welper that "Resolution approving First Amendment to Development Agreement with Anthony L. and Christopher P. Huff for tax rebates for improvements at 3450 Wagner Road; and authorize Mayor and City Clerk to execute said document -Submitted by Noel Anderson, Community Planning & Development Director", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1056. November 7, 2011 Page 8 137583 - Hart/Welper that "Resolution authorizing the Assignment of Rebates to TKE Holdings LLC from the prior development agreement with Bob and Kaye Huff for property located at 3328 Wagner Road; and authorize Mayor and City Clerk to execute said document - Submitted by Noel Anderson, Community Planning & Development Director", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1057. 137584 - Greenwood/Schmitt that "Resolution approving recommendation of award of contract in the amount of $2,990.00 to Hawkeye Environmental of Solon, Iowa in conjunction with FY 2011 Asbestos Survey of the Former Francis Grout School located. at 330 Madison Street -Submitted by Noel Anderson, Community Planning & Development Director", be adopted. Roll call vote -Ayes: Seven. Mr. Getty expressed concern with how the process works and how every time there is asbestos missed. Noel Anderson, Community Planning and Development Director, explained that there are unforeseen instances where the asbestos is hidden and cannot be seen during the first inspection. Mr. Anderson explained the areas that.commonly contain asbestos. Mr. Schmitt asked if it is the contractor or if it just the nature of the business. Mr. Anderson explained that it is the nature of the business. Mr. Greenwood asked for the timeline. Noel Anderson, Community Planning and Development Director, explained that the testing will start this year but the demolition will not happen until next summer of late fall. A grant was obtained for the asbestos testing. Resolution adopted and upon approval by Mayor assigned No. 2011-1058. 137585 - Greenwood/Schmitt that "Resolution approving recommendation of award of contract in the amount of $4,000.00 to Hawkeye Environmental of Solon, Iowa in conjunction with FY 2011 Asbestos Survey of the following properties: 212 Jefferson, 302 Jefferson, 306- 308 Jefferson and 312 Jefferson -Submitted by Noel Anderson, Community Planning & Development Director", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1059. 137586 - Greenwood/Schmitt that "Resolution authorizing the submission of Housing Needs Assessment to Department of Housing and Urban Development; and authorize the implementation of said document as part of • the Consolidated Plan for the City of Waterloo - Submitted by Rudy D. Jones, Community Development Director", be adopted. Roll call vote -Ayes: Seven. Mr. Jones reported that the assessment was completed in house and saved the City $10,000 and turned out very well. Resolution adopted and upon approval by Mayor assigned No. 2011-1060. 137587 - Greenwood/Schmitt that "Resolution approving agreement with Iowa Department of Transportation for use of city streets (Idaho Street and Dubuque Road) as detours to detour IA 281 (Independence Avenue) traffic on city streets in conjunction with IA 281 Rubblizing and Resurfacing for the period of July 1, 2012 to November 1, 2012; and authorize Mayor to execute said document -Submitted by Jamie Knutson, P.E., Associate Engineer", be adopted. Roll call vote -Ayes: Seven. Mr. Schmitt asked if these streets are equipped to handle this kind of traffic. Eric Thorson, City Engineer, noted that part of the agreement is that the -streets will be inspected prior to the detour and following the project if any damage is done the DOT will reimburse the City. • Resolution adopted and upon approval by Mayor assigned No. 2011-1061. November 7, 2011 Page 9 OTHER COUNCIL BUSINESS 137588 - Getty/Hart that Change Order No. 1 for a net increase of $4,275.00 for work performed by Peterson Contractor, Inc. of Reinbeck, Iowa in conjunction with F.Y. 2012 Anaerobic Lagoon Influent Pump Station, Contract No. 807 -Submitted by Larry N. Smith, Waste Management Services Superintendent, be received, placed on file and approved. Voice vote -Ayes: Seven. Motion carried. 137589 - Getty/Hart that Change Order No. 1 for a net increase of $3,995.00 for work performed by Reilly Construction Company, Inc. of Ossian, Iowa in conjunction with F.Y. 2011 Highway 63 South Manhole Rehabilitation, Contract No. 809 -Submitted by Larry N. Smith, Waste Management Services Superintendent, be received, placed on file and approved. Voice vote -Ayes: Seven. Motion carried. 137590 - Getty/Hart that Change Order No. 1 for a net increase of $7,500.00 for work performed by New Horizons LLC of Kansas City, Missouri in conjunction with FY 2011 Asbestos Removal at the Grand Hotel Property located at 300 W. Mullan Avenue -Submitted by Noel Anderson, Community Planning & Development Director, be received, placed on file and approved. Voice vote -Ayes: Seven. Motion carried. 137591 - Hart/Greenwood to instruct Community Development Director to prepare plans, specifications, form of contract, etc. in conjunction with Demolition and Site Clearance Contract No. 175-D-CDBG-12-12-11- Former Van Eaton School located at 2170 Burton Avenue, be approved. Voice vote -Ayes: Seven. Motion carried. 137592 - Hart/Greenwood that plans, specifications, form of contract, etc. in conjunction with Demolition and Site Clearance Contract No. 175-D-CDBG-12-12-11 - Former Van Eaton School located at 2170 Burton Avenue, be received and placed on file. Voice vote -Ayes: Seven. Motion carried. 137593 - Hart/Greenwood that "Resolution preliminarily approving plans, specifications, form of contract, etc. in conjunction with Demolition and Site Clearance Contract No. 175-D-CDBG-12-12-11 - Former Van Eaton School located at 2170 Burton Avenue", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No.. 2011-1062. 137594 - Hart/Greenwood that "Resolution setting date of hearing and bid opening as December 5, 2011 and instruct City Clerk to publish notice of plans, specifications, form of contract, etc. in conjunction with Demolition and Site Clearance Contract No. 175-D-CDBG-12-12-11 - Former Van Eaton School located at 2170 Burton Avenue", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1063. 137595 - Hart/Greenwood to instruct Community Planning specifications, form of contract, for Consultant Services for the Petroleum and Hazardous Material Ayes: Seven. Motion carried. 137596 - Hart/Greenwood & Development Director to prepare plans, etc. in conjunction with Request for Proposals Implementation of the 2010 US 63 City Wide Assessment Grant, be approved. Voice vote - that plans, specifications, form of contract, etc. in conjunction with Request for Proposals for Consultant Services for the Implementation of the 2010 US 63 City Wide Petroleum and Hazardous Material Assessment Grant, be received and placed on file. Voice vote -Ayes: Seven. Motion carried. November 7, 2011 137597 Hart/Greenwood Page 10 that "Resolution preliminarily approving plans, specifications, form of contract, etc. in conjunction with Request for Proposals for Consultant Services for the Implementation of the 2010 US 63 City Wide Petroleum and Hazardous Material Assessment Grant", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1064. 137598 - Hart/Greenwood that "Resolution setting date of hearing and bid opening as November 21, 2011 and instruct City Clerk to publish notice of plans, specifications, form of contract, etc. in conjunction with Request for Proposals for Consultant Services for the Implementation of the 2010 US 63 City Wide Petroleum and Hazardous Material Assessment Grant", be adopted. Roll call vote -Ayes: Seven. Resolution adopted and upon approval by Mayor assigned No. 2011-1065: ORAL PRESENTATIONS Forest Dillavou, 1725 Huntington Road, expressed concern with streetlights being out on Fletcher Ave., Ansborough, and University. Sandie Greco, Traffic Operations Superintendent, reported that MidAmerican Energy has found and underground problem and is working on it. Mr. Greenwood asked why MidAmerican Energy doesn't have to ensure that the lights are working properly. Mr. Getty reminded everyone that tomorrow is Election Day and the citizens need to vote. 137599 - Getty/Hart that the above oral comments be received and placed on file. Voice vote -Ayes: Seven. Motion carried. ADJOURNMENT 137600 - Getty/Hart that the Council adjourn at 6:36 p.m. Voice vote -Ayes: Seven. Motion carried. Suzy Schares City Clerk 4 City of W-ate;toi DATE 3.1/1,)/:11 TIME 15:58:07 VENDOR cisl c I ;N A N C ): A L MANAGEMENT OPEN INVOICE REPORT INVOICE 0 INVOICE DESCRIPTION TOTAL INVOICE ITEN5 13469 SCHNITZER'S ELECTRICAL 245543 SOLENOID — ANNEX ITEM+.3 P.O. 4 CONTRACT 4 DESCRIPTION i SOLENOID — ANNEX Invoice 010 18 7-92() 1571 TOTAL INVOICE ITEMS 1 TOTAL INVOICES WITH DUE DATE OF 11114/2011 791 TOTAL CE5 791 PAGE 104 AP0642 C TY01 INV DATE DUE DATE 0/L DATE INV NET AMT 10/26/2011 11/14/2011 11/14/201i 451.20 GUANTITY U/M AMT/UNIT TOTAL AMT WORK ORDER 1.0000 EA 451.20 451.20 PCT: 1. 0000 ANT: 451.20 NOVEMBER 1 4, 2011 Friday's AP640 Report Total '+ Adj for data entry errors, canceled/added PVs, Etc : FIRST ADMINISTRATORS ACCESS SYSTEMS K & S WHEEL ALIGNMENT TIMCO TOM HOVLAND, INC. (Monday's AP640 Report Total DATA ENTRY ERRORS 3,61 4,546.77 126,326.55 32.23 (1 74.49) 257.97 (244,51 7.27) (1.00) 3,496,470.76 WORK COMP CLAIMS HOUSING AUTHORITY 3,215.07 2,723.42 Bill Payment Total $ 3,502,409.25 o./Cc (L/GCL LU/ //-/4z2e// 3,496,470 6 3) 496, 470. 76 CITY OF WATERLOO Council Communication City Council Meeting: November 14, 2011 Prepared: November 3, 2011 Dept. Head Signature: Suzy Schares # of Attachments: 4 covnaL Ary, rry41. ?It No. „2-6((—�4Lv� SUBJECT: Resolution to cancel assessment for 1823 City View Street Submitted by: Suzy Schares, City Clerk Recommended City Council Action: Resolution approving cancellation of assessment for 1823 City View Street; and authorize City Clerk to notify Black Hawk County Treasurer of said cancellation. Summary Statement: Expenditure Required: Background Information: The property owner indicated that the property has been rented as Section 8 housing. Section 8 units are not invoiced because of their own yearly inspection process. After further investigation it was discovered that this unit was invoiced in error. City'of Waterloo Financial 11/03/11 Accounts Receivable Inquiry Type options, press Enter. 5=Display 9=Display Invoices D▪ isp1,ay,Ipvpi,c,es„ ,,,,,,,,,, Favorite: AR0365S1 Reset: 14=Cycle Invoices 15=Additional Addresses Al Q2,10,5,1, , - D,isp1ay,Ipvo,i,c,e,,It,ems,,,,,,,,,, Invoice Number: 201103398 Customer . . : -Display ,Ipvoi,c,e, Type option, pre 5=Display Opt Rate Descrip 5 RENT FIRE RE F6,Add Rate Code . Description Line 1: Description Line 2: Description Line 3: Unit of Measure . • Amount per Unit . • Quantity . . . . Total Amount -IF3 ,Exit, E7kF,ul,1, Fxi,t ch�IS S (S. 8 lZeura�S' Wnd 1 tune AR0230,S,17, RENT RENTAL INS FIRE RENTAL INSPECTION 1823 CITY VIEW - JAN 28, 2011 UN UNIT 25.0000 1.0000 25.00 F,12; C,apc,e,l, 3 LISTOMEp' N611 50110110, FIRE 1ENTL. 15245 : .! m,A6 d>"c'I^.Eiki I !-xl_ 3c £.I oi-h0.C . L4VrwJ4rm 0110 r,r 1R33c1/21/4.1‘et,3 2011, 033P0 111-18colurA4.20:03527 REM aur_. FIRE RENIL "r'Sl-1 RENTL .. C 'C V ,. 3 .. i C 'V ,: 5 r- UPDATE INVOICaE5 TO CLi_5CT10N IiT4T335 i; PHONE 1105. 9(I.6/201.0 10/15(2010 25 ,,00 Duey cm€R rerril!.4_ 25. 3913 -ab 4I 9 incl \ 4,5+ 14307 DAD] BAIL:.. %q 13- ay -13a -c a3 V:! 10 1 . 1h_ RENTL .�. 3&) Adamn) 140.4 ,_2.. CESPA/.. UHHA-2„34 rnC 01533 ,;s 1 3 'RENTON LESL S1. 1Nn 011 n f__, 11010 4.. :'YT'. . 00 PAGE C:00620 T/11 PHONE *2 EXT, . 00 25. 00 12/1E/2010 2/04/2011 2 . 2/21/20,.1 gg13-aet-dS1 -101a ?I ' _ Vi F is ,T F,_Ar, 110/2 5 to 1Pr op DUE DATE /11.' '.1 is 5/ o '. 19t3_,76.„111.,b03 45. 00 7201.1 g9R.. 19-QE6-oa1 5 .O 2/ 2_/ .11 tgI3-14-930-0a25 00 CUSTOMER TOTA,9: .15'O. 00 rip t0 'STONER TOTALS: E 0 00 00 2E 00 2E766 PEN SAi Au.a. TOTAL 9G,i.ANCC 00 23. 00 00 45. 00 . 00 25 00 25, 00 00 .00 -1717.77:5-6 00 GA_1Nc_E OIALrALANCt .00 .00 25.00_ 25. 00 VO . 00 25. 00 Rent a..1 Pr 03 DUE DetTE INV B.m NCED41"DALEAcE PTOTAL BALAv4CEL 11/23/2010 _.� 00 _..._�. .�EN EAL_NCE _ 00 . 66 25. 00 CUSTOMER TOTALS: k.'b. 00 . 07) N'TELLY B 913-•9 -a51441 ROnt.o 1Prop .Y TYPE Inti_+ DATE DUE DATE ipYl 2A'tiEE__ .__ 4 BALM!: R Etll BALANCE": TOTAL_LANCE RE Rye ._. 10/26/2010 11/26/ 1.. 25.00 .._ ._.-. _ _ . 00 25. 00 aoo1 ,�, , .i_ 1.1',- 5151T011FR TOTALS; R 4RIj-a(4,-303-00l TE 4W 5 04010 FORD ss9}3-a5-Z1?)•o3) 1(/ (� p -10--1-�/`-.�3lkkYIRE h[I.tL 16/26/2 f n Y rop 4 TE 11/26/2010 .•-_ 00 25.00 2.5. 00 . Or . 00 29. 00 CUSTOMER TCTALS 35. 00 RantalProp 1 AIY_ ` ?:_II.,i:ALr!. ?6107 12/05/2010 .... - 00 P. OC .00 CUSTOMER TCTAL0: 25.00 ent.;,31F'r p. 2_. 00 P5:N BALANCE TOTAL BALANCE 00 00 -__ 35. 00 OD .00 35.00 a 35 0 .. _ 00 _PEN BA, .!;14C, ,TOTAL, BALANCE 00 23. . .. 00 .00 25. 00 PEN, *LA,NCE 70'4 gALA,NC= ---_ 00 .._.------ 35. 00... Black Hawk County Detailed Parcel Report Page 1 of 2 BLACK HAWK COUNTY REAL ESTATE ASSESSMENT AND TAX INFORMATION Parcel ID Deed Holder Tax Mail to Address 8912-19-255-007 NICHOLS,HAROLD NICHOLS,HAROLD 315 MORRELL AV EVANSDALE, IA 50707-0000 PDF No. Map Area Contract Buyer 7 EWTLO-09 WA HA 0902 Property Address Current Recorded Transfer 1823 CITY V EW ST WATERLOO IA 50703-0000 Date Drawn Date Filed Recorded Document Type 8/30/2010 9/2/2010 2011 004367 D SALES BUILDING PERMIT Date Amount NUTC/Type Date Number Amount Reason 8/30/2010 37,250 NORMAL ARMS -LENGTH TRANSACTION / Deed 8/17/2004 WA HA 0902 1,200 A/C 7/28/2004 WA HA 0779 150 Misc 11/23/20051,171,290 Dwelling RESIDENTIAL SALE OF TWO OR MORE PARCELS -SINGLE CONSIDERATION / Deed 7/15/2004 WA 1292 89,012 New Dwlg 0 10/14/2004175,000 19,387 RESIDENTIAL SALE OF TWO OR MORE PARCELS -SINGLE CONSIDERATION / Deed 8/9/2004 417,000 RESIDENTIAL SALE OF TWO OR MORE PARCELS -SINGLE CONSIDERATION / Deed ASSESSED VALUES/CREDITS Year Class 2011 R 100% Value Land Dwelling Bui ding M/E Total Acres 5,100 33,100 0 0 38,200 0 Taxable Value Land Dwelling Building M/E Total 2,588 16,799 0 0 19,387 Year Class 2010 R 100% Value Land Dwelling Bui ding M/E Total cr 5,460 65,740 0 0 71Total,200 0es Taxable Value Land Dwelling Building M/E Total 2,650 31,904 0 0 34,554 Year Class 2009 R 100% Value Land Dwelling Bui ding M/E Total Acres 5,460 65,740 0 0 71,200 0 Taxable Value Land Dwelling Building M/E Total 2,561 30,838 0 0 33,399 TAX INFORMATION ASSESSMENT YEAR 2010 PAYABLE 2011/2012 Tax District 940001 - WATERLOO Gross Value Taxable Value Military Exemption Levy Rate Gross Tax Net Tax Corp 71,200 34,554 0 42.69322 $1,475.22 $1,476.00 Nocorp 0 0 0 0 $0.00 Homestead Credit 'Disabled Veteran Credit (Property Tax Relief Credit rg CreditjFamily Farm Credit http://www2.co.black-hawk. ia. us/website/bhmap/bhitepDet.asp?apn=891219255007 11/3/2011 Black Hawk County Detailed Parcel Report CorpC1$0.00 1$0.00 1$0.00 Nocorp 1$0.00 Page 2 of 2 $0.00 LEGAL CITY VIEW HEIGHTS E 66 FT N 145 FT BLK 8 SN #122001 LAND Basis Front Rear Side 1 Side 2 Lot Area Acres Front Foot 145 145 66 66 0 9570 0.22 Totals: Bedrooms Below 6 0 3 0 9570 0.22 DWELLING CHARACTERISTICS Type Style Single -Family / Owner Occupied Mfd Home Double) Year Built Area Heat C Attic 2004 1404 Yes Yes None Total Rooms Above Total Rooms Below Bedrooms Above Bedrooms Below 6 0 3 0 Basement Basement Finished Area No Basement Floor None 0 0 Foundation Flooring Pier Carp / Vinyl Exterior Walls Interior Finish Vinyl Drwl Roof Asph / Gable Non -Base Heating Floor/Wall Pipeless Handfired Space Heaters 0 Plumbing 2 Full Bath http://www2.co.black-hawk.ia.us/website/bhmap/bhRepDet.asp?apn=891219255007 11/3/2011 CITY OF WATERLOO Council Communication City Council Meeting: November 14, 2011 Prepared: November 8, 2011 Dept. Head Signature: Eric Thorson, PE., City Engineer # of Attachments: 1 SUBJECT: REQUEST BY MARK MINARD FOR A CONCRETE DRIVEWAY TO BE LOCATED AT 706 CLOVERDALE AVENUE Submitted by: Eric Thorson P.E., City Engineer Recommended City Council Action: I have reviewed this request and recommend its approval subject to the following provisions: 1. Work to be performed by an approved and bonded contractor. 2. A permit is to be obtained from the office of the City Engineer prior to construction. 3. All work shall be performed under the supervision of the City Engineer and at no cost to the City of Waterloo. $7.00 cash for the purpose of recording this waiver and a copy of the legal description have been provided to the City Clerk's office. Summary Statement Attached is a request from MARK MINARD for construction of a concrete driveway and placing a driveway or sidewalk on City right of way on an unimproved street, to be located at 706 CLOVERDALE AVENUE, Expenditure Required None Source of Funds None Policy Issue N/A Alternative None Background Information: This is a waiver of the City's Standard Specifications for Driveway Construction. It requires Council approval so that it can be recorded to the property, so that the waiver requirements run with the property ownership. Legal Description: CLOVERDALE ACRES REPLAT NO 1 LOT 21 Oct 28 11 02:06p Action Garage Builders WAIVER Date: -Z5 -// Honorable Mayor and City Council City Hall Waterloo, IA 50703 Council Persons: 319-352-4541 p.1 I hereby request a waiver to the driveway and sidewalk specifications for the construction of a 4.?/c- �� driveway or sidewalk located at (concrete or asphalt) 6 ' Z&// 0/ ti Z. 6)0~1 i /.P -Y,f1- 6t/"1" .A.) • (Address) This waiver is needed because of: special surface texture (Le., exposed aggregate, brick stamped pattern, naving brick) to be used on the concrete approach. elimination of the sidewalk section due to the inability to meet requirements of the driveway and sidewalk policy, paragraph 1. asphalt driveway with the elimination of the sidewalk section. /placing a driveway or sidewalk on City right of way on an unimproved street. I agree to the following: 1. To remove and replace this driveway to an official elevation at no additional expense to the City of Waterloo at such time that sidewalk is constructed. 2. To remove and replace the private driveway, as needed, to an official elevation at no additional expense to the City of Waterloo at such time that curb and gutter is constructed. 3. To pay for any additional expenses for the replacement of any such textured driveway or sidewalk that has been removed for any City of Waterloo project. 4. To employ a bonded contractor who shall obtain a permit from the office of the City Engineer. 5. To have the driveway constructed according to the specifications and policies of the City Engineer and under his supervision. 6. This waiver is for this property only. Attached herewith is a payment in the amount of seven dollars ($7.00) for the purpose of recording this agreement. Respectfully submitted, fe 41/0169 Printed Name of Property Owner Signature of Property Owner TRAVEL REQUEST CITY OF WATERLOO FINANCE DEPT. STAFF ONLY LINE ITEM USED 010 03 8400 1346 FY /I BUDGETED __&o EXPENDED YTD / THIS REQUEST /SIJ. (, v LEFT AFTER THIS REQUEST DATE Original - Clerk/Finance S' (0 -0)/ // Copy - Department NAME(S) AND POSITION(S): Michelle Weidner, Chief Financial Officer DATE: 10/21/2011 NAME OF CLASS / MEETING: 16th Annual Governmental GAAP Update DESTINATION: Webinar — in office DEPARTURE POINT IF NOT WATERLOO: DEPARTURE DATE: 11/3/2011 RETURN DATE: 11/3/2011 DATE(S) OF MEETING: 11/3/2011 PURPOSE OF TRAVEL: Class covers governmental auditing and accounting principles update. WILL TRAVEL REQUIRE ADDITIONAL PERSONNEL: x COST $ YES NO METHOD OF TRAVEL: N/A CITY VEHICLE AIRFARE DEPARTING FROM: PRIVATE VEHICLE ESTIMATE OF COST: LODGING TAXI MEALS PARKING 180.00 REGISTRATION AIRFARE MILEAGE/FUEL MISC/TOLLS TOTAL FOR ALL: $ 180.00 BUDGET LINE ITEM: 010 03 8400 1346 x GRANT REIMBURSABLE YES NO REQUIRED CERTIFICATION YES NO TOTAL: $ 180.00 PER PERSON I BELIEVE THIS TRIP SERVES A PUBLIC PURPOSE AND IS NECESSARY AND BENEFICIAL TO THE CITY OF WATERLOO I APPROVE THIS TRAVEL REQUEST DEPARTMENT HEAD M OR DATE K:\Shared Goodies\Forms\Travel Request Form January 2010 DATE it I pt TRAVEL REQUEST CITY OF WATERLOO FINANCE DEPT. STAFF ONLY LINE ITEM USED QW% /g_((//6— //'! FY��/ :4 BUDGETED 4/a0, 00 EXPENDED YTD _ iyr(i(g ._ / THIS REQUEST 30-3.0d LEFT AFTER THIS REQUEST 3/ 3 U� �S DATE Mt., // / , 1 / Original - Clerk/Finance Cosy - Department NAME(S) AND POSITION(S): Mike Schipper (and 2"d possible instructor) DATE: October 24, 2011 NAME OF CLASS / MEETING: Fisher Controls Technician Recertification DESTINATION: Marshalltown, IA DEPARTURE POINT IF NOT WATERLOO: DEPARTURE DATE: 11-9-11 RETURN DATE: 11-11-11 DATE(S) OF MEETING: 11-10 & 11-11 PURPOSE OF TRAVEL/TRAINING: To teach Hazardous Materials Technician Recertification class for Fisher Controls Industrial Haz Mat Team. (As class will begin at 7 am we are providing a hotel room for the instructor so that he is better prepared to class delivery) Expenses will be reimbursed through Invoice WILL TRAVEL REQUIRE ADDITIONAL PERSONNEL: X COST $ YES NO METHOD OF TRAVEL: CITY VEHICLE X PRIVATE VEHICLE AIRFARE DEPARTING FROM: ESTIMATE OF COST: 160.00 LODGING TAXI 50.00 MEALS PARKING REGISTRATION AIRFARE 93.00 MILEAGE/FUEL MISC/TOLLS TOTAL FOR ALL: $ 303.00 BUDGET LINE ITEM: )( X GRANT REIMBURSABLE YES NO X REQUIRED CERTIFICATION YES NO TOTAL: $ PER PERSON I BELIE IS TRIP SERVES A PUBLIC PURPOSE I APPROVE THIS TRAVEL REQUEST CITY OF W ER D BENEF AL TO THE AN ' S NEC:SS /0, DEPATNT HEA P MAYOR (6 DATE DATE K:\Shared Goodies\Forms\Travel Request Form January 2010 ((4/ (4J toe,.;-Rawt TRAVEL REQUEST I''" 1 CITY OF WATERLOO -ne,6,41-- ,/�tu)) FINANCE DEPT. LINE ITEM USED FY _2012_ BUDGETED EXPENDED YTD THIS REQUEST LEFT AFTER THIS REQUEST STAFF ONLY 010-11-1100-1346 1406)6).(1 J /335K`r2 2o7GW. up NAME(S) AND POSITION(S): Sergeant Michael Rasmussen DATE: DATE ? , /l ' 20 / / No emalfgi a2041$rk/Finance eopy - Department NAME OF CLASS / MEETING: Less Lethal Instructor Course DESTINATION: Plainfield, IN DEPARTURE POINT IF NOT WATERLOO: DEPARTURE DATE: Nov. 27, 2011 Return Date: Dec. 2, 2011 DATE(S) OF MEETING: Nov. 28 -Dec. 1, 2011 PURPOSE OF TRAVEL: Lt Cirksena is requesting authorization to send Sergeant Rasmussen to the Less -Lethal Instructor Course on Nov. 27th - Dec. 1St, 2011, in Plainfield, iN. Sgt. Rasmussen is a member of the Waterloo Police Department Tactical Unit. As a member of the tactical unit he is responsible for responding to high-risk dangerous weapons calls. This class will instruct students on the use of OC Aerosols, specialty chemical munitions and distraction devices that out tactical unit uses. This course will then allow Sergeant Rasmussen to instruct the tactical team members in the use of these weapons. This training was originally approved on Aug. 22, 2011 and Sgt. Rasmussen was registered to attend a class in Elk River Minnesota. The original class was cancelled and rescheduled for a few weeks later due to scheduling conflicts with the training facility. Due to the postponement of the class several attendees cancelled and the class had to be cancelled. This class is now available and the registration fees will transfer to this class. A city vehicle will be needed for travel to the training facility. WILL TRAVEL REQUIRE ADDITIONAL PERSONNEL: COST $ YES NO METHOD OF TRAVEL: XX CITY VEHICLE AIRFARE DEPARTING FROM: PRIVATE VEHICLE ESTIMATE OF COST: $750.00 LODGING $225.00 MEALS $895.00 REGISTRATION $200.00 MILEAGE/FUEL TOTAL FOR ALL: $ 2070.00 TAXI PARKING AIRFARE MISC/TOLLS BUDGET LINE ITEM: x GRANT REIMBURSABLE YES NO x REQUIRED CERTIFICATION YES NO TOTAL: $ 2070.00 PER PERSON I BELIEVE THIS TRIP SERVES A PUBLIC PURPOSE AND IS NECESSARY AND BENEFICIAL TO THE CITY OF WATERLOO I APPROVE THIS TRAVEL REQUEST 4'1 DEPARTMENT HEAD MAYOR li-(- DATE DATE II lig c?rmi TRAVEL REQUEST CITY OF WATERLOO NAME(S) AND POSITION(S): Todd Henrich, LS Electrician NAME OF CLASS! MEETING: Class on mechanical code DEPARTURE DATE: 10/4/2011 PURPOSE OF TRAVELITRAINING Training REQUIRED for plumbing license. WILL TRAVEL REQUIRE ADDITIONAL PERSONNEL: DATE: FINANCE DEPT. STAFF ONLY LINE ITEM USED C2th h ZPO FY BUDGETED )00. 00 EXPENDED YTD THIS REQUEST LEFT AFTER THIS REQUEST BATE Ori.inal - Clerk/Finance 10/24/2011 a, - be•artment DESTINATION: Johnstone Supply, Waterloo IA DEPARTURE POINT IF NOT WATERLOO: ATE(S) OF MEETING: 10/04/2011 x COST $ YES NO METHOD OF TRAVEL: CITY VEHICLE x AIRFARE DEPARTING FROM: PRIVATE VEHICLE BUDGET LINE ITEM: ESTIMATE OF COST NG TAXI x GRANT REIMBURSABLE LODGING YES NO PARKING MEALS REQUIRED CERTIFICATION AIRFARE x 110.00 REGISTRATION IVIISCITOLLS YES NO MILEAGElFUEL TOTAL: $ 110.00 PER PERSON TOTAL FOR ALL: $ 1 10.00 I BELIEVE THIS T RIP SERVES ENEF C A TO THE SE AND IS NECESSARYAND CITY OF WATERLOO DEPAR ENT HEAD I APPROVE THIS TRAVEL REQUEST // J-? -- DATE DATE uest Form January 2010 K:\Shared Goodies\Forms\Travel Req CITY OF WATERLOO Boards & Commissions Committee and Council Communication City Council Meeting: November 14, 2011 Prepared: November 4, 2011 Dept. Head Signature: # of Attachments: SUBJECT: Cable TV Commission Appointments Submitted by: Suzy Schares, City Clerk Recommended City Council Action: Motion to approve and place appointments on file for: Appointee Board/Commission Expiration Date New or Re- Appointment Jane Scott Cable TV Commission December 31, 2013 Re -Appointment Barbara Heinze Cable TV Commission December 31, 2013 New Appointment Summary Statement: Expenditure Required: N/A Source of Funds: N/A Policy Issue: N/A Alternative: N/A Background Information: This would bring the commission up to date with appointed commission members. Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN M. HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD A! -Large STEVE SCHMI'I"T A! Large CITY OF WATERLOO, IOWA CITY ATTORNEY'S OFFICE 715 Mulberry St. • Waterloo, EA 50703 • (319) 2914327 Fax (319) 291-4571 JAMES E. WALSH, JR, City Attorney • DAVID R. ZELLHOErl x, Assistant City Attorney November 14, 2011 Mayor Buck Clark and City Council City Hall Waterloo, IA 50703 Dear Mayor Clark and Council Members: I have examined the bonds filed with the City Clerk/Auditor's Office up to the close of business on November 10, 2011. Of the bonds submitted, were approved and LTD rejected, as hown on the attached list. Very truly yours, Assistant City Attorney DRZ:lc CITY WEBSITE: www.cityofwaterlooiowa.com WE'RE WORKING FOR YOU! An Equal Opportunfy/Affirmative Action Employer BONDS FOR COUNCIL APPROVAL NOVEMBER 14, 2011 RIGHT OF WAY CONSTRUCTION BOND (EXPIRES 4/30/12) AMOUNT: $5,000.00 71191466 PROGRESSIVE CONCRETE, INC. CEDAR RAPIDS, IA CITY OF WATERLOO Council Communication City Council Meeting: October 10, 2011 Prepared: October 6, 2011 Dept. Head Signature: # of Attachments: ',Ali NCIH=4A,i \94it. 6ivc • •a.t. t1i/10,111 SUBJECT: Request the City Council adopt resolutions to preliminarily approve the request for the bid document and specifications for General Contractor Services to construct the Public Works Building Project at 625 Glenwood Street, Waterloo, IA and to instruct the City Clerk to publish notice of hearing on bid document, specifications etc, as November 14, 2011. Submitted by: Mark Rice, Public Works Director Recommended City Council Action: Approval Summary Statement: Expenditure Required: Source of Funds: I -Jobs Grant, BHCGA Grant, GO Bond proceeds Policy Issue Alternative Background Information: Request council approve setting date of hearing for bid opening on General Contractor services to construct City of Waterloo Public Works Building project. ADDENDUM #2 November 4, 2011 (Addendum #1 is in the spec — Volume I — Section 00910) CITY OF WATERLOO IOWA PUBLIC WORKS FACILITY BIDS DUE: MONDAY, NOVEMBER 14, 2011 AT 4:00 PM at the City Clerks Office located at 715 Mulberry Street, Waterloo, Iowa. All proposals received will be opened in the Council Chambers in the City Hall in the City of Waterloo, Iowa at 5:30 p.m. To all Contract Bidders of record. This Addendum is issued to modify, explain or correct the original Drawings and Specifications as noted below, and is hereby made a part of the Contract documents. Please attach this Addendum to the Specifications in your possession. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. PRE-BID WALK THRU WILL BE MONDAY OCTOBER 24, 2011 AT 10:00 A.M. AT THE CONSTRUCTION SITE - 625 GLENWOOD AVENUE, WATERLOO, IOWA. This Addendum consists of 23 written pages and 2 drawing sheets If you are bidding as a General Contractor please notify our office by email jonw(a�kuenvarch.com and IindaCa)kuenvarch.com The list of City forms that MUST accompany your bid are: 1. Form of Bid Bond 2. Non -Collusion Affidavits of Prime Contractor 3. Reciprocal Resident Bidder Preference and Resident Bidder Certification — See the Attached sheet — to be included with City forms - this was omitted in error. 4. Potential Item of work for MBE/WBE participation a. MBE and or WBE Prebid contact information form 5. Form of Bid or proposal All the following Acceptable Manufacturer's products below must meet or exceed written specifications. Section 08000 Section 10165 Section 15100 Section 15820 Section 15830 Section 15760 West Central Manufacturing General Partitions AST Poly Drain Polymer Concrete Channel Louvers & Fire Dampers: • Pottorff • Louvers and Dampers, Inc • United Enertech Destratification Fans: Rite Hite Electric Wall Heaters: Raywall 1 Section 15100 Section 15100 Emergency Eyewash: Speakman Circulation Pumps: Taco City Forms 1. Reciprocal Resident Bidder Preference and Resident Bidder Certification — See the Attached sheet — to be included with Citv forms - this was omitted in error. Division 7 Thermal and moisture Protection 1. See attached 07840 Fireproofing Spec — 10 pages Division 10 Specialties (listed as Division 11 Equipment twice) 1. Change the first Division 11 to Division 10 Division 11 Equipment 1. Delete any reference to Sections 11144 Fuel Dispensing and Monitoring System AND 13120 Salt Storage Building. These sections do not pertain to this project. This section should be ADDED to the INDEX - Division 13 SPECIAL CONSTRUCTION 13122 Metal Building Systems 12 pages Sheet 9.1 — Foundation Plan 1. On this sheet change the reference to Alternate #6 to Alternate #10 at the existing building areas where a new overlay floor is being called out. Section 04500 Masonry Restoration and Cleaning 1. This section is for the existing buildings and should be bid under alternate #6. Aliso see notes under addendum #1 (00910). Section 08300 Special Doors 1. Haas brand,model CHT -2016 is approved on this project 2. As noted all low voltage wiring required by overhead door contractor is by this overhead door contractor; consisting of a minimum of wall stations, electric safety edges, photo safety beams. Section 03300 Concrete 1. PVC material or our TPER (thermo-plastic elastomeric rubber) material would be acceptable as an alternative. Questions and Answers: 1. Sheet 6.1 and 6.3 'Q' What bid do the doors go in that are on the demarcation line of the alternates? All doors are part of the alternate the wall falls within. A. All doors on sheet 2.1 are part of the base bid. See door and room schedules each list what alternate they fall. 2 2. Sheet 2.1 First Floor Plan — Base Bid 'Q' Are the foundations, CMU walls, door and frame shown within ALT #1 on Sheet 2.1 (Walls around Elec Room 141 a) to be included in the Base Bid? A. Yes all the walls, columns and wall footings shown on this plan are part of the base bid — From footing to roof. All other footings are pad the alternate area they fall within. 3. Sheet 1.2. Are the areas where the future Salt Storage structure and the Fuel Island areas to be paved at this time as part of the base bid? Or are these areas to be left as a gravel surface only? A. Salt Storage and Fuel island will be left as a gravel surface under the base bid. 4. Sheet 1.2. A note on the plan at the Standby Generator Concrete Pad refers to sheet El for more info. It doesn't show up on that sheet, but a section through the pad is on 6/1.2. That detail shows a pad on grade surrounded by grass. The location on the plan is shown as concrete paved. Does the pavement butt up to the pad or is the pad poured on top of the pavement? Also, is the electric utility providing the transformer pad or are we? Sheet El 5 is calling for containment around the pad. If we are to provide the pad and containment, we will need a drawing in order to construct it. Please provide that drawing. A. See attached drawing for the utility pad and containment area that are part of the base bid. 5. Sheet 2.1.1. Your Alternate descriptions are a bit cloudy. Are all of the interior strip footings and fdns part of alternate #3 or part of the base bid? I assume that the interior column footings are part of the base bid because they support the roof structure. Please clarify. I also have the same question regarding Alternate #1. A. All exterior walls & footings are part of Base Bid, except the area indicated for alternate 2. Concrete slabs are part of each alternate. 6. Spec section 01030 Alternates, What are the limits and scope of work for Alternate 10? It's not shown on the drawings. Is this actually the work labeled as Alternate #6 on sheet 9.1, the 4" slab overlay? If we overlay these floors, how does that impact detail 22/5.1, the trench drain detail? Or is the trench drain in these areas part of Alternate 10 (or 6 on 9.1) and not included in the base bid? A. On sheet 9.1, area indicated as Alternate 6 should read alternate 10. The trench drain is part of Base Bid 7. Sheet 2.6. The note at the wall along Grid Line U.2 says to demo this wall as part of Alternate #7. Alternate #7 is identified as providing and installing the OH Bridge Cranes. What does removing this wall have to do with that? A similar note occurs on sheet 2.1. Shouldn't this wall removal and replacement be part of the base bid, or perhaps even alternate 10. These notes, if I recall are remnants from the project bid in May. Please clarify. A. Wrong Note: On sheets 2.1 & 2.6 on the East wall of the existing building the note that indicates the following: "ALT BID #7 New Precast Wall Panels" should be eliminated. The Note should read "Existing precast wall panels to remain" 3 8. Spec section 01030 Alternates & drawing 2.1. It appears that Alternate 2 extends the building to the east. Does this alternate only include adding the south precast wall, footings and foundations, SOG, roof framing and roofing? I am assuming that no work associated with Alternate #3 is included in this alternate. However, does the SOG stop 4' north of Grid Line 4.3, same as the base bid? Again, please clarify. A. Alternate 2 is adding the South Precast Panels, foundations, metal structure, roof structure, and roof system in the area indicated on plans. Grade on slab is part of Alternate 3 south of line 4.3. North of line 4.3 the SOG will be part of alternate 2 (concrete slab type 'C'). 9. Spec section 01030 Alternates. Alternate #9, Vehicle Wash System. Are the pits and trench drains associated with this system to be included in the base bid or added for the alternate? A. Pit and trench will be part of the base bid 10. Sheets 2.1 and 9.1 call out a detail for one of the pits as being 8/4.4. 8/4.4 is a wall section, not a pit section. Please provide details of these pits (if I recall from the May bid, the info is available from the vendor, so why not provide it? A. The pits of the Vehicle Wash Area are part of Base Bid. Pit Detail 8/4.4 is wrong. Should read 1/4.2. 11. Spec section 01030, Alternates, Alternate #6. Is this just the topping in this room, and is the new for called out in Alternate 10, just the floor topping in room 165? The Bid Form provides no other information regarding scope. What is all included in this Alternate? The work scope is not defined. A. Alternate 6 is for the work required on sheet 2.1.2 and 2.8.1 Alternate 10: will be a new concrete floor overlay as noted on sheet 9.1. 12. Spec section 01030, Alternates, Alternate 11. This alternate calls for painting of rooms 165, 167 & 168. What all are we to paint? Floors, walls, roof framing and ceiling? Again, clarify the scope. A. Alternate 11: Paint All Walls, Roof Framing, & Ceiling Deck, and any exposed duct & piping on rooms 167 & 168 13. Spec section 01030, Alternates, Alternate #5.Does this alternate include the 8'-9.5" wide section on the east side of Grid Line E? Also, are the stairway enclosure walls with associated fdns and stairs at the east end of the mezzanine considered part of this alternate? A. Alternate 1 is to include the mezzanine section east of Line E as noted on sheet 2.2.1: 14. Do we price out the Alternates 13 and 14 against the base bid only — or also against the Alternates 1 and 2 collectively? A. Alternate 13 should be compared to Base Bid and Alternate 2 and Alternate 14 should be compared to Alternates 1 and 3. 15. Section (08700) The specs asks for master key all locks in accordance with owners master key system. A. Owner does not have an existing system that needs to me match. 16. What is the embedment, thread length and configuration of the 1" anchor bolts as noted on 9, 10 and 12 /9.4? A. Size would match AB -1 on 8/9.4. 17. Are the "steel attachment angles" as noted on 13 & 18/5.1 and 6 &13/5.2 by the overhead door provider? A. Attachment is the requirement of the overhead door contractor 4 18. How will the brace rods connect to the building? A. Connection pates high and low on the columns 19. Is Alternate #2 to include a Mezzanine? A. No Mezzanine for this area; mezzanine is part of Alternate 3. 20. Should all structural members which support the crane be excluded from the Base Bid and added in Alternate 7? A. No all steel for the crane is part of base bid except the crane rail that is the responsibility of the crane contractor as noted in the specifications. 21. First, In division 04200, Part 2, at 2.1, B.7. the note refers to Light Weight Aggregate Units. Typically, I don't believe that County Materials offer their Heritage Series Brick in Lightweight, so I wanted to verify that you wanted something other than the norm? Also, on the Split Face Architectural Block colored units, they would also typically not be made in a Lightweight aggregate, so the same question would apply. A. The lightweight units are only the standard interior units on the mezzanine. 22. Not used 23, I would like to bid the Window Blinds for the Waterloo Public Works job. I have not found the plan sheet with the window sizes. Also, it looks like you want blinds on the interior sidelights, I have not found the plan sheet for the doors and sidelight sizes. Can you direct me to the correct pages? A. See sheet 8.1 for location and 7.1 and 7.2 for sizes that aren't listed on the plan. See attached sheet for exterior window sizes that receive blinds too. 24. Not used 25. Liquidation clause in the spec — 00810-6. There is no length of time listed. A. no damage clause will be enforced on this project. Contractor to note number of days on bid form. 26. There should to be an idf added for the lines that are over 300ft i would suggest adding it in utility room 179 this will require adding a 25piar phone line and a 6 strand fiber to connect data room 125 to the idf room. A. Yes the above needs to be added to the system as part of alternate #4 per sheet IT -1. 27. The specs call for Leviton jacks and systemax patch panels or equal would Uniprise be an perceptible substitute? A. Approval will need to be met during shop drawing process. 28. Would Bogan speakers and horns be ok to bid on this job? A. Approval will need 5 to be met during shop drawing process. 29. What color would you like the face plates to be? A. color to be white or Ivory Where Exactly is the CATV to be routed to? A. data 125 30. Are the existing ballast roofs going to be replaced and have the same specifications as the new roofs? Or will they be left alone, or will they be modified? A. The existing roofs are a built up roof system. The roof over existing parking 168 and shop 167 will be replaced under alternate #6. The roof over existing building (grid lines L to U.2 and 2.4 to 5.4) will be replaced under the base bid. See details 4.6 and 4.8. The system will be the same system all except these areas will require a fully adhered system not ballasted. 31. I can't find details for the canopy roofs. It says they will be ballast, but I don't know if there is a gutter, drain, gravel stop, parapet, or a combination of a couple? A. The office area canopy are part of the (13120) complete system. 32. Could you clarify Alternates #2 and #6 for me? How do they pertain to the roofing aspect? A. Alternate #2 will be a complete building area grid lines 11.3 to 5.4 and Q.2 to U.2 with a complete roof system per details 1 /4.3 and 3 /4.3. See notes above for Alternate #6. 33. Plan page 2.3 - On Grid line 13 and a looks like there are 2 wythes of masonry at the corner being used. Is that supposed to be a 4" cmu over 8" cmu backup? Similar look as you go along grid line 13. Please clarify. A. See sections 3 /4.4 and 4 /4.4 units just go from 8" to 12". 34. Section cut 4/4.4 show a wider unit being used. Is this a 12" cmu full height? A. Yes 35. Section cut 1/4.4 calls out in the notes at the base of the wall 04200 12" accent. Are we using 12" bed depth block at the base of the wall and 8" bed depth block at the top of the walls? What is the bed depth of the 1/2 high blocks in the middle of the wall? A. Should read 8" unit. 36. Section cut 2/4.4 calls out at the top of the window to parge the back side of block. Is that to be a mortar parge? Is it only at the block that projects out? Is this required at all? A. Yes parge complete back side of all office block walls as noted. 37. Plan page 2.1.1 - Are the interior masonry walls for rooms 183, 184, 185, 188 & 189 part of Alternates #2 or #3? A. Part of alternate #3 38. Plan page 2.2.1 - Is stair 186 part of Alternate #5 or is it included in Alternates #2 or #3? A. Part of Alternate #3 39. Plan page 2.1 - On grid line 1, between grid Q & Q.2 has a section cut 5/4.8. There is no such detail, please clarify. A. Yes see sheet 4.8 and 2/9.2. and as noted these are part of alternate #6 6 40. Specification Section 910 — Addendum #1 — Page 910-2 & 3 — Under Section 04200, items #1 and #6 refer to Detail 8/5.1. This detail is a control joint detail. Please clarify how it pertains to these to items. A See detail on sheet 2/9.2. 41. Plan pages 4.9, 4.10, 4.11 & 4.12 — Please identify the location of this wall sections cut on the floor plan. A. On sheet 9.2.1 details noted as 4.1 should read 4.9, 4.2 should read 4.10, 4.3 should read 4.11 and 4.5 should read 4.12. 42. Alternate #6 ----It appears the unit heaters and exhaust fans that appear inside the Alternate #6 box are in the base bid (according to the schedule). Is there No HVAC work in Alternate #6? A. Correct the HVAC, plumbing, fire protection and electrical are part of the base bid as noted. 43. Is the Rooftop Unit Schedule on Page H7 correct? RTU1,2,5 are in Alternate #1 and RTU3,4 are in alternate #4? A. Yes correct 44. In alternate 1 & 3, concrete part, does it include both concrete footings ST -1 & concrete slabs? A. Yes except exterior and interior walls that are on sheet 2.1 and are part of the base bid. 45. Section 04200 Unit Masonry, 2.1, B, 3&4: Includes reference to "Block #2" and "Block #1". Sheet 2.7.1 has references to "Concrete Brick #1" and "Concrete Brick #2". Please clarify the difference between references to brick vs. block. A. All should read block 46. Section 09900 Painting: Please provide a product specification for traffic line paint. 47. Section 10350 Flagpoles, 2.1, C, 1: Classification sub -paragraph lists ground set pole, remainder of specification describes wall mount type. Please clarify. A. Flag poles are wall mounted. 48. Section 11142 Vehicle Wash System: Section is noted as being part of Alternate #3 which is inconsistent with bid form. Please clarify. A. Vehicle Wash System is part of alternate #9. 49. Sheets 4.2 & 9.1. Section 2/4.2 appears to show an 8" slab in the locker room area. Is that correct, or should this actually be a type A, 4" slab? It's not called out on sheet 9.1 at the men's locker room area, but it is called out at the women's locker room area. A. Locker rooms will have type 'A' 7 50. Sheet 9.1. What type of slab is required in the Training/Lunch Room area? The Foremen/Strategy Area? The Oil Distribution Room? None of these are called out on 9.1. A. Room 158 will have type TB'; room 111, 132 and 134 to have type 'A'. 51. Spec section 02831 Chain Link Fence and spec section 01030.. The spec identifies the Fence as Alternate 10. In spec section 01030, alternate 10 is called out as adding the concrete floor in the existing buildings. Was this fence reference to Alternate 10 a left over note from the May bid, or is the fencing in Alternate 10 along with the floor slabs? Or is the fencing actually to be part of the Base Bid? Please clarify. A. All site fencing and gates are part of the base bid please disregard all reference to Alternate #10 within this section. 52. Spec section 07310 Shingles. I am assuming that since the Salt Storage Stucture is not part of this bid that we can ignore this spec section. Is this correct? A. Yes this section is not to be used for this bid. 53. Sheet 2.4. The OH door numbers are missing at the south walls of rooms 182 & 184. A. Door letters can be found on sheet 2.7 (doors D and F) 54. Sheet 6.1 and spec section 00020. Are doors J, K , L , M, N, 0, P, MM, NN, 00 & PP part of Alternate 6, or in the base bid? At sheet 6.1, doors J, K, L ,M, N, 0 & P are not labeled on the floor plan. A. Overhead doors J, K , L , M, N, 0 & P and related work are part of alternate #6. Overhead doors MM, NN, 00 & PP are to be installed in the base bid but not if alternate #6 is taken so the cost of these doors should be deducted in alternate #6 and the cost to masonry infill the existing openings needs to be part of the alternate #6 bid. 55. Spec sections 13120 & 11144. I am assuming that neither of these spec sections apply to this project, since both are labeled as future on the drawings and are leftovers from the May bid. Is this a correct assumption? A. Correct these sections are future and due to being green some of the recycled books still have these sections within. These sections will not be part of this bid. 56. Spec sections 10990 & 00020. The Pressure washer is called out as Alternate #4 in spec section 10990 and Alternate #12 in spec section 00020. Which is correct? A. Delete reference to the pressure washer it is no longer part of the bid (owner will supply). Equipment under alternate #12 are the air and water reels noted on sheets 2.1.3, P1, P2 and P4. 57. IPC has a company policy to not use Polyisocyanurate in our precast panels. The spec reads that extruded is an acceptable alternate, but we cannot achieve the required R -Value in either a 10" or 12" panel. In a 10" panel we would be able to get an R-17 and in a 12" panel we would be able to get an R-19. Is this acceptable? A. Wall panel insulation can be R-19 - see addifional items in addendum #1 under spec section (00910) 8 58. Description of Alternate one on the Bid form (from grid lines 13 to 9.3 and D.9 to H.5) are different than what is shown on sheets 2.1,2.1.1 and 2.1.2 Please clarify. A. Alternate 1 on the Bid form should read from grid lines (10.2 to 7 and A to D.9) and (13 to 10.8 and D.9 toJ.5) and (10.8 to 9.3 and D.9 to H.5)- see sheet 2.1.1 fora clear outline. Note the block walls that show up on sheet 2.1 around and east of elect rm 141a are part of the base bid. These walls are used to mount the water and electrical services as shown on sheets P1 and E7. 59. Alternate 4 as shown on sheets 2.1, 2.1.1, and 2.1.2 is shown as being the Base Bid on sheets 2.2, 2.2.1, and 2.2.2. Please clarify. A. On sheets 2.1, 2.1.1, and 2.2.2 we are showing the roof over the office area. The building shell, structure, exterior walls, & roof, are part of the Base Bid. Alternates of Interior of office areas are as indicated on sheets 2.1, 2.1.1, and 2.1.2 60. The Area from grid lines 13 to 10.8 and D.9 to just right of J.5 is called out as alternate One on sheets 2.1, 2.1.1, and 2.1.2 but is indicated as Base Bid on sheets 2.2, 2.1.2, and 2.2.2. Please clarify. A. On sheets 2.1,2.1.1, and 2.2.2 we are showing the roof over the office area. The building shell, structure, exterior walls, & roof, are part of the Base Bid. Alternates if interior of office areas are as indicated on sheets 2.1, 2.1.1, and 2.1.2 61. Section 01030 Alternates, Alternate #1: Is the elevator pit foundation included in the base bid or in Alternate #1? A. The elevator pit will be part of the base bid - concrete pit only and east precast wall. The precast wall should be over size by16" in width and 8" in height so the elevator door can be installed and 8" masonry can be infilled around the door frame as part of alternate 1. 62. Drawing Sheet 1.2 Site Layout and Pavement Plan: Drawing shows pavement and fencing as if Alternate #2 has been accepted. A. Under the base bid the fencing will be extended to the east building line Q.2 and 24' wide access drive will extend west to the concrete approach at door H. 63. Drawing Sheet 2.1.1: There is an opening in the north wall of room 155. Is this a door or window? If so, what opening number is it? A. See sheet 2.3 for window width and section 9/4.7 for height. These openings can also be seen on 3.1 - all frames are hollow metal frames, 64. Drawing Sheet 2.1.2: Please identify all of the door and window openings in the south exterior wall for Alternate #2. A. See sheet 2.7/3 South Elevation - doors and windows east of grid line Q are part of alternate #2. 65. Drawing Sheet 1.2 Site Layout and Pavement Plan: Paving Key shows "Grass Area" as un -hatched white space, which would indicate that all areas of the drawing that are not hatched are to be grass. Please indicate the limits of grass seeding to be included in the bid. A. the area of grass seed is 110,000 sq/ft. 9 66. Drawing Sheet 2.1.1, First Floor Plan Alternates #1 and #3: What are the ceiling finishes for the areas in Alternate #3 and eastern parts of Alternate #1? If Alternate #5 is not accepted there is no structure above. Also, are mechanical and fire protection to be suspended all the way from the roof structure as part of alternate #3? A. The ceilings for rooms in the area of alternate #3 will be the 27' high metal decking and joist (mezzanine ceiling). Alternate #1 does include the mezzanine above. 67. Drawing Sheet 2.1 .2 First Floor Plan — Alternate #4: Is the concrete slab on grade in this area included in the base bid or in the alternate? A. No all concrete floors will be part of the alternate they fall. Stone will installed in all alternate areas under the base bid. 68. Drawing Sheet 2.1.1 and 2.2.1: Stairwell 186 is shown as part of alternate #3 and as part of alternate #5. Please clarify which alternate the steel stairs are to be included with. A. Stairwell 186 is part of alternate #3. 69. Section 08100/2.3/B/1 - Should the exterior frames be galvanized? A. No hollow metal 70. Section 08100/2.3/B/6 - Could you provide additional details regarding what you are requesting? A. No special mortise bottoms required. 71. Section 08100/2.3/C/3/a - Should the exterior doors be galvanized? A. No hollow metal 72. Section 08100/2.3/C/3/e - Head Reinforcing Channel (HRC) is typically used at openings greater than 48". A. HRC only at doors larger than 42" 73. Section 08210/2.1/B - Are you wanting the door edges to match the door faces or to be a compatible hardwood? Either way meets the AWI flush door standards. A. Door edge just needs to be of compatible hardwood. 74. Section 08410/1.1/C - Section 08410/2.1/1 - Section 08700/2.1/E - Plan Page 6.3/Hardware Notes - Please clarify what hardware, if any, for the aluminum doors is to be provided by the hardware supplier. The documents indicated above seem to contradict themselves. Should at least the Cylinders be provided by the hardware supplier in order that they can be keyed to the building and owner's existing system? A. All aluminum door hardware is by (08410) contractor accept the cylinders to be supplied by section (08700) 75. Section 06400/1.1/B/5 - Section 06400/2.1/F - Section 08700/1.1/A - Please clarify who is responsible for the cabinet hardware. A. All cabinet hardware is by the cabinet contractor as noted in (06400) 76. Section 08700/2.1 - Please clarify the hardware finish. Specifications indicate Bronze. A. Hardware to be US 10/613 and locksets 643e aged Bronze. 77. Section 08700/2.1/E - The panic hardware specified is not ADA compliant. Should this hardware be modified to be ADA compliant? A. Panic hardware should have a 9947L — ADA lever on the exterior side or equal. 78. Section 08700/2.1/L - Could we use InPro Corporation for the name plates. A. Yes 10 79. Section 08700/2.2/G - Could Ives Hinges be approved as a comparable? A, Yes 80. Section 08700/2.2/H - Could Reese be approved as a comparable? A. Yes 81. Section 08700/2.2/1 - Could Rockwood be approved as a comparable? A. Yes with a minimum thickness of 0.60 82. Can you please clarify what areas of the building are included in the base bid and which portions are in the alternate bids. The floor plan on sheet 2.1 shows the south elevation stopping near column line Q.2 yet the south elevation 3/ 2.7 shows it continuing east to column line U.2. Please verify which is correct for the base bid and which is for alternate 2. A. Sheet 2.1 shows all the base bid walls. The south wall will stop at grid line Q under the base bid and extend to U.2 as part of alternate 2. Exterior elevation will be constructed the same way - under base bid the wall will stop at grid line Q and extend to U.2 if alternate 2 is taken. 83. The typical panel width is 8'-0". Is a wider typical panel layout acceptable for the base bid? If so, what is the widest acceptable panel width? A. No set Panel width - 12'-0" panel ok as long as window openings can be achieved 84. Please clarify extent of acoustical deck. Detail 1/A5.3 indicates the acoustical deck is at the high roof. Sheet 9.3 is identifying "A" and "B" deck. "A" being a section of high roof and a section of low roof. If the "A" and "B" shown sheet A9.3 refers back to the schedule shown as 13/A9.4 then I am not seeing any acoustical deck identified on that schedule. Does "A" identify the acoustical deck. A. You are mentioning two different things. One is the acoustical metal decking and the other is the deck fastening details. On sheet 9.4 (schedule 13/9.4) what you are looking at are the fastening patterns of the decks. The acoustical decking only goes on the high roof of the maintenance garage area 160 from grid lines 1 to 10.2 between grind lines A and D.9. All the other decking areas have normal metal decking. Type "A" deck does not stand for acoustical. 85. Sheet 2.8, North & East,Exterior Elevations. This drawing shows in -filling 4 wall openings with block at the locations of OH doors MM, NN, 00 & PP, but the note also refers to Addendum 6. Should this actually refer to Alternate 6 in lieu of Addendum 6? For this alternate, do we pull the doors out of the base bid and substitute CMU in the openings? A. Yes should read alternate #6 block infill and overhead doors as part of base bid as noted. 86. Sheets 6.1 & 8.1. Do you want the concrete floors in Janitor Room 138 to be sealed? Nothing is called for in the Finish Schedule. A. Room 138 to receive concrete floor sealer only sealer per specifications (03300). 87. Sheets 6.1 & 8.1. The Finish Schedule calls for 8 x 8 Porcelain Tile in Room 177 and Conc Floor in Room 178. Sheet 8.1 shows 12 x 12 VCT in both rooms. Which is correct? A. Room 177 should per schedule 8 x 8 porcelain Tile and room 178 is concrete. 88. Sheet 2.1.4 & Spec Section 01030. Sheet 2.1.4 is Labeled Alternate #14, Masonry Walls in Lieu of Precast Panels. Spec Section 01030 has this option listed as Alternate #13. Which is it 13 or 14? A. sheet 2.1.4 should read Alternate 13 not 14. 11 89. I inquired about the direct to deck application of EPS with the insulation manufacturer since the specifications indicate to install perlite as required by insulation system. His response is below. Are you requiring densdeck since section 07532, 1.2,6,2 requires roof assembly classification to meet FM 1-20 or is UL and IBC approval sufficient and the fire stop can be eliminated? A. Perlite required at all EPS roof areas unless product is approved to be installed directly over the decking per UL and IBC. 90. Would you accept a 45m reinforced TPO mechanically attached roof system in lieu of the 45m nonreinforced EPDM ballast roof system? A. Yes 91. Sheet 2.7, 2.7.1 Exterior Elevations The exterior elevations call out for architectural metal panels on the gable ends of the pre-engineered portion of this project and it references the specifications Section 13122. A. The marquee-lok soffit panels are to be used at the gable ends. 92. Fire stopping (07840) See attached fire stopping specification — 10 sheets ELECTRICAL ADDENDUM #2 General: 1. Lighting representatives have submitted the following light types for prior approval and have been approved: a. Light fixture types M1, N, R and OA submitted by M&M Lighting have been approved for general compliance b. Light fixture types N and R submitted by Strauss Architectural Systems have been approved for general compliance. Sheet E4: 1. Wash Bay 163: remove two type T fluorescent lights. 2. Wash Bay 163: Change type M light fixtures to T5HO per light fixture schedule revision on sheet E12. Wire two of the type M lights on the switched emergency circuit (switched circuit that the type T lights were on). The emergency lights will be the northeast and southeast lights. The emergency lighting control unit will need to be mounted inside a NEMA 4X box in the wash bays. Lights shall be controlled by the Tight switches and the occupancy sensors per sheet E4 note 3 (occupancy sensors will be used under the base and alternate E-1 bids). 3. Entry/Wash Bay 164: remove two type T fluorescent lights. 4. Entry/Wash Bay 164: Change type M light fixtures to T5HO per light fixture schedule revision on sheet E12. Wire two of the type M lights on the switched emergency circuit (switched circuit that the type T lights were on). The emergency lights will be the northeast and southeast lights. The emergency lighting control unit will need to be mounted inside a NEMA 4X box in the wash bays. Lights shall be controlled by the light switches and the occupancy sensors per sheet E4 note 4 (occupancy sensors will be used under the base and alternate E-2 bids). Sheet E12: 1. Light fixture schedule: Change type M light fixture to Lithonia FHE-654L-2/3-MHKB wet location, IP65, IP66 and IP67 rated, high bay with stainless steel V -hook and brackets or equal. T5HO lamps shall be 4100K. Lights can be hung from the bottom of the joists. Mount with stainless steel fasteners as required. 2. Light fixture schedule: Type M1 light to have neutral white color LED's. Part number should be HB2N4M. 12 RESIDENT BIDDER CERTIFICATION CONTRACT NO: PROJECT NAME: DATE OF LETTING: To be a qualified resident bidder, the person, corporation, partnership, or firm shall not have, as employees, Illinois laborers on the work site of a non -federal -aid project within Iowa. An Illinois laborer is any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. This applies to all labor on the project, whether skilled, semi -skilled, or unskilled, whether manual or non -manual. This also applies to work subcontracted by or to the resident bidder on a non -federal -aid project within Iowa. The resident bidder may place on such work no more than three residents of Illinois who are his regularly employed executive and technical experts. This qualification as resident bidder shall be maintained by the contractor and his subcontractors at the work site until this project is completed. I hereby certify that no Illinois resident laborer as defined above will be employed at the work site during the contract period from the start of the project until its completion. COMPANY NAME CORPORATE OFFICER TITLE DATE 13 07840-1 SECTION 07840 FIRESTOPPING SCOPE Applicable provisions of the General and Supplementary Conditions and Division 1 govern work under this Section. INDEX 1.1 Description 2.2 Acceptable Manufacturers 1.2 Quality Assurance 2.3 Materials 1.3 References 3.1 Preparation 1.4 Submittals 3.2 Coordination 1.5 Installer Qualifications 3.3 Installation 1.6 Delivery, Storage & Handling 3.4 Field Quality Control 1.7 Project Conditions 3.5 Identification 2.1 General 3.6 Adjustment and Cleaning PART 1 - GENERAL 1.1 Description A. Work Included: Fire stopping work includes both "Through -Penetration Firestop Systems" and "Fire -resistive Construction Joints. Refer to Division 15 and 16 specifications for additional information. In resolving conflicts between this section and Division 15 and 16, the more stringent standard will apply. Only tested firestop systems shall be used in specific locations as follows: 1. Penetrations for the passage of duct, cable, cable tray, conduit, piping, electrical busways and raceways through fire -rated vertical barriers (walls and partitions), horizontal barriers (floor/ceiling assemblies), and vertical service shaft walls and partitions. 2. Openings between structurally separate sections of wall or floors. 3. Gaps between the top of walls and ceilings or roof assemblies. 4. Openings and penetrations in fire -rated partitions or walls containing fire doors. 5. Openings around structural members which penetrate floors or walls. B. Definitions 1. Firestopping: Material or combination of materials used to retain integrity of fire - rated construction by maintaining an effective barrier against the spread of flame, smoke, and hot gases through penetrations in, or construction joints between, fire rated wall and floor assemblies. C. Related Work Specified Elsewhere 1. Cast in Place Concrete Section 03300 2. Precast Concrete Section 03410 3. Masonry Section 04200 4. Structural Metal Framing Section 05100 5. Steel Joists and Girders Section 05210 6. Metal Decking Section 05300 7. Sealants and Caulking Section 07920 8. Gypsum Wallboard Section 09250 9. Mechanical and Electrical Divisions 15, 16 07840-2 1.2 Quality Assurance A. A manufacturer's direct representative (not distributor or agent) to be on-site during initial installation of firestop systems to train appropriate contractor personnel in proper selection and installation procedures. This will be done per manufacturer's written recommendations published in their literature and drawing details. B. Firestop System installation must meet requirements of ASTM E 814, UL 1479 or UL 2079 tested assemblies that provide a fire rating equal to that of construction being penetrated. C. Proposed firestop materials and methods shall conform to applicable governing codes having local jurisdiction. D. Firestop Systems do not reestablish the structural integrity of load bearing partitions/assemblies, or support live loads and traffic. Installer shall consult the structural engineer prior to penetrating any load bearing assembly. E. For those firestop applications that exist for which no qualified tested system is available through a manufacturer, an engineering judgment derived from similar qualified tested system designs or other tests will be submitted to local authorities having jurisdiction for their review and approval prior to installation. Engineering judgment documents must follow requirements set forth by the International Firestop Council. 1.3 References A. Test Requirements: ASTM E 814, "Standard Method of Fire Tests of Through Penetration Fire Stops" B. Test Requirements: UL 1479, "Fire Tests of Through -Penetration Firestops" C. Test Requirements: UL 2079, "Tests for Fire Resistance of Building Joint Systems" D. Underwriters Laboratories (UL) of Northbrook, IL publishes tested systems in their "FIRE RESISTANCE DIRECTORY" that is updated annually. 1. UL Fire Resistance Directory: a. Firestop Devices (XHJI) b. Fire Resistance Ratings (BXRH) c. Through -Penetration Firestop Systems (XHEZ) d. Fill, Voids, or Cavity Material (XHHW) e. Forming Materials (XHKU) f. Joint Systems (XHBN) g. Perimeter Fire Containment Systems (XHDG) E. Test Requirements: ASTM E 1966, "Standard Test Method for Fire Resistive Joint Systems" 07840-3 F. Test Requirements: ASTM E 2307, "Standard Test Method for Determining Fire Resistance of Perimeter Fire Barrier Systems Using Intermediate -Scale, Multi -story Test Apparatus" G. Inspection Requirements: ASTM E 2174, "Standard Practice for On-site Inspection of Installed Fire Stops" H. ASTM E 84, "Standard Test Method for Surface Burning Characteristics of Building Materials" International Firestop Council Guidelines for Evaluating Firestop Systems Engineering Judgments J. IBC 2006. K. NFPA 101 - Life Safety Code L. NFPA 70 - National Electric Code Fire Stopping Systems UL Classification System Construction Type Of System Penetrated Construction Identification 1 No Penetrating Items: F, W, C A, B, J, K, L 0001-0999 2 Metallic Pipes, Conduit or Tubing: F, W, C A, B, J, K, L 1001-1999 3 Nonmetallic Pipe, Conduit or Tubing: F, W, C A, B, J, K, L 2001-2999 4 Electric Cables: F, W, C A, B, J, K, L 3001-3999 5 Cable, Trays with Electric Cables: F, W, C A, B, J, K, L 4001-4999 6 Insulated Pipes: F, W, C A, B, J, K, L 5001-5999 7 Electrical Bussduct Penetrations: F, W, C A, B, J, K, L 6001-6999 8 Mechanical Ductwork Penetrations: F, W, C A, B, J, K, L 7001-7999 9 Multiple Penetrations Through Common Openings: F, W, C A, B, J, K, L 8000-8999 Construction Penetration Floor F penetration W Wall penetration Either floor or wall C penetration Type of Construction A- Concrete floors equal to of less than 5 -inches thick Concrete floors greater than 5 -inches B- thick J- Concrete or masonry walls equal to or less than 8 -inches thick K- Concrete of masonry walls greater than 8 -inches thick L- Framed walls 07840-4 THROUGH -PENETRATION UL CLASSIFICATION SYSTEM Fire -Resistant Joint Systems JOINT UL CLASSIFICATION SYSTEM UL Classificatio n System Joint System Movement Joint Width Capability 1 Floor -to -Floor FF D 0000-0999 2 Wall -to -Wall WW D 0000-0999 3 Floor -to -Wall: FW D 0000-0999 4 Head of Wall: HW D 0000-0999 Movement Capability Has movement D- capability Joint Width 0000-0999 Less than or equal to 2 -inches 1.4 Submittals A. Submit Product Data: Manufacturer's specifications and technical data for each material including the composition and limitations, documentation of qualified tested firestop systems to be used and manufacturer's installation instructions to comply with Section 1300. B. Submit Manufacturer's engineering judgment identification number and drawing details when no qualified tested system is available for an application. Engineering judgment must include both project name and contractor's name who will install firestop system as described in document. C. Submit material safety data sheets provided with product delivered to job -site. 1.5 Installer Qualifications A. Engage an experienced Installer who is certified, licensed, or otherwise qualified by the firestopping manufacturer as having been provided the necessary training to install manufacturer's products per specified requirements. A supplier's willingness to sell its firestopping products to the Contractor or to an Installer engaged by the Contractor does not in itself confer qualification on the buyer. 07840-5 B. The work is to be installed by a contractor with at least one of the following qualifications: FM 4991 Approved Contractor UL Approved Contractor Hilti Accredited Fire Stop Specialty Contractor C. Installer shall have not less than 3 years experience with fire stop installation. 1.6 Delivery, Storage, and Handling A. Deliver materials undamaged in manufacturer's clearly labeled, unopened containers, identified with brand, type, and UL label where applicable. B. Coordinate delivery of materials with scheduled installation date to allow minimum storage time at job -site. C. Store materials under cover and protect from weather and damage in compliance with manufacturer's requirements, including temperature restrictions. D. Comply with recommended procedures, precautions or remedies described in material safety data sheets as applicable. E. Do not use damaged or expired materials. 1_7 Project Conditions A. Do not use materials that contain flammable solvents. B. Schedule installation of firestopping after completion of penetrating item installation but prior to covering or concealing of openings. C. Verify existing conditions and substrates before starting work. Correct unsatisfactory conditions before proceeding. D. Weather conditions: Do not proceed with installation of firestop materials when temperatures exceed the manufacturer's recommended limitations for installation printed on product label and product data sheet. E. During installation, provide masking and drop cloths to prevent firestopping materials from contaminating any adjacent surfaces. 07840-6 PART 2- PRODUCTS 2_1 General A. Provide firestopping composed of components that are compatible with each other, the substrates forming openings, and the items, if any, penetrating the firestopping under conditions of service and application, as demonstrated by the firestopping manufacturer based on testing and field experience. B. Provide components for each firestopping system that are needed to install fill material. Use only components specified by the firestopping manufacturer and approved by the qualified testing agency for the designated fire -resistance -rated systems. C. Firestopping Materials are either "cast -in-place" (integral with concrete placement) or "post installed." Provide cast -in-place firestop devices prior to concrete placement. 2.2 Acceptable Manufacturers A. Subject to compliance with through penetration firestop systems (XHEZ), joint systems (XHBN), and perimeter firestop systems (XHDG) listed in Volume 2 of the UL Fire Resistance Directory; provide products of the following manufacturers as identified below: 1. Hilti, Inc., Tulsa, Oklahoma 800-879-8000 / www.us.hilti.com 2. Equivalent Products from: Specified Technologies, Inc. (STI), Somerville, New Jersey 800-922-1180 / www.stifirestop.com 3. Substitution requests shall be considered in accordance with contract provisions. 2.3 Materials A. Use only firestop products that have been UL 1479, ASTM E 814 or UL 2079 tested for specific fire -rated construction conditions conforming to construction assembly type, penetrating item type, annular space requirements, and fire -rating involved for each separate instance. B. Pre-installed firestop devices for use with noncombustible and combustible pipes (closed and open systems), conduit, and/or cable bundles penetrating concrete floors and/or gypsum walls, the following products are acceptable: 1. Hilti CP 680-P Cast -In Place Firestop Device a. Add Aerator adaptor when used in conjunction with aerator ("sovent") system. 2. Hilti CP 681 Tub Box Kit for use with tub installations. 07840-7 3. Hilti CP 680-M Cast -In Place Firestop Device for use with noncombustible penetrants. 4. Hilti CP 653 Speed Sleeve for use with cable penetrations. C. Sealants, caulking materials, or foams for use with non-combustible items including steel pipe, copper pipe, rigid steel conduit and electrical metallic tubing (EMT), the following products are acceptable: 1. Hilti FS -ONE Intumescent Firestop Sealant 2. Hilti CP 604 Self -leveling Firestop Sealant 3. Hilti CP 620 Fire Foam 4. , Hilti CP 606 Flexible Firestop Sealant 5. Hilti CP 601s Elastomeric Firestop Sealant D. Sealants or caulking materials for use with sheet metal ducts, the following products are acceptable: 1. Hilti CP 601s Elastomeric Firestop Sealant 2. Hilti CP 606 Flexible Firestop Sealant 3. Hilti FS -ONE Intumescent Firestop Sealant E. Sealants, caulking or spray materials for use with fire -rated construction joints and other gaps, the following products are acceptable: 1. Hilti CP 672 Speed Spray 2. Hilti CP 601s Elastomeric Firestop Sealant 3. Hilti CP 606 Flexible Firestop Sealant 4. Hilti CP 604 Self -leveling Firestop Sealant F. Pre -formed mineral wool designed to fit flutes of metal profile deck and gap between top of wall and metal profile deck; as a backer for spray material. 1. Hilti CP 777 Speed Plugs 2. Hilti CP 767 Speed Strips G. Intumescent sealants, caulking materials for use with combustible items (penetrants consumed by high heat and flame) including insulated metal pipe, PVC jacketed, flexible cable or cable bundles and plastic pipe, the following products are acceptable: 1. Hilti FS -ONE Intumescent Firestop Sealant H. Foams, intumescent sealants, or caulking materials for use with flexible cable or cable bundles, the following products are acceptable: 1. Hilti FS -ONE Intumescent Firestop Sealant 2. Hilti CP 620 Fire Foam 3. Hilti CP 601s Elastomeric Firestop Sealant 4. Hilti CP 606 Flexible Firestop Sealant 07840-8 Non -curing, re -penetrable intumescent putty or foam materials for use with flexible cable or cable bundles, the following products are acceptable: 1. Hilti CP 618 Firestop Putty Stick 2. Hilti CP 658T Firestop Plug J. Wall opening protective materials for use with U.L. listed metallic and specified nonmetallic outlet boxes, the following products are acceptable: 1. Hilti CP 617 Firestop Putty Pad 2. Hilti Firestop Box Insert K. Firestop collar or wrap devices attached to assembly around combustible plastic pipe (closed and open piping systems), the following products are acceptable: 1. Hilti CP 643N Firestop Collar 2. Hilti CP 644 Firestop Collar 3. Hilti CP 648E/CP648S Wrap Strips L. Materials used for large openings and complex penetrations made to accommodate cable trays and bundles, multiple steel and copper pipes, electrical busways in raceways, the following products are acceptable: 1. Hilti CP 637 Firestop Mortar 3. Hilti FS 657 FIRE BLOCK 4. Hilti CP 620 Fire Foam 5. Hilti CP 675T Firestop Board M. Non curing, re -penetrable materials used for large size/complex penetrations made to accommodate cable trays and bundles, multiple steel and copper pipes, electrical busways in raceways, the following products are acceptable: 1. Hilti FS 657 FIRE BLOCK 2. Hilti CP 675T Firestop Board N. Sealants or caulking materials used for openings between structurally separate sections of wall and floors, the following products are acceptable: 1. Hilti CP 672 Speed Spray 2. Hilti CP 601s Elastomeric Firestop Sealant 3. Hilti CP 606 Flexible Firestop Sealant 4. Hilti CP 604 Self -Leveling Firestop Sealant O. Provide a firestop system with a "F" Rating as determined by UL 1479 or ASTM E814 which is equal to the time rating of construction being penetrated. P. Provide a firestop system with an Assembly Rating as determined by UL 2079 which is equal to the time rating of construction joint assembly. 07840-9 PART 3 - EXECUTION 3.1 Preparation A. Verification of Conditions: Examine areas and conditions under which work is to be performed and identify conditions detrimental to proper or timely completion. 1. Verify penetrations are properly sized and in suitable condition for application of materials. 2. Surfaces to which firestop materials will be applied shall be free of dirt, grease, oil, rust, laitance, release agents, water repellents, and any other substances that may affect proper adhesion. 3. Provide masking and temporary covering to prevent soiling of adjacent surfaces by firestopping materials. 4. Comply with manufacturer's recommendations for temperature and humidity conditions before, during and after installation of firestopping. 5. Do not proceed until unsatisfactory conditions have been corrected. 3.2 Coordination A. Coordinate location and proper selection of cast -in-place Firestop Devices with trade responsible for the work. Ensure device is installed before placement of concrete. B. Responsible trades to provide adequate spacing of field run pipes to allow for installation of cast -in-place firestop devices without interferences. 3.3 Installation A. Regulatory Requirements: Install firestop materials in accordance with UL Fire Resistance Directory or Omega Point Laboratories Directory. B. Manufacturer's Instructions: Comply with manufacturer's instructions for installation of through -penetration and construction joint materials. 1. Seal all holes or voids made by penetrations to ensure an air and water resistant seal. 2. Consult with mechanical engineer, project manager, and damper manufacturer prior to installation of UL firestop systems that might hamper the performance of fire dampers as it pertains to duct work. 3. Protect materials from damage on surfaces subjected to traffic. 07840-10 3_4 Field Quality Control A. Examine sealed penetration areas to ensure proper installation before concealing or enclosing areas. B. Keep areas of work accessible until inspection by applicable code authorities. C. Inspection of through -penetration firestopping shall be performed in accordance with ASTM E 2174, "Standard Practice for On -Site Inspection of Installed Fire Stops" or other recognized standard. D. Perform under this section patching and repairing of firestopping caused by cutting or penetrating of existing firestop systems already installed by other trades. 3.5 Identification A. Identify through -penetration firestop systems with pressure -sensitive, self- adhesive, preprinted vinyl labels. Attach labels permanently to surfaces of penetrated construction on both sides of each firestop system installation where labels will be visible to anyone seeking to remove penetrating items or firestop systems. Include the following information on labels: 1. The words: "Warning -Through Penetration Firestop System -Do Not Disturb. Notify Building Management of Any Damage." 2. Contractor's Name, address, and phone number. 3. Through -Penetration firestop system designation of applicable testing and inspecting agency. 4. Date of Installation. 5. Through -Penetration firestop system manufacturer's name. 6. Installer's Name. 3.6 Adjusting and Cleaning A. Remove equipment, materials and debris, leaving area in undamaged, clean condition. B. Clean all surfaces adjacent to sealed holes and joints to be free of excess firestop materials and soiling as work progresses. I 1 Addendum #2 - First Floor - Exterior Well Dimensions (Office Are ve-no O 2G91Kv enygrchl nacce,L.LA.- WI gMe Feeerved WeEeNaa Public WON®FeciliLy-B25 Glernvcddq.s. W �Yoo, lAw/lrti 11/02/11 Ad2.1 electrical storage 169 CONT 3X3%1/4' L W/ 3'X2' HOOK -- 2'-0' O.O. CONCRETE PER SCHEDULE PITC TO DRAI TRENCH GRATE BY G.C. 3' DEEP I/4' THI CONT • 5 AT EDGE TYP ALL EDGES 04'5 m IS' VERT •4'e a 10' HORZ RETURN BARS INTO FLOOR SLAB MIN. 12' HORZ -- TOTAL LAP 24' CONT. WATER STOP TYP. AT ALL COLD JOINTS AND KEY WAY •4'a a 13' VERT •4'a m 10' WORE SAME REINF ON END WALLS CONT. WATER STOP TYP. AT ALL COLD JOINTS AND KEY WAY (3) 5' CONT. 5'a m 12' TRANSVERSE Addendum #E - FI - Wa 1 Dimensions - Catch Basin Detail 1/2-1•-0' O 11KuanyArchltecte. L.L.C.-AIIRIghtsReeervwd Waterloo Public Works Facility -825 Glenwood Ave. Waterloo. L450703 11/c2'11 Ad2.2 Page 1 of 3 MARIA ARMSTRONG From: Kevin McGuire [kmcguire@KraemerBrothers.com] Sent: Tuesday, November 08, 2011 2:36 PM To: Linda Young; glenn.shoemaker@abtdrains.com; support@bidclerk.com; christiedoor5@cfu.net; toddgeisler@geislerbrothers.com; mary@jimgieseroofing.com; dan@jimgieseroofing.com; rfisher@greenstreak.com; ssokolik@hillebrandconstruction.com; cfain@ipcprecast.com; clee@leesystems7.com; SRichard@mpcent.com; JThiele@MarquartConcreteProducts.com; mschumacher@megacc.com; rnemec@openspec.us; bmiles@pci-dbq.com; corymhatfield7l@yahoo.com; Frieden.Brenda@seedorff.com; kmitchell@tsf-structures.com; MARIA ARMSTRONG; susang@westcentralmfg.com Cc: Jon Wallenkamp Subject: RE: City of Waterloo Public Works Facility -Addendum questions #5 Jon, Please address the questions below by addendum as soon as possible. Given the extent of the clarifications needed, perhaps a bid date extension would be in order. Addendum Questions #5: 1. Other than the standard language in General Conditions paragraph 10.3, we have not found anything in the bid documents pertaining to the removal of hazardous materials. Has assessment and remediation already been completed by the Owner? 2. Section 02200 Earthwork, 1.4, A Environmental Requirements: Has a Storm Water Pollution Prevention Plan been designed for this project? Has an NPDES permit been issued? Are the bidders expected to include the costs for design and permitting of the SWPP Plan in their bids? Please clarify. 3. Drawing Sheet 2.1, First Floor Plan: There are existing openings that are not shown on the plans of walls that are remaining, specifically the existing South Precast wall has 5 overhead door openings and 1 swing door opening, however the plans only show (3) overhead doors. Are (2) overhead door and (1) swing door openings to be in filled? (if yes, what material is to be used — CMU or precast?)? Likewise, the north existing precast wall has openings that are not shown on the plans. 4. Drawing Sheet 2.1.4, Alternate 13: Is Alternate #13 viable? Will it meet energy code requirements? The precast wall panels are required to be minimum R-19; will the R value of single wythe block be adequate, especially at the reinforcing where there will be zero insulation? 5. Addendum #2, Page 3, question #4: Answer directs to "see attached drawing." No such drawing is included in the addendum. 6. Addendum #2, Page 3, Question #5: Response does not answer the question. 7. Addendum #2, Page 4, Question #8: There are multiple references to grid 4.3. Do you mean to say Grid 9.3? 8. Addendum #2, Page 4, Question #14: Response states that Alternate #2 should be compared to Alternates 1 and 3, how is this possible? 9. Addendum #2, Page 5, Question #23: Response references attached sheet. No such sheet is included with the addendum. 10. Addendum #2, Page 6, Question #30: Need clarification on which areas will have a fully adhered system. Sheet 2.9 calls for ballasted everywhere. Need a specification for a fully adhered system. 11. Addendum #2, Page 6, Question #31: Response does not answer the question that was asked regarding the roofing details. Please refer to sheet 2.9. 12. Addendum #2, Page 7, Question #46: No response given. 13. Addendum #2, Page 8, Question #56: Will a revised bid form be issued to address this change to the scope of Alternate #12? 14. Drawing sheets P1, P2, P4: Drawings do not identify fixture tag numbers for 11/9/2011 Page 2 of 3 alternate #12. Also, some locations identify WR1 and AR1 as part of Alternate #4; this seems inconsistent with the scope of Alternate #4. Please clarify. 15. Addendum #2, Page 9, Question #58: Will a revised bid form be issued to address this change to the scope of Alternate #1? 16. Addendum #2, Page 9, Question #69: What type of surface is in the base bid for the remainder of the undeveloped Alternate #2 area that is not covered by the 24' wide access drive? 17. Addendum #2, Page 12, Question #90: This is a major departure from the specifications. Please furnish a specification for a mechanically attached TPO roofing system. Previously Asked Questions Not Addressed by Addendum #2 18. 1. Drawing Sheet 2.1.3 First Floor Plan: Grid P between 1 and 2.4 calls for detail 3/4.8. Detail appears to be incorrect for this location. 19. 2. Drawing Sheet 9.1 Foundation Plan: Grid line U between 2.4 and 5.4 shows footing type ST-1. This is an existing wall line. Please clarify. 20. 3. Drawing Sheet 9.1 Foundation Plan: At the pre-bid conference it was mentioned that the spray booth would be removed by the owner. The drawing still indicates that it is by contractor. Please clarify. 21. 4. Drawing Sheet 9.1 Foundation Plan: Grid line A.1 x 5.4 note calls for top of footing at -5'-4" UNO. Sheet note calls for bottom of footing at-6'-0". All strip footings are 12" thick. Which footing depth is correct? 22. Drawing Sheet 9.1 Foundation Plan: Sheet notes: Note regarding footing depths lists top of footing elevations for masonry and precast at -0'4" and-0'-8". Is this supposed to reference top of foundation? 23. Section 01020 Allowances, Paragraph D: Instructs the bidder to include handling; protection; labor, installation and finishing; and O&P in the base bid, in addition to the allowance amount. It is impossible to calculate the value of the items listed without knowing the scope of work of the "unforeseen condition". Please change this language to make these items included in the allowance amount, not the base bid. 24. Section 01030 Alternates, Alternate #1: The building will not be useable if this alternate is not accepted. Please consider eliminating this alternate as it is unnecessary coordination for the bidders and will only serve to confuse the bidding process. 25. Drawing Sheet El Electrical Site Plan: Sheet note #5 regarding transformer pad states "See Architectural Drawings". There are no details for the transformer pad or bollards on the architectural or site drawings. Please provide details. 26. MBE/WBE Business Enterprise Pre-Bid Contact Information Form Instructions: a. Line item #1 states that the Form CCO-4 must include "all subcontractor contacts, bids received, and awarded — not just those related to disadvantaged business enterprise vendors." We will contact several hundred potential bidders for this project and hope to receive at least 100 subcontract bids. It will be impossible to document each of those contacts and bids on bid day in time to submit with the bid. Please waive the requirement that non MBE/WBE vendors be listed. b. Line item #4 requires copies of MBE/WBE subcontract bids to be included with the GC bid. Please waive this requirement, as it will be difficult, if not impossible given the time constraint to forward this information to our bid runner in time to be included with the bid. We would be happy to share this information after the bid letting. c. Line item #5 requires documentation of the reason why MBE/WBE subcontractors were not awarded to be included with the GC Bid. Again, this will be virtually impossible to compile, much less forward to the bid runner given the time constraint. Please waive this requirement. Again, we would be happy to share this information after the bid letting. 27. Section 00810 Supplementary General Conditions, 11.1.2.1; paragraph 4: Includes a requirement for an Owner's and Architect's Protective Liability Insurance policy. We have been told by our insurance carrier that this is a duplication of the coverage already afforded by the "additional insured" listing on the Commercial General Liability policy. There is a significant cost for the Owner's and Architect's Protective Liability Policy which will need to be included in the bid. Please confirm that this additional coverage will be required. 28. Addendum 1, Section 13122 Metal Building System, 2: Entry canopy framing notes "see attached 11/9/2011 Page 3 of 3 drawing", however, no drawing is attached. Drawing Sheet 9.2 does not identify size or type of framing members at canopy. Kevin McGuire, LEEDAP Project Manager Kraemer Brothers, LLC T: 608.546.2411 I F: 608.546.2509 kmcguire(&kraemerbrothers.com www.kraemerbrothers.com From: Linda Young [mailto:linda@kuenyarch.com] Sent: Tuesday, November 08, 2011 11:55 AM To: glenn.shoemaker@abtdrains.com; support@bidclerk.com; christiedoor5@cfu.net; toddgeisler@geislerbrothers.com; mary@jimgieseroofing.com; dan@jimgieseroofing.com; rfisher@greenstreak.com; ssokolik@hillebrandconstruction.com; cfain@ipcprecast.com; Kevin McGuire; clee@leesystems7.com; SRichard@mpcent.com; JThiele@MarquartConcreteProducts.com; mschumacher@megacc.com; rnemec@openspec.us; bmiles@pci-dbq.com; corymhatfield7l@yahoo.com; Frieden.Brenda@seedorff.com; kmitchell@tsf-structures.com; maria.armstrong@waterloo- ia.org; susang@westcentralmfg.com Cc: Linda Young; Jon Wallenkamp Subject: City of Waterloo Public Works Facility See attached Addendum #2. If there are any questions please contact our office. Thank you, Linda 11/9/2011 CITY OF WATERLOO CONTRACTORS LIST GENERAL CONTRACTORS Company Address1 Address2 City State Zip Contact Email Phone Fax CITY Or WATERLOO LIST Cardinal Construction, Inc P. O. Box 897 Waterloo IA 50704 D Gillett dgillett(a cardinalconst.com (319) 232-5400 (319) 232-3149 Henkel Construction 208 East State Street Mason City IA 50401 Steve Watson Steve anhenkelconstruction.com (641) 423-5674 (641) 423-9244 Hillebrand Construction ssokolik(ahillebrandconstruction.com Larson Construction P. O. Box 112 Independence IA 50644 D Larson dlarsonalarsonconst.com (319) 334-7061 (319) 334-4474 Portzen Construction 205 Stone Valley Drive Dubuque Urbandale IA IA 52003 50322 Matt Anderson Josh Freeman manderson anpci-dbq.com (563) 557-7642 (515) 278-9446 (715) 842-2222 (563) 588-9516 (563) 557-9048 (515) 278-9767 (715) 848-8088 (563) 588-9597 Rochen Construction 3401 106th Circle jfreemanarochoncorpofiowa.com Samuels Group, Inc. 311 Financial Way Suite 300 Wausau Dubuque WI IA 54401 52001 Harvey Riley Ron Richards hrilevasamuelsgroup.net Tricon Construction 2245 Kerper Blvd Triconatriconcq.com MARIA ARMSTRONG Page 1 of 1 From: Linda Young [linda@kuenyarch.com] Sent: Thursday, November 10, 2011 3:39 PM To: Andysph@mchsi.com; Brad@asproinc.com; dleonhart@cardinalconst.com; Caanderson@mchsi.com; MARK RICE; CRAIG CLARK; Roys@community-electric.com; Shaun@daveschmittconstruction.com; grossesteel@cfu.net; Hurstsonscontractors@mchsi.com; bdevries@k-welectric.com; dlarson@larsonconst.com; Scottm@martinsonconstruction.com; mpdco@gwestoffice.net; kenmodern@aol.com; creiter@paulsonelectric.com; smcbride@paulsonelectric.com; Nhellman@petersconstruction.com; bids@petersoncontractors.com; brettb@ptinc.us; Scottpratt@gcits.com; Tonysphc@cfu.net; Tricon@triconcg.com; youngspainting_1996@yahoo.com; Jim@youngphc.com; glenn.shoemaker@abtdrains.com; support@bidclerk.com; christiedoor5@cfu.net; customcreations@fctc.coop; toddgeisler@geislerbrothers.com; maty@jimgieseroofing.com; dan@jimgieseroofing.com; rfisher@greenstreak.com; ssokolik@hillebrandconstruction.com; cfain@ipcprecast.com; eerschen@jrsupplyinc.com; kmcguire@KraemerBrothers.com; clee@leesystems7.com; SRichard@mpcent.com; JThiele@MarquartConcreteProducts.com; mschumacher@megacc.com; rnemec@openspec.us; bmiles@pci-dbq.com; corymhatfield71@yahoo.com; Frieden.Brenda@seedorff.com; kmitchell@tsf-structures.com; glennr@victorstanley.com; MARIA ARMSTRONG; TRACIA ROSS; susang@westcentralmfg.com Cc: Linda Young Subject: City of Wateloo Public Works Facility The General Contractors list that was just sent are Generals that only have contacted Kueny Architects. There might be other Generals bidding that have not registered with our office. Thank you, Kueny Architects, LLC 11/14/2011 ADDENDUM #3 (Addendum #1 is in the spec — Volume I — Section 00910) CITY OF WATERLOO IOWA PUBLIC WORKS FACILITY BIDS DUE: MONDAY, NOVEMBER 14, 2011 AT 4:00 PM at the City Clerks Office located at 715 Mulberry Street, Waterloo, Iowa. All proposals received will be opened in the Council Chambers in the City Hall in the City of Waterloo, Iowa at 5:30 p.m. To all Contract Bidders of record. This Addendum is issued to modify, explain or correct the original Drawings and Specifications as noted below, and is hereby made a part of the Contract documents. Please attach this Addendum to the Specifications in your possession. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. This Addendum consists of 13 written pages and 2 drawing sheets If you are bidding as a General Contractor please notify our office by email jonw@kuenyarch.com and linda@kuenyarch.com The list of City forms that MUST accompany your bid are: 1. Form of Bid Bond 2. Non -Collusion Affidavits of Prime Contractor 3. Reciprocal Resident Bidder Preference and Resident Bidder Certification — See Addendum #2 for City form. 4. Potential Item of work for MBENVBE participation a. MBE and or WBE Prebid contact information form 5. Form of Bid or proposal All the following Acceptable Manufacturer's products below must meet or exceed written specifications. Section 07532 EPDM Mule Hide Products QUESTIONS 1. Drawing Sheet 2.1, First Floor Plan: There are existing openings that are not shown on the plans of walls that are remaining, specifically the existing South Precast wall has 5 overhead door openings and 1 swing door opening, however the plans only show (3) overhead doors. Are (2) overhead door and (1) swing door openings to be in filled? (if yes, what material is to be used — CMU or precast?)? Likewise, the north existing precast wall has openings that are not shown on the plans. A. All eight existing doors will be removed by the overhead door contractor. This also hold true for the existing overhead doors that exist in openings labeled MM, NN, 00 and PP. If alternate #6 is taken then the door openings are infilled with masonry as noted on sheet 2.1.2 and 2.8. 1 2. Is overhead door I being installed within and existing wall opening or does a new opening need to be constructed. A. Yes a new opening into the existing precast will be required; new steel tube frame will be installed. The frame will have 6'x8'x3/8" tube steel jambs and 12'x8'x3/8 tube steel head with a 3/8'x8" plate all around to mount frame to existing precast inside face. %" concrete expansion anchors will be installed 2'-0" o.c. 3. Drawing Sheet 2.1.4, Alternate 13: Is Alternate #13 viable? Will it meet energy code requirements? The precast wall panels are required to be minimum R-19; will the R value of single wythe block be adequate, especially at the reinforcing where there will be zero insulation? A. See insulation required for alternate 13 below line #42 4. Addendum #2, Page 3, question #4: Answer directs to "see attached drawing." No such drawing is included in the addendum. A See attached draw within this addendum. 5. Sheet 2.1.1. Your Alternate descriptions are a bit cloudy. Are all of the interior strip footings and fdns part of alternate #3 or part of the base bid? I assume that the interior column footings are part of the base bid because they support the roof structure. Please clarify. I also have the same question regarding Alternate #1. A. All exterior walls & footings are pan' of Base Bid, except the areas indicated for alternate 2. Concrete slabs are part of each alternate. All building columns and footings are part of base bid except for marks S/5.6, T3/5.6, S/9.3 AND T.3/9.3 which are part of altemate #2. 6. .Addendum #2, Page 4, Question #8: There are multiple references to grid 4.3. Do you mean to say Grid 9.3? A, Correct should say 9.3. 7. Addendum #2, Page 4, Question #14: Response states that Alternate #2 should be compared to Alternates 1 and 3, how is this possible? A. Should read compared to Alternates 1 and 5. 8. Addendum #2, Page 5, Question #23: Response references attached sheet. No such sheet is included with the addendum. A. Sheet is attached with window widths and also see blind sizing chart provided at the end of this addendum. 9. Addendum #2, Page 6, Question #30: Need clarification on which areas will have a fully adhered system. Sheet 2.9 calls for ballasted everywhere. Need a specification for a fully adhered system. A. If a EPDM system is used the two existing roofs will be fully adhered. The contractor is approved to install a fully adhered system over the new and existing if they prefer. Main point is that the existing roofs cannot have a ballasted system. 10. Addendum #2, Page 8, Question #56: WiII a revised bid form be issued to address this change to the scope of Alternate #12? A. New bid form not required the addendum is part of the bid and the bid for alternate #12 still will go on the line provided on the bid form. 11. Drawing sheets P1, P2, P4: Drawings do not identify fixture tag numbers for alternate #12. Also, some locations identify WR1 and AR1 as part of Alternate #4; this seems inconsistent with the scope of Alternate #4. Please clarify. A. See note below in plumbing addendum section. 2 12. Addendum #2, Page 9, Question #58: Will a revised bid form be issued to address this change to the scope of Alternate #1? A. New bid form not required the addendum is part of the bid and the bid for alternate #1 still will go on the line provided on the bid form. 13. Addendum #2, Page 9, Question #69: What type of surface is in the base bid for the remainder of the undeveloped Alternate #2 area that is not covered by the 24' wide access drive? A. Area will be left as graded sub surface. 14. Addendum #2, Page 12, Question #90: This is a major departure from the specifications. Please furnish a specification for a mechanically attached TPO roofing system. A. No spec will be provided the provided system must meet or exceed our EPDM specification. 15. Drawing Sheet 2.1.3 First Floor Plan: Grid P between 1 and 2.4 calls for detail 3/4.8. Detail appears to be incorrect for this location. A. detail tag should read 1/4.8. 16. Drawing Sheet 9.1 Foundation Plan: Grid line U between 2.4 and 5.4 shows footing type ST -1. This is an existing wall line. A. Correct no footing required. 17. Drawing Sheet 9.1 Foundation Plan: Note at east wall of existing building calls for the existing precast wall to be demoed as part of Alternate #7. Alternate #7 in the specifications calls for adding of overhead cranes. How is the wall demo related to the cranes? A. Correct no alternate bid for precast panels along grid line U between 2.4 and 5.4. 18. Drawing Sheet 9.1 Foundation Plan: At the pre-bid conference it was mentioned that the spray booth would be removed by the owner. The drawing still indicates that it is by contractor. A. Correct per demo plan 2.6 removal of the booth will be by the owner. 19. Drawing Sheet 9.1 Foundation Plan: Grid line A.1 x 5.4 note calls for top of footing at -5-4" UNO. Sheet note calls for bottom of footing at -6'-0". All strip footings are 12" thick. Which footing depth is correct? A. -6'-0" is correct 20. Drawing Sheet 9.1 Foundation Plan: Sheet notes: Note regarding footing depths lists top of footing elevations for masonry and precast at -0'4" and -0'-8". Is this supposed to reference top of foundation? A. Those are the top of foundation wall heights as noted on the wall sections. 21. Section 01020 Allowances, Paragraph D: Instructs the bidder to include handling; protection; labor, installation and finishing; and O&P in the base bid, in addition to the allowance amount. It is impossible to calculate the value of the items listed without knowing the scope of work of the "unforeseen condition". Please change this language to make these items included in the allowance amount, not the base bid. A, Correct all handling; protection; labor, installation and finishing will be part of the allowance. O&P needs to be in the base bid and based on the allow amount. 22. MBENVBE Business Enterprise Pre -Bid Contact Information Form Instructions: a. Line item #1 states that the Form CCO-4 must include "all subcontractor contacts, bids received, and awarded — not just those related to disadvantaged business enterprise vendors." We will contact several hundred 3 potential bidders for this project and hope to receive at least 100 subcontract bids. It will be impossible to document each of those contacts and bids on bid day in time to submit with the bid. Please waive the requirement that non MBE/WBE vendors be listed. b. Line item #4 requires copies of MBE/WBE subcontract bids to be included with the GC bid. Please waive this requirement, as it will be difficult, if not impossible given the time constraint to forward this information to our bid runner in time to be included with the bid. We would be happy to share this information after the bid letting. c. Line item #5 requires documentation of the reason why MBENVBE subcontractors were not awarded to be included with the GC Bid. Again, this will be virtually impossible to compile, much less forward to the bid runner given the time constraint. Please waive this requirement. Again, we would be happy to share this information after the bid letting. A. Bidders are to make the best effort to meet the above requirements as noted at the pre-bid. 33. Section 00810 Supplementary General Conditions, 11.1.2.1; paragraph 4: Includes a requirement for an Owner's and Architect's Protective Liability Insurance policy. We have been told by our insurance carrier that this is a duplication of the coverage already afforded by the "additional insured" listing on the Commercial General Liability policy. There is a significant cost for the Owner's and Architect's Protective Liability Policy which will need to be included in the bid. Please confirm that this additional coverage will be required. A. This coverage is covered under Commercial General Liability Policy a second is not required. 34. Addendum 1, Section 13122 Metal Building System, 2: Entry canopy framing notes see attached drawing", however, no drawing is attached. Drawing Sheet 9.2 does not identify size or type of framing members at canopy. A. Correct as stated and the framing members are to be sized by 13122 metal building system and roof system to match detail 10/4.3 with only 2" EPS require with (2) scuppers one the West and one on the East. 35. SUDAS trench bedding requirements for the water main, sanitary sewer, and storm sewer. A. All utility work shall conform to SUDAS Requirements as noted on 1.5. 36. Did not see a bid item for unsuitable back fill or trench stabilization. Do you want a per Ton price for this or will this be done T&M if we encounter. A. See spec sections 02200, 02600, 02660 and 02730. Unit prices as noted on bid form. 37. Type of material for sanitary sewer. Should it be SDR instead of schedule 40? A. No should be what is noted - schedule 40. 38. Want to clarify the water main tie ins will be a dead tap using a tee and not a live tap as the drawings indicate a 12x12x8 tee. A. At 2 connections to City water main add: Note: These connections will be made on water mains that have been taken out of service so the tap can be made. Coordinate with local water utility. 4 39. Bid not 4 on sheet 1.5. Do we assume all site utilities will be marked out by owner's surveyor so all potential conflicts can be checked before construction. A. Spec section 01010, 1.1,C Add #8 - General contractor shall be responsible for locating all improvements on the site, this includes: elevations, utilities, buildings/structures, curbs/gutters, grade elevations, etc. This shall include hiring of a surveyor to complete this work. 40. There is a form Equal Opportunity Clause which has a place for a signature. Does this form need to be included in with the bid forms? (see attached form) As far as the Reciprocal Resident Bidder Preference the only item that needs to be submitted is the form included in Add # 2 — Resident Bidder Certification. A see required items listed above. 41. Will you require the electrical subs to meet the requirements of Article 11.1.4 (Owner's and Architect's Protective Liability Insurance)? A. Sub requirements are the GC's responsibility. 42. What type of Insulation you're requiring in the Exterior Split units under Addendum #13. I'm unaware of anything that can be put in the core of a 12" block to achieve the "R" = 16 that you show on the plan. I would appreciate any insight that you can give me on that. A: Wall insulation at C.M.U. walls (Per Alternate #13) shall be foam in place per below: 1. Material — foam in place insulation should conform to the following MINIMUM PRODUCT PERFORMANCE STANDARDS a. Fire -Resistance Ratings: Minimum four (4) hour fire resistance wall rating (ASTM E-119) for concrete masonry units when used in standard two (2) hour rated CMUs. b. Surface Burning Characteristics: Maximum flame spread, smoke developed and fuel contributed of 5, 50-100, and 0 respectively. c. Combustion Characteristics: Must be noncombustible, Class A building material. d. Thermal Values: "R" Value of 4.7/ inch @ 35 degrees F mean; ASTM C-177. e. Sound Abatement: Minimum Sound Transmission Class ("STC') rating of 54 for 12" CMU and 52 for 8" CMU, and a minimum Outdoor Indoor Transmission Class ("OITC) rating of 44 for 8" wall assembly (ASTM E 90-90). 2. Execution — Foam in place insulation installation guidelines: a. Fill all open cells and voids in hollow concrete masonry walls where shown on drawings. The foam insulation shall be pressure injected through a series of 5/8" to 7/8" holes drilled into every vertical column of block cells (every 8" on center) beginning at an approximate height of four (4) feet from finished floor level. Repeat this procedure at an approximate height of ten (10) feet above the first horizontal row of holes (or as needed) until the void is completely filled. Patch holes with mortar and score to resemble existing surface. Insulation is not to be injected into wet walls. 5 43. A note on sheet #1.5 indicates two areas of possible contaminated soil, and instructs us to use" DNR Approved Methods" to remove/ handle this soil. Can you be more specific as to what the contamination is, and/or the approved methods to handle it? A. See attached revised area: Excavation within the Contaminated Fill Area can only be completed by Contractor employees with documented and current OSHA Hazardous Worker (HAZWOPER) Training. Copies of 40 hour OSHA HAZWOPER certificates and subsequent 8 hour annual OSHA HAZWOPER updates must be provided prior to beginning work in the Contaminated Fill Area. The City of Waterloo's Environmental Consultant will screen soils during removal actions and will coordinate the hauling and disposal of the soils excavated from the Contaminated Fill Area. The Contractor will direct toad soils during the excavation onto trucks coordinated by the City's Environmental Contractor. Trucking and disposal costs for the material from the Contaminated Fill Area will be paid directly by the City of Waterloo. Contractor employees completing road base preparation over the Contaminated Fill Area will also be required to have documented and current OSHA Hazardous Worker (HAZWOPER) Training. Copies of 40 hour OSHA HAZWOPER certificates and subsequent 8 hour annual OSHA HAZWOPER updates must be provided prior to beginning work in the Contaminated Fill Area. If material is found to be clean fill it will be the responsibility of the contractor to haul the material not required as fill material on the site. See attached revised area! Only one area of the site; not two as drawn on sheet 1.3. 44. Alternate #13 - The 'R' Value called out cannot be achieved with the concrete block and insulation. How are we to handle this alternate? Also, are the block going to be painted or sealed with water-repellent? A. See insulation below! Block sealer per (04200) 45. Per our phone conversation I am inquiring about site furnishings (Benches, Bollards, Bike racks, Litter receptacles, Tables) in regard to the Waterloo Public Works Complex project. My main question pertains to the presence of site furnishings on this project; if there are any and what they are (item, manufacturer, quantity). Any help in regard to my inquiry would be greatly appreciated. A. No Benches, Bollards, Bike racks, Litter receptacles, Tables required — Bollard at over head doors per plan by (05500) 46. I did have a quick question for you regarding Alternate #6. I see that it is a tearoff/reroof with a fully adhered system but my question is if you mean an actual "fully adhered" system, meaning all layers of insulation are glued down to deck using a insulation adhesive and then the membrane glued down to that, or if you are just wanting the insulation fastened to deck mechanically and then the membrane adhered to the ISO. A. Mechanically fasten system is acceptable. 47. I am trying to bid on section 12500 Blinds and Shades. I purchased the drawing from the City of Waterloo but am unable to find a window, Blind and shade schedule and drawings for size. A. See the schedule at the end of this addendum. 48. Alternate H-1 is complete control building system. A. Yes it is for the complete building system. 49. Do we price out the Alternates 13 and 14 against the base bid only — or also against the Alternates 1 and 2 collectively? A. Alternate 13 should be compared to Base Bid and Altemate 2 and Alternate 14 should be compared to Altemates 1 and 5. 50. What size weld will be used to connect that cap channel to the top flange of the beams show on 10/S5.1? Will the welds be continuous or intermittent? A. Sheet 5.1, detail 10 - Weld Connection of channel cap to top flange of beam shall be W fillet weld, both sides, 2" long at 12" o.c. 51. Do you know the depth of the sanitary sewer at Glenwood Street? A. See Sanitary lift station MH on P9 invert of pipe leaving MH is 838.00 — minimum pitch required to existing MH. 52. Is the existing manhole at the entrance off Glenwood 30" dia or 72" dia? The plan says 30" in one place and 72" in another place. A. That is a new 72" MH. Match existing rim and FL listed on sheet 1.4. 53. Is manhole #2 really 120" dia or can this be reduced for cost savings? A. Required to meet design. 54. The table of contents has section 7100 Waterproofing listed, but there is no specification for this section. A. As noted it is calling out section 07150 55. In addendum #2, item #30 it says the existing roofs are to be fully adhered system, not ballasted. Is this because of a concern with the existing structure and the weight of a ballast roof system? In the TPO option, do you want those roofs fully adhered in lieu of mechanically attached? A. TPO roof system can be mechanically attached. 56. Other than the standard language in General Conditions paragraph 10.3, we have not found anything in the bid documents pertaining to the removal of hazardous materials. Has assessment and remediation already been completed by the Owner? A. Relating to the building this item has been addressed. 57. Section 02200 Earthwork, 1.4, A Environmental Requirements: Has a Storm Water Pollution Prevention Plan been designed for this project? A. SHT 1.3 shows the detail for the silt fence install as noted around complete property line; and at the end of 02200 provides the remainder of the requirements. Has an NPDES permit been issued? A. This permit will be obtained by the City. Are the bidders expected to include the costs for design and permitting of the SWPP Plan in their bids? A. This has been completed by the civil and is in the hands of the City. 58. The Equal Opportunity Clause document inserted in the spec book behind the Non - Collusion Affidavit of Prime Bidder is not required to be submitted with the bid because it's not listed in "The list of City forms that MUST accompany your bid are:" section of the Notice of Hearing ... correct? A. It can come in later. We should just need it from the low bidder. 7 59. Section 09900 Painting: Please provide a product specification for traffic line paint. A. Per (02513-6) 60. Will the mezzanine hand rail along 9.3 line be part of alternate #5? A. Yes 61. Is the roof structural sloped? A. Yes see attached drawing sheet and areas of tapered insulation. PLUMBING At 2 connections to city water main add: Note: These connections will be made on water mains that have been taken out of service so the tap can be made. Coordinate with local water utility. Sheet P1 ROOM 142 — Water service, fire protection service and related piping/equipment are part of base bid 3'W piping to supply all base bid areas is part of Base bid, install along outside wall Capped CW piping to future areas is part of base bid 4"FD3 near water meter is part of base bid HB1 near water meter is part of base bid 6" process sewer main thru this area (or alt bid #1 area) is part of base bid Outside process sewer piping and 6000 gal separator is part of base bid ROOM 141 Contractor shall stub 6" sanitary sewer 5' into building, install floor CO Outside sanitary sewer is part of base bid Near Column K/ 9.3, N/9.3 and S/9.3 the note related to air & water drops shall have "base bid" changed to alternate #3 for the piping. Reels are still part of alternate #12. Air and Water at S/5.4 water drops shall have "base bid" changed to alternate #2 for the piping. Reels are still part of alternate #12. Near Column E & 7.5 the WF1 fixture and related piping are part of Alt Bid #1 Sheet P4 ROOM 167 At WR1 & AR1 change Alt Bid 4 to Alt Bid 6. Reels are still part of alternate #12. ROOM 168 At WR1 & AR1 change Alt Bid 4 to Alt Bid 6. Reels are still part of alternate #12. ELECTRICAL General: 1. Lighting representatives have submitted the following light types for prior approval and have been approved: 2. Light fixture types B, D, F,H, J, L, M, 0, P, EM1, X1, X2, X5, AA and OA submitted by Strauss Architectural Systems have been approved for general compliance. 8 Will you require the electrical subs to meet the requirements of Article 11.1.4 (Owner's and Architect's Protective Liability Insurance)? Not sure about this as it is under your section. 3. Where do the 4" PVC pipes on plan page E7 note 33 go to? On the plans it shows them ending under the parking lot? Conduits are to be stubbed just outside the building for incoming voice/data. 4. Does PP2 need to be 4Wire? Only 3phase non -neutral loads coming out of it. Panel PP2 is to be 4 wire per plans (277V available for any future water heaters, heaters, etc...). Sheet 1.2 — SITE LAYOUT AND PAVEMENT PLAN 1. Utility Pad Mount Transformer. As noted on sheet E7 is provided by the GC per the utilities specs. The transformer pad is 8'-8"x10'-0" w/containment area - see attached utility specs for the required work. BLIND SIZES EXTERIOR WALL BLINDS W D UN 2'-8" 5-0" 6 3'-4" 5-0" 19 2'-0" 5-8" 8 TOTAL 33 INTERIOR WALL BLINDS W D UN 3'-0" 4-2" 9 2'-6" 4'-2" 1 4'-6" 4'-0" 1 3'-6" 4'-0" 1 3'-0" 4'-0" 3 31-4" 4'-0" 1 5'-4" 4'-0" 2 TOTAL 18 TOTAL 51 9 LOCATION OF CUSTOMER FURNISHED PADS FOR 3-PHASE PAD -MOUNTED TRANSFORMERS (ALL SIZES) 3'- 0" MIN. SEE NOTE 2 10'- 0" MIN. SEE NOTE 2 ft RIVER ROCK-► FRONT OF PAD BUILDING WALL. BARRIER WALL OR SCREENING STRUCTURE SEE NOTE 1 MOAT SEE NOTE 7 PAD REINFORCEMENT GROUND ROD SLEEVE 1" METERING CONDUIT MAY BE REQUIRED CABLE CONDUIT BOX -OUTS. JAL CONDUITS SHALL BE CENTERED -ry ALONG THE BACK EDGE WITHIN BOX -OUTS �- TRAFFIC PROTECTION POSTS (BY CUSTOMER -AS REQUESTED BY COMPANY SEE NOTE 5 GATE SEE NOTE 2 1. The installation of a screening or barrier structure may be required by your local governing authority. It is the customer's responsibility to determine if a barrier structure is required. If screening or a barrier structure is required, or installed as an optional feature, the clearance limitations of notes 2 and 3 must be maintained. 2. A 3'-0" minimum clearance is to be maintained from pad sides and back, to the nearest structure. A level graded, 10'-0" minimum clearance is to be maintained from the front of pad, to the nearest fixed structure. If a full length gate is installed, it shall be hinged and no closer than 3'-0" from pad front. Local goverunent, fire protection, and building codes may require greater clearances. Customer will avoid plantings or construction that interferes with Company's required maintenance access to its equipment. If a fence or barrier is to be installed, it must be coordinated with the Company. 3. All conduits shall extend 3'-0" beyond the pad and screening structure (if used) and the locations of the ends of primary conduits shall be identified. Primary conduit will have a minimum cover of 42 inches below final grade. Secondary conduit will have a minimum cover of 30 inches below final grade. 4. When metallic conduit is utilized, customer shall install grounding bushings. 5. When necessary for traffic protection, set a 4" diameter concrete -filled galvanized steel post 3'-0" diagonally from pad corner. Post shall be 8' long with a 4' concrete embedment. 6. All Company transformers shall be located in an area accessible to Company vehicles. If special equipment, such as a crane, is required for setting or replacing the transformer, the customer shall pay all expenses. 7. A trench 2'-0" deep and 3'-0" wide will be dug on all four sides. The trench will be lined with silt fence fabric and filled with 2" screened river rock to final grade. Contact local engineering representative if design needs modification. Effective April 1, 2009 88 APPENDIX B-1 SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLANS AND OIL CONTAINMENT FOR CUSTOMER FURNISHED PADS FOR 3-PHASE PAD -MOUNTED TRANSFORMERS (ALL SIZES) Federal regulations prohibit the discharge of oil onto or into navigable waters of the United States or adjoining shorelines. A facility with aggregate above ground oil storage capacity of more than 1,320 gallons (counting only containers with oil storage capacity of 55 gallons or more) which could reasonably be expected to discharge oil to navigable waters of the United States, must prepare a Spill Prevention, Control and Countermeasure (SPCC) Plan. More specifically, whenever MidAmerican owned equipment at a customer facility exceeds this threshold (customer owned oil filled equipment at the site excluded), a plan must be prepared. This requirement affects bulk oil containers, oil -filled electrical equipment and oil -filled process equipment. Development of a site-specific SPCC Plan requires detailed knowledge of the facility and the potential effects of any oil release. Each SPCC Plan must include certain standard elements to ensure compliance with federal regulations. One of the elements is a description of appropriate containment and/or diversionary structures or equipment designed to prevent a discharge of oil to the environment. Due to potential for oil release from oil -filled electrical equipment, any proposed facility that includes installation of 3-phase padmount transformers (any size) will incorporate secondary containment measures to minimize a potential oil release. The following secondary containment design is recommended. An alternate design may be used with approval by MidAmerican Energy. For additional information on oil spill prevention or SPCC Plans, contact MidAmerican Energy Company, environmental services, at 515- 281-2951. To discuss an alternative containment design, contact MidAmerican Energy, distribution engineering, at 712-233-4834. 2" River Rork 1 2'-0" Transformer 3'-0"> L J Transformer Pad • TRENCH ON FOUR SIDES • 2' DEEP X3'WIDE • SILT FENCE FABRIC THAT WILL ALLOW WATER TO PASS THROUGH •2 ROCK, SCREENED Transformer Pad H-3'-0" Effective April 1, 2009 Silt Fence Fabric (m other soil fabric with equal or lower Po 3') 89 -3'-0'- 1 2'-0" APPENDIX B-1 CONCRETE PAD SPECIFICATION 3-PHASE PAD -MOUNTED TRANSFORMERS 1.0 GENERAL 1.1 Scope of Work The Contractor shall furnish all labor, materials, formwork, equipment, and services required to complete all concrete pad work shown on the drawings specified in this appendix. 1.2 Quality Assurance 1.2.1 Codes and Standards: Comply with provisions of following codes, specifications and standards, except where more stringent requirements are shown or specified: ACI 301 "Specifications for Structural Concrete for Buildings." ACI 318 "Building Code Requirements for Reinforced Concrete" Concrete Reinforcing Steel Institute, "Manual of Standard Practice." 1.2.2 Concrete Testing Service: The Contractor may be required to employ a testing laboratory acceptable to the Company to perform material evaluation tests and to design concrete mixes. 2.0 MATERIALS 2.1 Form Materials Forms for Exposed Finish Concrete: Unless otherwise indicated, construct framework for concrete surfaces with construction lumber, plywood, metal, metal framed plywood faced or other acceptable panel -type materials, to provide continuous, straight, smooth, exposed surfaces. Provide form material with sufficient thickness to withstand pressure of newly -placed concrete without deflection. 2.2 Reinforcing Materials 2.2.1 Reinforcing Bars (ReBar): ANSI/ASTM A 615 Grade 40, Deformed. 2.2.2 Welded Wire Fabric (WWF): ANSI/ASTM A 185, Welded steel wire fabric. 2.2.3 Supports for Reinforcement Provide supports (including bolsters, chairs, and spacers) for positioning reinforcing bars and welded wire fabric in place. 2.3 Concrete Materials 2.3.1 Cement shall conform to the latest revised standard specification for Portland Cement, ASTM C 150, Type 1, or standard specification for blended hydraulic cements, ASTM C 595. Effective April 1, 2009 90 APPENDIX B-2 CONCRETE PAD SPECIFICATION 3-PHASE PAD -MOUNTED TRANSFORMERS 2.0 MATERIALS (Continued) 2.3 Concrete Materials (Continued) 2.3.2 Concrete aggregates shall conform to the latest revised standard specification for concrete aggregates, ASTM C 33. Use crushed limestone for all aggregates. Maximum coarse aggregate size shall be not more than 1-1/2 inches. 2.3.3 All mixing water shall be clean andfree from deleterious amounts of acids, alkaline, or organic materials. 2.3.4 Air -entraining admixtures for concrete shall conform to the latest revised standard specifications for air -entraining admixtures for concrete, ASTM C260. 2.3.5 Calcium chloride is not permitted. 2.3.6 All other materials used in the concrete shall conform to current applicable ASTM specifications. 3.0 SUBGRADE PREPARATION 3.1 Material 3.1.1 All soft and yielding material and portions of the subgrade that will not compact readily when rolled or tamped shall be removed and replaced with suitable material. 3.2 Compaction 3.2.1 The subgrade shall be brought to a firm and unyielding condition. 3.2.2 Soil greater than/or equal to 95% Proctor density or 55 psi presumptive bearing value (pbv). 3.2.3 Soil should be compacted at or slightly above standard optimum moisture. 3.3 Moisture Barrier 3.3.1 A minimum 6 mil polyethylene film shall be placed on top of the sand leveling bed prior to pouring the concrete. 4.0 CONCRETE SPECIFICATIONS 4.1 General 4.1.1 All concrete shall have a minimum 28 -day compressive strength of 3500 psi. 4.1.2 Concrete shall be produced with a minimum cement content of 520 Ib per cubic yard and an entrained air content of 7% by volume. 4.1.3 Maximum allowable concrete slump shall be 4 inches. 4.1.4 Where it can be shown that adequate strength, surface finish, and durability can be obtained on a consistent basis with mix designs other than those specified above, such designs may be used upon written approval. Effective April I, 2009 91 APPENDIX B-2 (EXISTING ROOF ) INSTALL FULLY ADHERED EPDM SYSTEM OVER 5' 150 OR TRO MEGH. FASTENED SYSTEM Sire NIS Saflatier rArettesioaino 804 As, t.7 ff 477 '7eb Z ON N00 3 -UWWF RD eD alternate MB roof 0 R.C. RD. (NsuL42 0A,REp 4RFq 0 0 1 E�?EpRc A base bld roof bane bld roof (EXISTING ROOF INSTALL FULLY ADRERED EPDM SYSTEP? OVER 6" 150 OR TP0 MED-. FASTENED SYSTEM PER P IR.D. 0 J `oQ- 1i I O bane bid = roof wm V Existing Building FF 04e 70 AREA: 27,740 SF RD. RD. I I IJ 1 I I\N5 1pOR AREA base bld roof New Building FF S4b.SS AREA: 101,904 SF 22,0o9 SF (MEZZ) NOTAL: 123,973 SF base bid roof XQW moo_ 00 N m � alternate *2 roof R.D RD. RC, RD. RD. BASE 510 METAL ROOF PER 13122 _._.......--''c Bit. Aro 45,141 5F (11.06 45250 -*lotto. eigeitiattraeiflrspZetLttjt „��������I4 B�I ny .et -pm-tot B.w ,Iftwer •,• elle e i OSS U^ !n !�er --.4,hawnirrienSteintotten. aerie NoliI gg MIlid. grass, JIfM mndrui� Gubtln eulitling 6410 AREA, 26,140 55 YI.tIna Om.e. Cabinet. Bulleln0 New Su cling FF 84605 ARE& .01,904 SF 061 SF (515221 .TOTAL: 1 39'9 5F OS Teper®O.H. Door ®Asphalt a concrete LED L14617 PIMREP3 PER L 0 TYp. Light Pole OCantilevered Gate :in Cr AVO GAO 5CURCE GLENWOOD b 1 HEET O Asphalt 61Topeoll )°I2 Bite Layout end Pavement Plan ,-e r, . wmewe:a. f�iiM-monmaea.w. w.m a'a.am® City of Waterloo Public Works Building Re -Bid November 14,2011 A111 AI02 Alt Alt A115 MG A07 A118 0119 A1110 3I011 33112 company Base fila Q Z a 5 2 Add Workshop 167 & Parking 166 d fi 3 E 3 > New Concrete Floor 5 E 20 Masonry ILO Precase Walls SubabWle Steel Joist/Metal Deck 11.0 Precase Deck eu LEO tights Wash Bay 164 > _ S. C 3 m Cardinal Construction, Waterloo, l4 6,623,000 963.000 275,000 503.000 482,400 319.000 140.500 140,000 109,600 204,000 104,300 45,000 45.800 5 61,000 0 152,3001 25,300 6.600 9.100 35 20 500 6898,000 Henkel Construction Mason Cly. IA 6110,000 968.000 252,000 490,500 325.000 297,500 161,500 140.000 107.000 200,000 00,000 35.000 29,500 $ 190.000 3 (0000) 23.500 7,500 7,500 40 65 1.250 6962,000 Kraemer Brothers Constr003on, Plain, VVI 6,891000 1,070,090 280.000 583,000 477.000 290,000 125.000 142.00D 13,000 106.000 101,000 89,000 39,000 $110000018 (85,000) 78.000 10,000 11.000 30 60 200 1177,000 10,001 0onstruction, Independence, 13 6.200,000 985,000 252.000 510,000 460,000 265.000 164.000 150.000 113,000 198,000 96.000 20.000 30,000 $ 16.000 5 (49000) 24,000 10,000 10,000 65 65 500 6452,000 Porten Construction. Dubuque. IA 6.160,000 990.000 290,000 560.000 416000 227.000 160.000 141.000 113.000 201.500 87.000 10.000 30,000 5 (25.0003 5 121,000 24.000 10,000 10.000 30 55 450 1,050.000 Radian ConnruNSn, Urbandale, IA 6,840,000 1,100,000 264,000 500.000 460.000 315,000 175.000 145,000 110,000 200.03D 90,000 18.000 30,000 $ 00,000 0 - 24,000 0.800 9,800 25 10 200 7.104000 Samuels Group, Wausau, WI 6,815000 992,800 283.400 511,900 501.100 336,600 169,000 137.100 104.500 185,300 106.200 17.600 25,800 $ 82.000 8 (33.0001 33.000 7.800 0,200 30 30 292 1,090,400 Triton Construction, Dubuque, IA 6,010,000 920,000 260,000 440,000 490.000 320,000 100,000 142.000 109,000 210.000 98.000 78,000 46,000 $ 24,100 3 140,000 24.000 9,000 9,000 35 20 400 7.076.000 City of Waterloo Cardinal Construction, G Waterloo, IA IHenkel Construction, i7oMason City, IA �f?fD i e rand Construction, Davenport, IA Public Works Building Re -Bid November 14, 2011 iiiH II b 11111 Kraemer Brothers Construction, Plain, c , gyy „� ° WI I 1111 Larson Construction, Independence, IA �Jv��iU"O.- Portzen C onstruction, ��- Dubuque,lA IIIirbanda'leIA 111111111111111111111111111 I11®Samuels Group; Wausau WI 6 sSr r� ______________________________________________________ III1Dubuque, ' IIIIIIIIIIII 111111111111111111111111111111111111111111111111 111111 ����=�__�_==__ -(vr5vim, 7Ga' —__ City of Waterloo Public Works Building Re -Bid November 14, 2011 ### -o to N E, 0 a c' N, a aAlt I _.. -O no'Ha'c <!<: mo Company 13 -r w OJ it ® o in° 2 a Alt 14 Alt #H-1 Alt #E-1' Alt #E-2 x oE E c o 0 e 0 N 0 N N 0 a> < n ''.. V a a 0 i- 11 Fa ay a o,^, oa i, a ° a t -1 - Unit IA Unit 18 Unit 10 Base Bid —� Cardinal Construction, Waterloo, IA — _�-- -_ _ Henkel Construction, Mason City, IA Hillebrand Construction, Davenport, IA Kraemer Brothers Construction, Plain, Larson Construction, Independence, IA Portzen Construction, Dubuque, IA Rochen Construction, Urbandale, IA Samuels Group, Wausau, WI Tricon Construction, Dubuque, IA Mayor BUCK CLARK COUNCIL MEMBERS ................... DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA COMMUNITY PLANNING AND DEVELOPMENT 715 Mulberry Street • Waterloo, Iowa 50703-5783 • (319) 291-4366 Fax (319) 291-4262 NOEL C. ANDERSON, Community Planning & Development Director Council Communication City Council Meeting: November 1 2 1 Prepared: November 9, 2011 Dept. Head Signature: # of Attachments: SUBJECT: FY 2011 demolition contract with Peterson Contracting Inc., for demolition and site clearance of the former Grand Hotel at 300 W. Mullan Avenue in the amount of $149,700. Submitted by: Noel Anderson- Community Planning & Development Director Recommended City Council Action: That City Council approve FY 2011 demolition contract with Peterson Contracting Inc., for demolition and site clearance of the former Grand Hotel at 300 W. Mullan Avenue in the amount of $149,700. Summary Statement: The City of Waterloo will be demolishing these structures in an effort to eliminate slum and blight and to attract new development. The Community Planning & Development Department received six bids for demolition and site clearance services from Active Thermal Concepts; Hiawatha Iowa, Baker Concrete and Excavating; Waverly, Iowa, Benton's Sand and Gravel, Inc.; Cedar Falls, Iowa, Kelly Demolition; Mount Vernon, Iowa, Frickson Brothers Excavation; Evansdale, Iowa, and Peterson Contractors Inc., Reinbeck, Iowa. All bidders submitted all required documentation for this bid and there were no disqualifications. Peterson Contractors Inc. (PCI) is the low responsible bidder for the project and staff recommends that they be awarded the contract. Expenditure Required: $149,700 Source of Funds: The demolition activities of this site will be undertaken by the City of Waterloo using G.O. funds, for nuisance abatement. Policy Issue: Slum and Blight Alternative: N/A Background Information: The City of Waterloo purchased his property to demolish and eliminate slum and blight. cc: NOEL C. ANDERSON, Community Planning & Development Director CITY WEBSITE: wwwci.waterloo.ia.us WE'RE WORKING FOR YOU! An Equal Opportunity/AifirmatIve Action Employer EXHIBIT "A" SIGNATURE PAGE The undersigned Proposer/Bidder, having examined these documents and having full knowledge of the condition under which the work described herein must be performed, hereby proposes that they will fulfill the obligations contained herein in accordance with all instructions, terms, conditions, and specifications set forth; and that they will furnish all required services and pay all incidental costs in strict conformity with these documents for the stated process as payment in full. Our bid, for demolition and site clearance of the site is, not to exceed: $ H61)700 - Amount in written form, not to exceed: $ o na hur &1 ( for4 y Mite wwsa�� ,5-eVkethSleel Submitting Firm: ole -r/ -9a7? c YnI-rJt_i t5 1 G. Address: Po BOIL./ City: Rin hec k State: ,r,4 Zip: y Authorized Representative (print) r r) RK P `ZSN/ Authorized Representative Signature "74 Date : )1- i' 1 Phone: '3 l or 3 L —)- )-T 13 S'aGG9 Email: (Slay BiOders nCon`Irathors.Can Fax: 319 — 3145 - . gt3I EXCEPTIONS/DEVIATIONS to this Request for Proposal shall be listed in writing on an attached document provided by the Bidder. Please be as specific as possible. Please check one: JL Our company has no exceptions/deviations. Our company does have exceptions/deviations which are listed on an attached document. GENERAL INFORMATION. Freight and/or delivery charges, if any, shall be included in the price. FIRM PRICING. Offered prices shall remain firm for a minimum of sixty (60) days after the due date of this solicitation unless indicated otherwise. Accepted prices shall remain firm for the duration of the contract. ADDENDA (It is the Bidder's responsibility to check for issuance of any addenda). The authorized representative herby acknowledges receipt of the following addenda: Addenda Number t! Date _ 11 -3 -I I Addenda Number Date Addenda Number Date Addenda Number Date We choose not to bid at this time but would like to be considered for future requests for bid Demolition and Site Clearance Services (No Regulated Asbestos -Containing Materials) for the Former Grand Hotel November 7, 2011 Bid Tab Estimate: $380,0000.00 Bid Security Required Bidder Bid Security Bid Amount Active Thermal Concepts 2805 Stonegate Court Hiawatha, Iowa 52233 5% $224,224.00 Baker Concrete & Excavating 2203 E. Bremer Avenue PO Box 277 Waverly, Iowa 50677 5% $217,000.00 Benton's Sand & Gravel, Inc 905 Center Street Cedar Falls, Iowa 50613 5% $202,828.00 Kelly Demolition LLC 1100 W. Mt. Vernon Road Mount Vernon, Iowa 52314 5% $218,642.00 Erickson Brothers Excavation 737 Colleen Avenue Evansdale, Iowa 50707 $8,100.00 check $162,000.00 Peterson Contractors Inc. Box A Reinbeck, Iowa 50669 5% $149,700.00 Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA COMMUNITY PLANNING AND DEVELOPMENT 715 Mulberry Street • Waterloo, Iowa 50703-5783 • (319) 291-4366 Fax (319) 291-4262 NOEL C. ANDERSON, Community Planning & Development Director Council Communication City Council Meeting: 11/14/11 Prepared: 11/10/11 Dept. Head Signature: 74(..- # of Attachments: 10 SUBJECT: Resolution approving award of contract to McClain & Co., Inc. of Waterloo, Iowa for an amount not to exceed $63,250.50 for Demolition and Site Clearance Services (no regulated asbestos -containing materials) Group 2 in connection with Public Assistance (PA) demolition activities of the Hazard Mitigation Grant Program (HMGP) Property Acquisition Project. Submitted by: Aric Schroeder, City Planner Recommended City Council Action: Award a contract for demolition and site clearance services group 2 to McClain & Co., Inc., and authorize the Mayor and City Clerk to sign and contract. Summary Statement: Expenditure Required: $63,250.50 Source of Funds: FEMA Public Assistance (PA) Project WorksheetO2RJD73 Policy Issue: Demolition and site clearance of properties acquired as part of the HMGP Property Acquisition Project Alternative: N/A Background Information: On 1/20/09 the City Council authorized the submittal of an application to apply for Hazard Mitigation Grant Program (HMGP) 1763 Structural Acquisition (Buy Out) funds through the Iowa Homeland Security and Emergency Management Division (HSEMD). On 7/17/09 the City of Waterloo received official notice that the City was awarded funding under the program in accordance with the scope of work and budget that was included in our application that was submitted and approved by HSEMD and FEMA. On 8/3/09 the City Council authorized the agreement between HSEMD and the City of Waterloo, which has subsequently been executed. The total HMGP Property Acquisition (Buy CITY WEBSITE: wwwci.waterloo.ia.us WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer Out) budget is $4,859,419.00 (based on recent de -obligation), with funding from HSEMD for up to 75% of the total project budget, and funding from the Iowa Department of Economic Development (IDED) through a Supplemental Community Development Block Grant (CDBG) for 25% of the total project, including the 10% State portion and the required 15% local match. The Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. X5121- 5207 provides for the FEMA Public Assistance (PA) Program. The PA Program funds multiple disaster recovery activities, such as asbestos abatement. Sections 403 Essential Assistance and 404 Hazard Mitigation provide funding for demolitions associated with a HMGP Property Acquisition (Buy Out) Program. With this disaster (DR -1763) the program is funded 90% Federal share and 10% State share, with no required local match. Unlike the HMGP Program, with the PA Program communities are not issued an award, but all eligible expenses will be reimbursed through Project Worksheets (PW's). Therefore expenses related to the demolition of acquired properties, including administration and contractual expense (which would include a demolition contract) will be eligible for reimbursement through the FEMA PA Program. The City of Waterloo is looking to award a contract after seeking proposals for demolition and site clearance in connection with the HMGP property acquisition project. This second and final contract is for ten properties. All properties have been acquired by the City of Waterloo as part of the HMGP Property Acquisition Project. Proposals for demolition and site clearance services (no-RACM) group 2 were received from seven firms, including: Active Thermal Concepts, Hiawatha, IA; Affordable Hazards Removal, Monticello, IA; Baker Concrete & Excavating, Waverly, IA; Benton's Sand & Gravel, Cedar Falls, IA; Kelly Demolition LLC, Mount Vernon, IA; McClain & Company, Inc., Waterloo, IA; and Peterson Contractors Inc., Reinbeck, IA. Please find attached a letter of recommendation on award of Contract from the Proposal Evaluation Selection Committee, as well as the Proposal Evaluation Tab (bid tab) for the proposals, as well as the contract to be executed. If you have any questions or need any additional information on this matter, please contact our office. cc: Noel Anderson, Community Planning & Development Director Chris Western, Planner 11 Path: K:\USERS\ARIGS\City of Waterloo \ council letters \RFPs Bids Contracts and Agreements for Goods or Services \11.10-11 Council Communication for Award of Contract for Demolition Services no-RACM Group 2 for HMGP.doc Mayor BUCK CLARK CITY OF WATERLOO, IOWA COMMUNITY PLANNING AND DEVELOPMENT 715 Mulberry Street • Waterloo, Iowa 50703-5783 • (319) 291-4366 Fax (319) 291-4262 NOEL ANDERSON, Community Planning & Development Director November 10, 2011 The Honorable Buck Clark, Mayor and the City Council Members City Hall COUNCIL Waterloo, Iowa 50703 MEMBERS DAVID JONES Ward l CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN M. HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large Dear Mayor and Council Members: RE: Award of Contract - Demolition and Site Clearance Services (no RACM) Group 2 - Hazard Mitigation Grant Program (HMGP) Property Acquisition Project - Public Assistance (PA) Demolition. Proposals for demolition and site clearance services (no RACM) group 2 were received from seven firms, including: Active Thermal Concepts, Hiawatha, IA; Affordable Hazards Removal, Monticello, IA; Baker Concrete & Excavating, Waverly, IA; Benton's Sand & Gravel, Cedar Falls, IA; Kelly Demolition LLC, Mount Vernon, IA; McClain & Company, Inc., Waterloo, IA; and Peterson Contractors Inc., Reinbeck, IA. The Proposal Evaluation Selection Committee thoroughly evaluated the proposals based on the firm's experience and the firm's principal project manager's experience, the firm's responsiveness to the RFP (including total scope of services offered, compliance with submission guidelines, and overall proposal presentation), and the cost effectiveness of the firm's financial proposal. All seven bidders submitted the required "Financial" portion in their proposal. Three companies (McClain & Co., Benton's Sand & Gravel, and Peterson Contractors Inc.) did not submit anything for the "Non -Financial" portion of their proposal as requested in the request for proposal. "Non -Financial" data requested included a detailed service plan and timeline proposed, details on the experience of the company and key personnel highlighting other similar projects that they have worked on, a list of staff with name, title and description of work they would perform, an indication of who the principal or project manager would be, and a list of references. One company (Affordable Hazards Removal) did not submit a required certification on bidder suspension and debarement. The Request for Proposal that was submitted to all prospective bidders clearly indicated that this information was to be included. The RFP also stated that "Failure to complete or provide any of the information requested in this RFP, including references, and/or additional information as indicated, may result in disqualification by reason of 'non responsiveness'." And the RFP stated that the award of contract would be made to the most responsible and responsive proposal from a company whose proposal offers the greatest value to the City with regard to the criteria detailed and the specifications set forth within the RFP, and stated that proposals would be evaluated on: 1) qualifications and experience including years of experience of key personnel, feedback from references, and knowledge and experience with projects involved with federal and state grants, 2) cost effectiveness, and 3) company responsiveness to RFP, including total scope of services offered, responses to CITY WEBSITE: www.ci.waterloo.ia.us WE'RE WORKING FOR YOU! overall proposal and compliance with submission guidelines, and proposal presentation (completeness, organization, appearance, etc.). The proposal submitted by McClain & Co., Inc. was a good proposal that provided most information requested by the RFP. They did not provide a "Non -Financial" portion, although staff had no major concerns with the company, and has subsequently obtained much of the information requested in the "Non -Financial" portion. The proposal from McClain & Co., Inc. did have a stated bid total of $63,250.00, but the correct math of the individual bid tabs for each of the properties included in the project was $63,250.50 (they rounded a couple of bid amounts down to the nearest whole dollar). In accordance with the provisions of Exhibit "E" of the RFP which states that "The correct summation of actual bid tabulation figures will supersede any amounts shown on this page", and in accordance with the provisions of Section 1.2 of the RFP which provides for the City to waive "irregularities", the incorrect figure listed on Exhibit "E" shall be considered an irregularity and waived, as the rounding did not provide a competitive advantage to any Proposer, and the correct math of the individual bid tabs shall be considered the bid amount. The Committee has determined that the proposal submitted by McClain & Co., Inc. was the most responsible and responsive proposal that offered the greatest value and expertise to the City. Therefore, the Proposal Evaluation Selection Committee recommends that the contract for demolition and site clearance services (no RACM) group 2 in connection with Public Assistance (PA) demolition activities of the Hazard Mitigation Grant Program (HMGP) 1763 Structural Acquisition (Buy Out) program be awarded to McClain & Co., Inc. Please fmd attached the Proposal Evaluation Tab (bid tab) for the proposals, as well as the contract to be executed. If you have any questions or need any additional information on this matter, please contact our office. Respectfully, Aric A. Schroeder, City Planner CITY OF WATERLOO, IOWA Proposal Evaluation Tab for Request for Proposal November 2011 DEMOLITION AND SITE CLEARANCE SERVICES GROUP 2 [no regulated asbestos -containing materials (no RACM)] HAZARD MITIGATION GRANT PROGRAM (HMGP) PROPERTY ACQUISITION PROJECT City of Waterloo, Iowa Prepared by City of Waterloo Planning and Zoning Department Proposal Evaluation Tab for Request for Proposals for Demolition and Site Clearance Services (no RACM) Group 2 blas received: / Detail of Cost Inputs Evaluation Criteria Qualifications and Experience (Max of 15 points) Government Experience with Company (Max of 15 points) Company Responsiveness to RFP (Max of 20 points) Cost Effectiveness (Max of 50 points) Total (Maximum of 300 points) Total lump sum bid (total cost based on the tabulated amounts from each property bid tab) Active Thermal Concepts Hiawatha, IA 11 11 12 44 78 $72,910.00 Affordable Hazards Removal, Inc. Monticello, IA 10 8 13 15 46 $171,075.00 Baker Concrete & Excavating Waverly, IA 10 11 15 45 81 $69,921.00 Benton's Sand & Gravel, Inc. Cedar Falls, IA 14 15 8 30 67 $103,750.00 Kelly Demolition, LLC Mount Vernon, IA 12 12 14 31 69 $98,835.36 McClain & Co Waterloo, IA 11 9 12 50 82 $63,250.50 Peterson Contractors Inc. Reinbeck, IA 15 15 8 25 63 $125,640.00 PROPOSAL EVALUATION TAB FOR RFP FOR DEMOLITION AND SITE CLEARANCE SERVICES (no RACM) — 2011 CONTRACT FOR DEMOLITION AND SITE CLEARANCE SERVICES [no Regulated Asbestos Containing Materials (no RACM)] This Contract for Demolition and Site Clearance Services (no RACM) (the "Contract") is entered into as of November 14, 2011, by and between the City of Waterloo, Iowa ("City") and McClain & Co., Inc. ("Contractor"). In consideration of the mutual promises exchanged herein, the parties agree as follows: 1. Services. For a period of five (5) months after the date of this Contract, subject to extension upon the mutual written agreement of the parties, the Contractor agrees to furnish all supervision, technical personnel, labor, materials, tools, machinery, services, and perform and substantially complete all work within the time period stated in the specifications after receipt of Notice to Proceed with respect to a given property or set of properties. Work to be performed includes all work described in the Contract Documents (defined below). Contractor shall provide the above services at the cost set forth in Contractor's RFP response. Contractor will be paid separately for each property for which services are performed and accepted. Contractor's request for payment for services authorized under this Contract shall be submitted on a monthly basis and will be paid within sixty (60) days after receipt of an original invoice and after such services are delivered and accepted. Contractor will be paid for all items satisfactorily completed. Such payment will be full compensation for all work performed, for all permits, licenses, inspections, for complying with all laws, rules, regulations and ordinances, including safety, and for furnishing all materials, equipment and labor to complete the work, in accordance with the specifications. 2. Contract Documents. The following documents (collectively, the "Contract Documents") are hereby incorporated by reference as though set forth herein in full: a. Request for Proposal b. Addenda c. Response (Proposal) from the Contractor, including Bid Tabulation d. Specifications for Demolition and Site Clearance e. Signature Page f. Building Demolition Insurance Requirements In the event of conflict between the provisions of the Contract Documents and this Contract, the provisions of this Contract shall prevail. 2.1 Contract Limits. Total actual expenses allowed by the project Contract, including any renewal extensions of the Contract, shall not exceed $63,250.50 as provided in the Bid Tabulation that is part of Contractor's RFP Response referenced in Section 2.c above, except by written amendment as provided herein. 3. Approval; Timing of Work. Contractor shall not begin work on any demolition until after the contract has been approved by the city council and the Contractor has been issued a Notice to Proceed with respect to any particular property or set of properties. The work shall commence within seven (7) days after the City has issued a Notice to Proceed with respect to any particular property or set of properties, and all work shall be completed and delivered within thirty (30) days after issuance of the Notice to Proceed. 4. Performance Bond. Contractor will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price and shall be issued by a responsible surety acceptable to the City. The bond shall guarantee the faithful performance of the contract and the terms and conditions therein contained, shall guarantee the prompt payment of all materials and labor and protect and save harmless the City from claims and damages of any kind arising out of the performance of this contract. 4.1 Payment Bond. Contractor will be required to furnish a payment bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety acceptable to the City. The bond shall guarantee the faithful payment as required by law of all persons supplying labor and material in the execution of the work provided for in the Contract. 5. Reporting; Records. Contractor shall exercise best efforts to maintain communication with City personnel whose involvement in the project is necessary or advisable for successful and timely completion of the work of the project, including but not limited to the closing of specific transactions. Communications between the parties shall be verbal or in writing, as requested by the parties or as dictated by the subject matter to be addressed. Contractor shall maintain all project records for a minimum period of three (3) years after the date of final payment for services rendered under this Contract. During the term of this Contract and for the ensuing record -retention period, Contractor shall make any or all project records available upon reasonable request, and in any event within two (2) business days of request, to City, Iowa Homeland Security and Emergency Management Division (HSEMD), the Federal Emergency Management Agency (FEMA), the Comptroller General of the United States, and any other agency of state or federal government, or the duly authorized representatives of any of the foregoing, that has provided funding or oversight for the HMGP property acquisition project, for the purpose of making audit, examination, excerpts and/or transcriptions. For purposes of this section, "records" means any and all books, documents, papers and records of any type or nature that are directly pertinent to this Contract. Contractor agrees to furnish, upon termination of this Contract and upon demand by the City, copies of all basic notes and sketches, charts, computations, and any other data prepared or obtained by the Contractor pursuant to this Contract, without cost and without restrictions or limitation as to the use relative to specific projects covered under this Contract. In such event, the Contractor shall not be liable for the City's use of such documents on other projects. 6. Government -Mandated Provisions. Because the project activity is funded by the federal government, federal law requires that the City's contracts relating to the project include certain provisions. Parenthetical comments in the following paragraphs are taken from 44 CFR § 13.36(i). A. Remedies. See Section 8 below. 2 B. Termination for Cause and for Convenience. See Sections 8 and 9 below. C. Contractor shall comply with Executive Order 11246 of September 24, 1965, entitled "Equal Employment Opportunity," as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR Chapter 60). (applies to all construction contracts awarded in excess of $10,000 by grantees and their contractors or subgrantees) D. Contractor shall comply with the Copeland "Anti -Kickback" Act (18 U.S.C. 874) as supplemented in Department of Labor regulations (29 CFR Part 3). (applies to all contracts and subcontracts for construction or repair) E. Contractor shall comply with the Davis -Bacon Act (40 U.S.C. 276a to 276A-7) as supplemented by Department of Labor regulations (29 CFR Part 5). (applies to construction contracts in excess of $2,000 awarded by grantees and subgrantees when required by federal grant program legislation, but does not apply to projects paid for with disaster funding) F. Contractor shall comply with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor regulations (29 CFR Part 5). (applies to construction contracts awarded by grantees and subgrantees in excess of $2,000, and in excess of $2,500 for other contracts which involve the employment of mechanics or laborers) G. City's Reporting Regulations and Requirements. See Section 5 above. H. Patent Rights and Copyrights. With respect to any discovery or invention which arises or is developed in the course of or under this Contract, the Contractor is responsible for complying with requirements pertaining to patent rights, as defined by the awarding agency. With respect to any publication, documents, or data that arises or is developed in the course of or under this Contract, the Contractor is responsible for complying with requirements pertaining to copyright, as defined by the awarding agency. I. Access to Documents. See Section 5 above. J. Retention of Documents. See Section 5 above. K. Contractor shall comply with all applicable standards, orders, or requirements issued under Section 306 of the Clean Air Act (42 U.S.C. 1857(h)), Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR Part 15). (applies to contracts, subcontracts, and subgrants of amounts in excess of $100,000) L. Energy Efficiency Standards. Contractor shall comply with mandatory standards and policies relating to energy efficiency that are contained in the State Energy Conservation Plan issued pursuant to the Energy Policy and Conservation Act (Pub. L. 94-163, 3 89 Stat. 871). [53 FR 8078, 8087, Mar. 11, 1988, as amended at 60 FR 19639, 19645, Apr. 19, 1995]. 7. Indemnity. Except as to any negligence of City, its officials, officers, employees or agents, in the performance of any duty under this Contract, and to the extent not covered by insurance maintained by Contractor, Contractor agrees to defend and indemnify US Government, FEMA, State of Iowa, and City, the officials, officers, employees, agencies and agents of each, and to hold same harmless, from and against any and all claims, demands, causes of action, losses, costs, or liabilities whatsoever, including but limited to reasonable attorneys' fees and expenses, arising from or in connection with the acts or omissions of Contractor in providing the services contemplated by this Contract. This will include but is not limited to actions or suits based upon or alleging bodily injury, including death, or property damage rising out of or resulting from the Contractor's operation under this Contract, whether by itself or by any subcontractor or anyone directly or indirectly employed by any of them. Contractor is not and shall not be deemed an agent or employee of the City. 7.1 Property Damage. Contractor shall be responsible for all damage to public or private property. Contractor shall have one responsible person at the job site at all times when demolition activities are undertaken. Contractor shall keep a report of all damage. If public or private property is damaged by Contractor and is not repaired in a timely manner as determined by City, City has the option of having the damage repaired at the Contractor's expense, to be reimbursed to the City or withheld from future payments to Contractor hereunder. 8. Default; Termination for Cause. In the event that Contractor defaults in the performance or observance of any covenant, agreement or obligation set forth in this Contract, and if such default remains uncured for a period of seven (7) days after notice thereof shall have been given by City to Contractor (or for a period of fourteen (14) days after such notice if such default is curable but requires acts to be done or conditions to be remedied which, by their nature, cannot be done or remedied within such 14 -day period and thereafter Contractor fails to diligently and continuously prosecute the same to completion within such 14 -day period), then City may declare that Contractor is in default hereunder and may take any one or more of the following steps, at its option: a. by mandamus or other suit, action or proceeding at law or in equity, require Contractor to perform its obligations and covenants hereunder, or enjoin any acts or things which may be unlawful or in violation of the rights of the City hereunder, or obtain damages caused to the City by any such default; b. have access to and inspect, examine and make copies of all books and records of Contractor which pertain to the project; c. declare a default of this Contract, make no further disbursements, and demand immediate repayment from Contractor of any funds previously disbursed under this Contract; d. terminate this Contract by delivery to Contractor of written notice of termination; and/or 4 e. take whatever other action at law or in equity may be necessary or desirable to enforce the obligations and covenants of Contractor hereunder, including but not limited to the recovery of funds. No delay in enforcing the provisions hereof as to any breach or violation shall impair, damage or waive the right of City to enforce the same or to obtain relief against or recover for the continuation or repetition of such breach or violation or any similar breach or violation thereof at any later time or times. In the event that City prevails against Contractor in a suit or other enforcement action hereunder, Contractor agrees to pay the reasonable attorneys' fees and expenses incurred by City. 9. Termination for Convenience. This Contract may be terminated at any time, in whole or in part, upon the mutual written agreement of the parties. City may also choose to terminate this Contract at any time by delivering to Contractor 10 -days' advance written notice of intent to terminate. 10. Non -Assignable Duties. Contractor may not assign its duties hereunder without the prior written consent of City. 11. Independent Contractor. Contractor is an independent contractor and is not an employee, servant, agent, partner, or joint venturer of City. Contractor has no power or authority to enter into contracts or agreements on behalf of City. City shall determine the work to be done by Contractor, but Contractor shall determine the legal means by which it performs the work specified by City. City is not responsible for withholding, and shall not withhold, FICA or taxes of any kind from any payments which it owes Contractor. Neither Contractor nor its employees, if any, shall be entitled to receive any benefits which employees of City are entitled to receive and shall not be entitled to workers' compensation, unemployment compensation, medical insurance, life insurance, pension, or any benefits of any type or nature whatsoever on account of their work for City. Contractor shall be solely responsible for compensating its employees, if any. 12. Anti -Discrimination. During the performance of this Contract, Contractor, for itself, its assignees and successors in interest, agrees to comply with the anti -discrimination laws of the State of Iowa, as contained in Sections 19B, 551.4 of the Code of Iowa, which are herein incorporated by reference and made a part of this Contract. 13. Severability. In the event any provision of this Contract, together with the Contract Documents, is held invalid, illegal, or unenforceable, whether in whole or in part, the remaining provisions of this Contract shall not be affected thereby and shall continue in full force and effect. If, for any reason, a court finds that any provision of this Contract is invalid, illegal, or unenforceable as written, but that by limiting such provision it would become valid, legal, and enforceable, then such provision shall be deemed to be written and shall be construed and enforced as so limited. 14. General Terms. This Contract, together with the Contract Documents, constitutes the entire agreement between the parties pertaining to the subject matter hereof. This Contract may not be modified or amended except pursuant to the mutual written agreement of the parties. This Contract is binding on the parties and the heirs, personal representatives, successor and assigns of each. Time is of the essence in the performance of the terms hereof. 5 IN WITNESS WHEREOF, the parties have executed this Contract for Demolition and Site Clearance Services as of the date first set forth above. CITY OF WATERLOO, IOWA MCCLAIN & CO. INC. By: Ernest G. Clark, Mayor Ken Huntley, Superintendent Attest: Suzy Schares, City Clerk 6 Mayor BUCK CLARK COUNCIL MEMBERS e...e..o.o.e.00...o DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA COMMUNITY PLANNING AND DEVELOPMENT 715 Mulberry Street • Waterloo, Iowa 50703-5783 • (319) 291-4366 Fax (319) 291-4262 NOEL C. ANDERSON, Community Planning & Development Director CITY OF WATERLOO Committee Communication Building and Grounds Meeting: No Prepared: November 9, 2011 Dept. Head Signature # of Attachments: SUBJECT: Lease of 1,100 Sq. Ft. of office space to Robert Klingenberg Community Partnership Apprentice Training Program, for $1.00 dollar per year at 1100 Sycamore Street. Submitted by: Noel Anderson Recommended Building and Ground Action: To make recommendation to City Council to approve proposed lease. Summary Statement: Staff has received a request to lease approximately 1,100 square feet of office space from Robert Klingenberg of Community Partnership Apprentice Training Program; (a non-profit 501c3) program, for the purpose of running an Apprenticeship program for young adults. Mr. Klingenberg has offered to rent the space for $1.00 a year, and the program would pay utilities. The average electric bill for this portion of the building has been $50 per month during the summer and $150 during the winter. Expenditure Required N/A Source of Funds N/A Policy Issue Lease of City owned property Alternative: Leave vacant Background Information: As a part of the East River Front Housing project, the city acquired the building that once housed Black Hawk Sprinkler located at 1100-1106 Sycamore Street. Cc Noel Anderson, Community Planning and Development Aric Schroeder, City Planner CITY WEBSITE: www.ci.waterloo.ia.us WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer BUSINESS PROPERTY LEASE This Business Property Lease (the "Lease") is made and entered into as of December 1, 2011, by and between City of Waterloo, Iowa (the "Landlord"), whose address for the purpose of this Lease is 715 Mulberry Street, Waterloo, Iowa, 50703, and Robert Klingenberg (the "Tenant"), whose address for the purpose of this Lease is 525 Bourland Street, Waterloo, Iowa, 50702. 1. PREMISES AND TERM. The Landlord, in consideration of the rents herein reserved and of the agreements and conditions herein contained, on the part of the Tenant to be kept and performed, leases unto the Tenant and Tenant hereby rents and leases from Landlord, according to the terms and provisions herein, the following described real estate, situated in Black Hawk County, Iowa: Land and building 1100 Sycamore Street, Waterloo, Iowa with the improvements thereon and all rights, easements, and appurtenances thereto belonging, for a term of one (1) year, commencing on the first day of the Lease term, which shall be on the 1st day of December 1, 2011 , and ending at midnight on the last day of the Lease term, which shall be on the 31st day of January 2012 upon the condition that the Tenant pays rent therefor, and otherwise performs as in this Lease provided. 2. RENTAL. (a) RENT. Tenant agrees to pay to Landlord as rental for said term, as follows: $ 1.00 per year, in advance, the first such rent payment becoming due on December 1, 2011, and the same amount, per year, in advance, on the 1st day of each month after the first month of the Lease term, during the term of this Lease. (b) SECURITY DEPOSIT. In addition to the above monthly rentals, Tenant shall also pay a security deposit in the amount of $ 0 , due and payable upon execution of this Lease. (c) OTHER. All sums shall be paid at the address of Landlord, as above designated, or at such other place as the Landlord may, from time to time, previously designate in writing. Delinquent payments shall draw interest at 18% per annum, compounded monthly, from the due date, until paid. 3. POSSESSION. Tenant shall be entitled to possession on the first day of the term of this Lease, and shall yield possession to the landlord atthe date -of the close of this Lease term,, except as herein otherwise expressly provided. Should Landlord be unable to give possession on said date, Tenant's only damages shall be a rebating of the pro rata rental. 4. USE OF PREMISES. Tenant covenants and agrees during the term of this Lease to use and to occupy the leased premises only for general office and commercial purposes consistent with Tenant's pre -Lease activities on the premises, or such other lawful use as Landlord may permit. Landlord has not reviewed zoning or other applicable legal requirements or limitations imposed by any local, state, or federal governmental authority that may affect Tenant's use of the premises, and Landlord makes no representation or warranty that the premises is suitable for Tenant's intended use. Tenant shall conduct its own review of applicable law and shall be solely responsible for meeting all legal requirements, including but not limited to building permits, licensure, or governmental approval. 5. QUIET ENJOYMENT. Landlord covenants that its estate in said premises is fee simple and that the Tenant on paying the rent herein reserved and performing all the agreements by the Tenant to be performed as provided in this Lease, shall and may peaceably have, hold and enjoy the demised premises for the term of this Lease free from molestation, eviction or disturbance by the Landlord or any other persons or legal entity whatsoever. Landlord shall have the right to mortgage all of its right, title, interest in said premises at any time without notice, subject to this Lease. 6. CARE AND MAINTENANCE OF PREMISES. (a) Tenant takes said premises in their present condition except for such repairs and alterations as may be expressly herein provided. (b) LANDLORD'S DUTY OF CARE AND MAINTENANCE. Landlord will not replace and repair any part of the building or any part of the leased premises. (c) TENANTS DUTY OF CARE AND MAINTENANCE. Tenant shall, after taking possession of said premises and until the termination of this Lease and the actual removal from the premises, at its own expense, care for, maintain, and repair the exterior and interior parts of said premises, in a reasonably safe and serviceable condition consistent with its own needs and pursuant to applicable law, ordinance or regulation. Tenant will furnish its own interior and exterior decorating. Tenant will not permit or allow said premises to be damaged or depreciated in Landlord a certification from the respective insurance companies to that effect. Such insurance shall be made payable to the parties hereto as their interests may appear, except that Tenant's share of such insurance proceeds are hereby assigned and made payable to the Landlord to secure rent or other obligations then due and owing by Tenant to Landlord. To the extent permitted by their policies, Landlord and Tenant waive all rights of recovery against each other. (b) Tenant further covenants and agrees that it will at its own expense procure and maintain combined single limit liability, bodily injury, and property damage insurance in the amount of not less than $1,000,000. Such insurance shall cover liability arising from premises operations, independent contractors, personal injury, products, and completed operations and liability assumed under an insured contract, including but not limited to the activities of Tenant, its employees and agents. Certificates or copies of said policies, including Landlord as an additional insured, and providing for thirty (30) days' advance notice to the Landlord before cancellation, shall be delivered to the Landlord no later than the date that Tenant begins to occupy the leased premises. A renewal certificate shall be provided to Landlord prior to expiration of any policy. (c) Tenant will not do or omit the doing of any act which would vitiate any insurance, or increase the insurance rates in force upon the real estate improvements on the premises or upon any personal property of the Tenant upon which the Landlord by law or by the terms of this Lease, has or shall have a lien. (d) Tenant further agrees to comply with recommendations of Iowa Insurance Services Office and to be liable for and to promptly pay, as if current rental, any increase in insurance rates on said premises and on the building of which said premises are a part, due to increased risks or hazards resulting from Tenant's use of the premises otherwise than as herein contemplated and agreed. (f) INSURANCE PROCEEDS. Landlord shall settle and adjust any claim against any insurance company under its said policies of insurance for the premises, and said insurance monies shall be paid to and held by the Landlord to be used in payment for cost of repairs or restoration of damaged building, if the destruction is only partial. 12. INDEMNITY. Except as to any negligence of the Landlord or its agents in the performance of any obligation of Landlord under this Lease, and to the extent not covered by insurance maintained by Landlord or Tenant, Tenant will protect, indemnify, and save harmless the Landlord from and against any and all loss, costs, damage, and expenses of any kind whatsoever, including but not limited to attorneys' fees and expenses, occasioned by, or arising out of, any accident or other occurrence causing or inflicting injury and/or damage to any person or property, happening or done in, upon, or about the leased premises, or due directly or indirectly to the tenancy, use, or occupancy thereof, or any part thereof by the Tenant or any person claiming through or under the Tenant, including but not limited to suppliers and patrons or Tenant or persons who suffer injury, loss, or damage directly or indirectly by the acts or omissions of such persons. Prior to the commencement date of this Lease, Tenant has occupied the premises as a tenant and has had the opportunity to test the premises for toxic or hazardous substances, mold, and other environmental matters, and Tenant agrees that the indemnities set forth in this paragraph shall include but not be limited to any claims, demands, losses, or causes of action arising from or relating to such matters. The provisions of this paragraph shall survive the expiration, abandonment, or termination of this Lease. 13. FIRE AND CASUALTY. (a) PARTIAL DESTRUCTION OF PREMISES. In the event of a partial destruction or damage of the leased premises which causes a business interference by preventing the conduct of a normal business operation, and which damage is reasonably repairable within thirty (30) days after its occurrence, this Lease shall not terminate but the rent for the leased premises shall abate during the time of such business interference. (b) ZONING. If the zoning ordinance of the municipality in which this property is located makes it impossible for Tenant, using diligent and timely effort, to obtain necessary permits and to repair and/or rebuild so that Tenant is able to conduct its business on these premises, then such partial destruction shall be treated as a total destruction as in the next paragraph provided. (c) TOTAL DESTRUCTION OF BUSINESS USE. In the event of a destruction or damage of the leased premises, including the parking area (if a parking area is a part of the subject matter of this Lease), so that Tenant is not able to conduct its business on the premises, and which damages cannot be repaired within thirty (30) days, this Lease may be terminated at the option of either the Landlord or Tenant. Such termination in such event shall be effected by written notice of one party to the other, within twenty (20) days after such destruction. Tenant shall surrender possession within ten (10) days after such notice issues and, each party shall be released from all future obligations hereunder, Tenant paying rental and triple net charges pro rata only to the date of such destruction. In 3 (b) Landlord shall have the right to maintain in the windows or on the building or on the premises either or both a "For Rent" or "For Sale" sign and Tenant will permit, at such time, prospective tenants or buyers to enter and examine the premises. 18. MECHANIC'S LIENS. Neither the Tenant nor anyone claiming by, through, or under the Tenant, shall have the right to file or place any mechanic's lien or other lien of any kind or character whatsoever upon said premises or upon any building or improvement thereon, or upon the leasehold interest of the Tenant therein, and notice is hereby given that no contractor, subcontractor, or anyone else who may furnish any material, service, or labor for any building, improvements, alteration, repairs or any part thereof, shall at any time be or become entitled to any lien thereon, and for the further security of the Landlord, the Tenant covenants and agrees to give actual notice thereof in advance to any and all contractors and subcontractors who may furnish or agree to furnish any such material, service, or labor. 19. LANDLORD'S LIEN AND SECURITY INTEREST. Said Landlord shall have, in addition to the lien given by law, a security interest as provided by the Uniform Commercial Code as codified in the State of Iowa upon all personal property, and all substitutions, replacements, accessories, and accessions thereto and thereof, kept and used on the leased premises by Tenant. Landlord may proceed at law or in equity with any remedy provided by law or by this Lease for the recovery of rent or for termination of this Lease because of Tenant's default in its performance. 20. SUBSTITUTION OF EQUIPMENT, MERCHANDISE. ETC. The Tenant shall have the right, from time to time during the term of this Lease or renewal thereof, to sell or otherwise dispose of any personal property of the Tenant situated on the leased premises, when in the judgment of the Tenant it shall have become obsolete, outworn, or unnecessary in connection with the operation of Tenant's business on the leased premises; provided, however, that the Tenant shall, in such instance and at its own expense, substitute for such items of personal property so sold or otherwise disposed of, a new or other item in substitution thereof, in like or greater value and adopted to the affixed operation of the business upon the leased premises (unless no substituted article or item is necessary). 21. RIGHTS CUMULATIVE. The various rights, powers, options, elections, and remedies of either party as provided in this Lease shall be construed as cumulative and no one of them as exclusive of the others or exclusive of any rights, remedies, or priorities allowed either party by law, and shall in no way affect or impair the right of either party to pursue any other equitable or legal remedy to which either party may be entitled as long as any default remains in any way unremedied, unsatisfied, or undischarged. 22. NOTICES AND DEMANDS. Notices as provided for in this Lease shall be given to the respective parties hereto at the respective addresses designated on page one of this Lease unless either party notifies the other, in writing, of a different address. Without prejudice to any other method of notifying a party in writing or making a demand or other communication, such message shall be considered given under the terms of this Lease when sent, addressed as above designated, postage prepaid, by registered or certified mail, return receipt requested, by the United States mail and so deposited in a United States mail box. 23. BINDING EFFECT. Each and every covenant and agreement herein contained shall extend to and be binding upon the respective heirs, personal representatives, successors, and assigns of the parties hereto; except that if any part of this Lease is held in joint tenancy, the successor in interest shall be the surviving joint tenant. 24. CHANGES TO BE IN WRITING. None of the covenants, provisions, terms, or conditions of this Lease to be kept or performed by Landlord or Tenant shall be in any manner modified, waived, or abandoned, except by a written instrument duly signed by the parties and delivered to the Landlord and Tenant. This Lease contains the entire agreement of the parties and supersedes any and all discussions, negotiations, understandings, or agreements pertaining to the subject matter hereof. 25. CONSTRUCTION. Words and phrases herein, including acknowledgment hereof, shall be construed as in the singular or plural number, and as masculine, feminine, or neuter, according to the context. 26. OTHER. (a) Notwithstanding any terms of this Lease to the contrary, Tenant shall be responsible for all cost and expense of repair, upkeep, maintenance, and restoration of the leased premises. Landlord shall have no responsibility to incur any cost or expense with respect to the leased premises. (b) This Lease is subject to approval by the Waterloo City Council. 5 Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA COMMUNITY PLANNING AND DEVELOPMENT 715 Mulberry Street • Waterloo, Iowa 50703-5783 • (319) 291-4366 Fax (319) 291-4262 NOEL C. ANDERSON, Community Planning & Development Director Council Communication City Council Meeting: November 14, 2011 Prepared: November 10, 2011 Dept. Head Signature: Noel Anderson, Community Planning & Development Director # of Attachments: 1 SUBJECT: Resolution approving a request by Howard L. Allen Investments, Inc. for a Minor Site Plan Amendment to the "S-1" Shopping Center Commercial District and an alteration of the parking requirements for the property generally described as being east of 2825 Crossroads Boulevard, to allow for the development of a retail strip center with a 71 stall parking lot, approximately 13 stalls less than the approximate 84 stall required. Submitted by: Noel Anderson, Community Planning & Development Director Recommended City Council Action: Adopt a resolution without a hearing to approve the parking numbers as noted. Summary Statement: The City Council previously approved the site plan for this development. Now that further details have come in for the uses of the building, the action for the parking variation numbers is necessary for approval of the detailed site plan. Staff has visited and gathered details on further sites, multi -tenant buildings, which contain similar uses and believe the 71 stalls as shown is sufficient to serve the site. Other similar sites had fewer spaces and had not encountered parking congestion or problems. Expenditure Required: none Source of Funds: NA Policy Issue: Economic Development in the City of Waterloo Alternative: Hold a pubic hearing on the request Background Information: At the June 7, 2011 meeting of the City of Waterloo Planning, Programming, and Zoning Commission, the request by Howard L. Allen Investments, inc. was reviewed and recommended for approval for a site plan amendment to the "5-1" Shopping center District for the construction of a new 10,600 sq. ft. retail shopping center strip mall. This new development would be built just east of 2825 Crossroads Boulevards (Pizza Hut) and between that site and the Advanced Auto strip center. The "S-1" Shopping center District requires all new major projects to be approved for site plan approval through a public hearing process. This request is also linked with another CITY WEBSITE: www.ci.waterloo.ia.us WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer item on the agenda for an easement vacate of a "no -build" area associated with this project. Previously the City of Waterloo sold some excess land along San Marnan to encourage further building in this area. The applicant is requesting to vacate that "no - build" area to allow for a greater area for development. The vacate of the "no -build" would allow for the 25' setback from the northern boundary, instead of a 50' setback. The attached site plan would represent continued development of the Crossroads Shopping Center area. Since the sale of excess right-of-way in this area, the Goodyear, Country Kitchen, and former Hardees site have been demolished. The new Advanced Auto store was built, and now this strip center will be built — essentially combining three former sites into two larger sites. The site plan shows a new 10,600 sq. ft. building with the potential of 4 tenants. The submitted site plan, as shown, would appear to meet all applicable zoning regulations. The building exterior would be similar to other commercial facades in the area. The site access would remain relatively the same, with a slight change in the curb -cut to match the median cut on Crossroads Boulevard. The plan shows a total parking of 63 stalls, which would appear to meet regulations for parking needed — subject to certain types of tenants (as retail and restaurants have slightly different tenant requirements). The "S-1" Shopping center District has the goal of providing a "concentrated grouping of sites and compatible uses with various facilities designed to be used in common such as ingress and egress roads, extensive parking accommodations, etc.". Furthermore, the ordinance gives the City Council the ability to "modify, alter, adjust, or amend the plan as deemed necessary to presence the intent and purpose of this ordinance? The "S-1" classification requires a public hearing be held for changes of a significant magnitude. The new 10,600 sq. ft. building qualifies as a major change. The "S-1" Shopping Center District, by its very design, allows for "variances" to the normal standards of the Zoning Ordinance to promote a cohesive, shared component district. This action will help to continue to bring new development to the area. cc: Aric Schroeder, City Planner Path: K:\USERS\NOEL-A\noel stuff\COUNCIL\Site Plans\CC 1411 Flammang.Stminor.doc 209.82' 10 -0" 160'-0" 39.82' muNI A V\ IEN4rt B 2600 5F \VA 3500s \ mlwi c \ TENANT o AAAA MBS \. 2500 SF \‘.5 \ PATIO AREA PATIO AREA PATIO AREA LANDSCAPE'.: AREA L f CAPE i i 71 PARKING STALLS anosw`i% i I Scale: ®LOCATION MAP N Scale: NTS Printable Map Output Page 1 of 1 Black Hawk Coun Parcel Ma• Parcel ID: Deed Holder: Le • al: 8813-02-377-006 LLEN,HOWARD L INVESTMENTS INC tP:: • AND • NTH 1/ T: :1 • s Pert mpnw / Railroads / wmtapa • Sections Water Parcala rA�/ NOL4N.Way U Township • City Lines raumad_dim roaddlm wawmamo_ pnooldlm roadname_ zonlne 0,5 eat pal c -m 04 • MPC ▪ PC.2 xom 04 < cE 04A I RP Aortal Photos eluk ewk Co. Black Hawk County, Iowa 316 East 5th Street aterloo, Iowa 50703-4774 Phone: (319) 833-3002 Fax: (319) 833-3070 E-mail: auditor a co.black-hawk.ia.us.or 14,1 ap.uaalail with i{+ciM3. Cap Map Disclaimer: This map does no represent a survey. No liability is assumed for the accuracy of the data delineated herein, either expressed or implied by Black Hawk County, the Black Hawk County Assessor o their employees. This map is compiled from official records, Including plats, surveys, recorded deeds, and contracts, and only contains information required for local government purposes. See the recorded documents for more detailed lea al information. http://www2.co.black-hawk.ia.us/servlet/com.esri. esrimap.Esrimap?ServiceName=bhov... 11/10/2011 APPLICATION SITE PLAN AMENDMENT TO A "R -P", "M -P", "C -P", "B -P", "S-1" OR "C -Z" DISTRICT CITY OF WATERLOO PLANNING, PROGRAMMING, AND ZONING COMMISSION, WATERLOO, IOWA 319.291.4366 New or Overall Amendment 1L Individual Building Minor change (check one) (Minor Change must be approved by start) 1. APPLICATION INFORMATION: r //^�, a. Applicant's name (please print): /-40Wa-Vci 1.• It vis-! rvunL Int. Address:? �p (per _ Phone: '(��j (,Q %- , QFax Cityt CPr (1W 5 State: /A Zip: O(01 b. Status of applicant: (a) Owner 1( (b) Other (CHECK ONE): If other explain: c. Property owner's name if different than above (please print): ,i%' - Address: Phone: City: State: 2. PROPERTY INFORMATION: a. General location of site plan to be amended: Zt7 ✓ 07C 2.52s G/2ej Q /24.4ps /az up Fax: Zip: b. Legal description of property or portion to be amended: S$,e F}794Ci,4 c. Dimensions of proposed site plan amendment: ZG / >C 25—o d. Area of proposed site plan amendment: L 2c) {4ertr- e. Current zoning: S— 1 f Reason(s) for site plan amendment and proposed use(s) of property: /1,)& /ZpT /C (&)7• /Z g. Conditions (if any) agreed to (does not affect existing conditions unless specified): h. Other pertinent information (use reverse side if necessary): Please Note: If applicant is not the owner of the property, the signature of the owner must be secured. If it is the intent to subdivide (split) any land, vacant or improved in conjunction with this request it must go through a platting process (separate from site plan amendment request). The filing fee of $200 (for new or overall amendment), $100 (for individual Building), or $0 (for minor change) (payable to the City of Waterloo) is required. This fee is non-refundable. Under no condition shall said sum or any part thereof be refunded for failure of said amendment to be enacted into law. Any major change in any of the information given will require that the request go back through the process, with a new filing fee. If the request is denied no new petition covering the same or portion of the same property shall be filed with or considered by the Planning, Programming, and Zoning Commission until four (4) months have elapsed from the date of denial by the Waterloo City Council. The undersigned certify under oath and under the penalties of perjury that all information on this request and submitted along with it is true and correct. All information submitted will be used by the Waterloo Planning, Programming, and Zoning Commission and the Waterloo City Council in making their decision. The undersigned authorize City Zoning Officials to enter the property in question in regards to the request. Signature Applica t Date Signature of Owner Date 54" 10'•0" NEW FACILITY FOR CROSSROADS RETAIL CENTER a 9 WATERLOO, IA 209.52' LAVA AREA 35'•0" 1 1RIR / 401.0"' !! J/. ;.TENANT/ //. No.1 / / 3200 sf ! , //// //, 1 nstlINS ZONE 40•4"/"/ ////// TENANT/ / No.3 / /2400sfff FUT. EXT, PATIO PLANTS / \\ / f40.•p.. / /TENANT,/ No.3 2400 sf L L /40.•0.'/ / TENANT - No.4 / 5.1 TRASH ENCLOSURE CROSSROADS BLVD* 3 rt. �Ysuiioeeas MAY 2, 2011 SITE CONCEPT #'1 SCALE: 1" 40,44 53 PARKING STALLS REQUIRED NORTH 63 STALLS PROVIDED East of 2825 Crossroads Blvd — Plat Map IkE-NW-SE / " CROSSROADS PLAT N0. 7 M1111111111111=111 0_1 441111Mi.. E of 2825 Crossroads Blvd - Request for Site Plan Amendment in the S-1 Shopping Center District Site Plan Amendment for Proposed 4 -Tenant Retail Shopping Center A PARCEL OF LAND LOC IN THE E 1/2 SEC 2 T 88 R 13 DESC AS FOL COM AT THE INTERS OF SELY R-O-W LINE SAN MARNAN DR AND THE SWLY ROW LINE OF SEARS ST TH S 41 DEG 24 MIN E ALONG SWLY ROW LINE OF SEARS ST 194.51 FT TH SLY ALONG A CURVE CONCAVE WLY HAVING A RADIUS OF 20 FT A DIST OF 31.42 FT TO NWLY ROW LINE OF CROSSROADS BD TH S 48 DEG 36 MIN W ALONG NWLY ROW UNE OF CROSSROADS BD 220 FT TO THE PT OF BEG TH N 41 DEG 24 MIN W 250 FT TH S 48 DEG 36 MIN W 209.82 FT TH S 41 DEG 24 MIN E 250 FT TH N 48 DEG 36 MIN E ALONG NWLY ROW LINE CROSSROADS BD 209.82 FT TO PT OF BEG • ' EXHIBJT ••• ; .. A patter 'of .1 and located in the East Hall' of Section ho. •2. Township No . 14-orth; Range -NO. 13 West of. the Fifth, Principal Meridian,. in -the. • City. of Waterloo, Black HoWk County-,: Iowa., described as follows; • :•;.• Commencing . at the intersection of the Southeasterly right. :.of : • of :East San tlarnafl Drive .a,ncf the Southweiterlyright of way . Of Sears Street, thence South 41 •. degrees. 24 minutes 00 seconds East along the Southwesterly right.of way line of :Sears'. Street a . distance "of 194 5j feet; • thence Southerly along : a curve concave .Westerl'y having ..a • radius: Of . : 20 00 feet a .distance ..tif 81.42 feet to. the • Northwesterly right. Of. way. t" line of Ctossrdedi.. Boulevard, .•thence South 48 • degrees. 36 minutes 00 . secon.ds: West .along the Northwesterly : right • of way line. of "CrosStdadS.:. • • •-• Bobleyard a distance . of 220;00 . feet to the • point of, beginning; • then -Co:- '• • NOrth 41 .•-ciedr-oea: .24 minutes 00 seCOndS. West a. distance of • 256.00 •; South 48 degrees t:36 ininutes 00 •-seconds • es.t a • distance :of 209 82£feeti: 'thenbetSouth- 41 degrees 24 24 :minuteS 00 seconds: -East a distance of 250,09 Tett; ...thence North 48 degrees' 36 'minutes 00 seconds East "al eing.•the. t•• .NOrthwesterly :right or way line of Crossroads Boulevard a, distance of . • .209..82 feet to the •:0.6 -int of beginning?, • NOTE: ' The Southwesterly right of way -Pine of Sears Street is assumed to • - bear South 41 degrees .24 Minutes 00 seconds East.. , • • • . : . • . Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES Ward 1 CAROLYN COLE Ward 2 HAROLD GETTY Ward 3 QUENTIN M. HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMITT At -Large CITY OF WATERLOO, IOWA CITY CLERK AND FINANCE DEPARTMENT 715 Mulberry Street • Waterloo, IA 50703 • (319) 291-4323 Fax (319) 291-4571 SUZY SCHARES • City Clerk MICHELLE WEIDNER, CPA • Chief Financial Officer Council Communication City Council Meeting: Prepared: Dept. Head Signature: Number of Attachments: November 14, 2011 November 9, 2011 Hotel/Motel Discretionary Funding Committee None SUBJECT: Hotel/Motel Discretionary Grant Transfer Submitted by: Michelle Weidner, CFO Recommended Action: Approve the transfer of the remaining balance of $5,000 of the hotel/motel discretionary grant previously awarded August 2, 2010 to Main Street for marketing the Public Market to Leisure Services. It was determined this week that updated banners are needed for the interior of the Public Market. Since the banners will remain City property, the purchase will be made by Leisure Services. Expenditure Required: Source of Funds: Policy Issue: Alternative: Background Information: N/A No additional Hotel/Motel Discretionary Fund N/A N/A CITY WEB SITE: www.cityofwaterlooiowa.com WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer CITY OF WATERLOO Council Communication City Council Meeting: November 14, 2011 Prepared: November 7, Dept. Head Signature: (.../Ol 4 � e ,,Cfr # of Attachments: 1 SUBJECT: CAT/Vision Iowa Grant Proposal submission Submitted by: Cammie Scully Recommended City Council Action: Authorization to submit attached grant proposal to the Vision Iowa/CAT program. Summary Statement Requesting permission of the Mayor and the City Council to authorize the submission of a Community Attraction and Tourism Program Marketing Grant through the Vision Iowa program. Expenditure Required $30,119 Source of Funds Background Information: $15,000 - CAT/Vision Iowa Grant request $6,619 - Community Foundation of NE Iowa Expendable Fund $5,000 - Hotel -Motel Tax Grant (26-HMT-YPV4) $3,500 - Phelps Youth Pavilion marketing/advertising The Community Attraction and Tourism program (CAT) is designed to assist communities in the development and creation of multiple purpose attraction or tourism facilities. This program can help position a community to take advantage of economic development opportunities in tourism, and strengthen a community's competitiveness as a place to work and live. We are eligible to apply for this grant because the Phelps Youth Pavilion has received previous financial assistance from the Vision Iowa/CAT program. Return Completed Application to: Vision Iowa Program Manager Iowa Department of Economic Development 200 East Grand Avenue, Des Moines, Iowa 50309-1819 515.725.3197 (phone) 515.725.3010 (fax) a laina.santizo(u,iowa.gov PART I Applicant & Project Information Organization (must be a Vision Iowa Recipient): Waterloo Center for the Art Contact Person: Shannon Farlow Title: Development/Marketing Director Address: 225 Commerical Street City: Waterloo State: IA Zip Code: 50613 Telephone: 319-291-4490 FAX: 319-291-4270 E-mail shannon.farlowtwaterloo-ia.org Project website (required): www.phelpsyouthpavilion.org Total Advertising Placement Cost: $30,1 19 Amount Requested (cannot exceed 50% of total or $15,000): $15,000 Local Match Amount: $15,119 Source of Local Match (cannot be state funding): City of Waterloo Hotel -Motel, Phelps Youth Pavilion budget Description of Advertising Project: The Waterloo Center for the Arts' mission is to work in partnership with the community to build a stronger appreciation for the arts and providing cultural experiences for people of all ages, and the Phelps Youth Pavilion is at the core of accomplishing this purpose. The Pavilion is a hands-on children's museum that has brought thousands of visitors to the revitalized downtown Waterloo to learn, play and explore, and has been a local, regional and statewide attraction since opening in April 2008. This project will engage those who have never experienced the Pavilion and to remind those who have, but maybe forgot how much fun they had. This campaign will inspire visitors from across Eastern Iowa, helping the Pavilion surpass its 100,000th visitors milestone! When was financial assistance received from Vision Iowa/CAT? $500,000 How much was received from Vision Iowa/CAT? $500,000 Vision Iowa/CAT/RECAT Contract #: 3 PART II Advertising Project Description Eligible advertising: Print media (newspaper and magazines) — Please include the name and location of the print medium, specific insertion dates of the ad (do not clump insertion dates such as Feb -April), and size of ad. Radio — List the name and location of the radio station, the air dates (do not clump insertion dates in to months such as Feb -April), and the length as well as the frequency. (If exact dates/times of radio buys are not confirmed, please include a tentative schedule.) Television — Include the name of the station, location, dates ad will run (do not clump insertion dates into months such as Feb -April), and length of ad. (If exact dates/times of television buys are not confirmed, please include a tentative schedule.) Online/new media advertising — List the vendor's Web site and/or the new media that will be used and the dates the ad will appear. 1. Describe what advertising you will place, from the above list, and what Vision Iowa/CAT project your advertising will promote. Please be specific when you describe the proposed advertisements, the media outlets that will be used, and time frame. If you anticpate needing some flexibility in these plans, please explain. PLEASE NOTE: awards will be made contingent on the ads crediting the Vision Iowa Program for the cooperative effort. (5 points) a. Attach a copy or mock up of the ad (for print and online ads) or ad copy/script (for broadcast). This project will promote the Phelps Youth Pavilion, an interactive children's museum that opened in early 2008 thanks in part to the support of the Vision Iowa Program. The Pavilion was a 39,000 square -foot addition to the Waterloo Center for the Arts and has had over 98,587 visitors since opening its doors (we look forward to welcoming our 100th visitor in November or December 20111). Among the 40 interactive exhibits are a tractor where visitors can virtually drive through a Grant Wood painting, a life-size cow that can be milked, a Tap -Tap taxi that gives visitors the experience of riding the bumpy streets of Haiti, a time machine that takes visitors to prehistoric times, a special area for infants and toddlers, and many additional unique hands-on exhibits. The Pavilion is a self-directed environment that truly encourages the exploration of art, culture and creative learning. Visitors from across the nation have experienced the Pavilion, representing 40+ states and 15 countries. The Pavilion offers daily admission, memberships, birthday parties, school tours, group tours, private rentals, and monthly discounted Dollar Days and special programming. It works in tandem and creates wonderful synergy with the many other programs and events at the Waterloo Center for the Arts. The Pavilion has earned statewide attention with 3 prestigious awards in 2009: Attraction of the Year from the Waterloo and Cedar Falls Tourism Bureaus, Tourism and Arts Award from the Iowa Department of Tourism, and also the Best Art Class designation from Nickelodeon. The Waterloo Center for the Arts is an economic engine for tourism, education, and quality of life in the Cedar Valley community, and the Phelps Youth Pavilion has been a big part of that. The Phelps Youth Pavilion will use online, print, television, and radio advertising to reach its family audience. Below outlines the strategy for each vendor, location, and ad run dates; and attached are sample print ads and scripts (attachments #1-2). 4 rnelps rourn ravuion 1Z1.11Z vision Iowa uranr Medla!Vendor „° ,Amount Attachment Schedule � , Description s; Online/DigitahMedia Facebook.com $ 2,000 3 Feb. - Dec. 2012 Facebook is part of millions of people's every day life, so this is a great way to connect with real people with real interests in what we have to offer. Ads on facebook can change often and will be personally appealing and relevant to our target audience: typically females, age 22 and older who live in Iowa. The estimated reach with these specific demographics is 652,140. We will purchase this advertising based on a per -click -through rate, meaning that we will pay for our ad each time that a potential visitor clicks on our ad (the ad will be linked to www.phelpsyouthpavilion.org or a specific page within our site, depending on the specific ad). This is also a great way to track the ad's effectiveness and provides a platform to make rapid changes to continually capture potential visitors' interest. Greater Cedar Valley Chamber of Commerce Cedar Valley $ 350 4 May 10 & 17, 2012 The Chamber's EXTRA newsletter is highly visible e -newsletter sent to more than 1,800 Chamber member employees on a weekly basis. It tells of upcoming events and news of particular interest to the business community. We can submit a 50 -word paragraph promoting the Pavilion or one of our events, and this advertisement will run 2 times. Company web site will be included on the ad and click through tracking will be provided. easterniowatourism.org $ 750 5 Jan. 1 - Dec. 31, 2012 The Eastern Iowa Tourism Association (EITA) works to create a thriving economic environment in Eastern Iowa by promoting our region as a principal destination for potential visitors and by serving as a catalyst to enhance our members' tourism marketing efforts. Their website is the traveler's tool for destination information in Eastern Iowa. Prospective travelers can search member attractions, events, destinations, lodging and restaurants by community. Our EITA Rotating banner ad will be displayed in an equal rotation. The ads are 212 pixels wide X 120 pixels tall and include a link to our website. In 2011 (through October 31) we have received 54 referring site visits through this ad, with 98.15% of these visits from first-time website visitors. Lamar Advertising $ 2,200 6 July 1-7, November 1-30 Lamar now offers digital posters, reaching over 10,000 consumers every day; our ad would penetrate the market with 69 spots per hour, 1665 spots per day, 49,950 spots per month. We would do a 1 -week campaign in July, around the 4th of July holiday, and a 1 -month campaign in December to reach the many shopping -minded consumers. Print media The Iowan $ 801 7 Iowa Heritage Tourism Guide - May/June 2011 Destination Trails - March/April 2011 The Iowan reaches over 70,000 people (20,500 Iowan subscribers and newsstand buyers, plus pass -along readers AND a targeted mailing of the guide alone to members and friends of historical societies) — all potential customers for our attraction. These publications are also featured on The Iowan website, reaching even more of our potential visitors. - The Iowa Heritage Tourism Guide will reach a targeted audience enthusiastic about heritage tourism with its full-color special section featuring a graphic locator map highlighting all participating attractions. Ad size: 1/6 page - Destination Trails is a special section in the The Iowan promoting travel and tourism in Iowa. Thousands of separate overruns of this publication are printed and distributed at the Iowa State Fair, 1,000 tour directors around the Midwest, to advertisers, and at other special Iowa events. Ad size: 1/6 page Customized Newspaper Advertising $ 1,870 8&9 March— 1st week June — 2nd week July — 2nd week August — 2nd week November — 1st week When advertising with the Customized Newspaper Advertising, they coordinate and distribute the ads, allowing the Pavilion to penetrate the Northeast Iowa region with great economies of scale. Coupon ads (ie - $1 off admission) will be placed in 45 newspapers and 8 Shoppers throughout Northeast Iowa (ad size: 3.792"x2"). A list of these publications is attached to the quote from this vendor. The day of publication varies by newspaper, but in general each ad will be inserted during the week listed on our schedule to the left. rnerps rourn ravmon I Lure vrsrorr Iowa (arum MedialVendo Amount ,Attachment Schedule Description myvacationland.com Magazine $ 750 10 Publication May & Sept. Online ad - June - Nov. Email Blast - May Through the Dubuque Telegraph -Herald's summer and fall myvacationland.com Magazine publications, the Pavilion will be marketed to a regional audience who is interested in finding vacation destinations. In May, the Pavilion will place a %. page ad in this publication, and in September, the Pavilion will place a 1/8 -page ad. 34,000 copies of each issue are distributed. We will also utilize a 6 -month banner ad online at myvacationland.com June through November, and an email blast to 5,000 potential visitors in May. The Courier Radio. $ 4,065 11 Holiday Hysteria - Nov 4, Dec. 9 Design an Ad - February Partners in Education - April Chamber Directory - April Total Dominance - Nov. 23 .; The Courier newspaper produces and distributes a variety of special publications that give the Pavilion an opportunity to directly align itself with and target potential visitors. The following publications will effectively put the Phelps Youth Pavilion's brand in front of its target audience in the Cedar Valley (Waterloo/Cedar Falls) area. - The Holiday Hysteria promotion gives us two 1/2 page ads in a Sunday edition of the newspaper, the most read daily paper in the Cedar Valley area. We will utilize this dedicated audience to promote our happenings, upcoming events, membership to its local and regional audience. Ad size: Y� page - The Design an Ad tabloid is intended to teach students about newspaper advertising and to help them become more critical consumers. Students are encouraged to get their creative juices flowing, combining color, catchy phrases and original artwork for a business that they are matched with. This program directly aligns with the Pavilion's goal of promoting arts and creativity. Ad size: %n -page, designed by a local student - The Partners in Education tabloid showcases the partnerships between local businesses and schools. The Waterloo Center for the Arts and Phelps Youth Pavilion are dedicated at -large partners to this program, and promoting itself to schools is a perfect fit with the Pavilion's school field trip program. Ad size: 1/8 -page - The Greater Cedar Valley Chamber of Commerce Directory is a great business resource for the community with a yearlong shelf life. Because the Pavilion is a great destination for tours, employee teambuilding and special outings for businesses and civic groups, this publication is offers great placement. Ad size: 3.677'5(4.83" - The Total Dominance package takes over the wcfcourier.com homepage for an entire day - gives us a wallpaper ad, pencil ad, and big ad on the homepage for an entire day, plus a full color strip ad in the printed version of The Courier. - „,�. Mix 93.5 FM $ 3,600 12 Feb. 14-27 I March 7-20 May 16-29 I June 6-19 July 1-14 I August 1-14 Oct. 10-23 1 Nov. 14-27 December 18-31 Local radio advertising on Mix 93.5 FM will establish the Pavilion as a top of mind destination. The Pavilion will also have the opportunity to do three Morning Show interviews to draw even more attention and promote what's new at the Pavilion. Mix 93.5 FM Radio will run 50 sixty-second commercials per week during the proposed schedule. Ad details: :60 -second commercials will run 50 times per week in Waterloo, Cedar Falls and surrounding area. Schedule and placement is tentative. Television .tit.. .. Cedar Falls Utilities $ 2,400 13 February — August and December :30 -second ads will run on CFU Cable on the following networks 20 times/per month, plus auto fill: TLC, Nickelodeon, Cartoon, Bravo, Lifetime, Lifetime Movies, Discovery, Food, Travel, History, HG -TV, Fox, A&E, ESPN and TBS. Ads would run Monday through Sunday 6am —12am in the Cedar Falls market. Schedule and placement is tentative. ruaipa 7 wui rev:null 1 CU is VNIVO veva v7aui Amount .Attachment :30 -second ads will run on Mediacom Cable on the following networks: ABC Family, Nickelodeon, Cartoon Network, and TLC in Waterloo, Cedar Falls, Cedar Rapids and Dubuque. Schedule and placement is tentative. Mediacom $ 5,200 14 Feb. 14-27 I March 7-20 April 4-17 I May 16-29 June 6-19 I July 1-14 August 1-14 1 Dec. 18-31 KWWL-TV $ 6,133 $130,1;19<<; 15 Feb. 14-27 I March 7-20 June 6-19 I July 1-14 December 18-31 :30 -second ads will run Monday through Friday during the KWWL-TV 6:OOam News, NBC Today Show, Dr. Phil, KWWL 6:OOpm News, and additional general.ROS, KWWL/NBC programming in the Waterloo and surrounding areas Schedule and placement is tentative. 2. Describe how this advertising relates to your overall marketing efforts and why you believe it will be successful. (5 points) Too often people take for granted the great venues and experiences they have in their own community, and the best way to attract people to the Waterloo Center for the Arts' Phelps Youth Pavilion is simply to have a presence wherever people are looking for information. This 2012 advertising campaign will focus on both the local Cedar Valley area (Waterloo, Cedar Falls and rural surrounding areas), plus an additional 120 mile radius, utilizing a variety of mediums to reach the most households throughout Eastern Iowa. This campaign will be successful because the Pavilion is an interactive, well -thought-out "product" where visitors will experience something new each time they visit. The newest exhibit in the Pavilion is a nine -hole mini golf course where each hole is based on a different 20`h century artist — each golf hole incorporates hazards based on the stylistic elements that the artist used in his/her work. (Plus where else can you play golf in the winter in Iowa?! This exhibit will be on display through August 2012.) These unique and creative exhibits keep visitors engaged and interested in coming back — and it is support from Vision Iowa that gives us an outlet to tell people about these exciting happenings! Each of the advertising mediums selected are meant to reinforce and remind people live so close to such an amazing facility for their kids and families to explore, and will also introduce those in the outlying communities to the Pavilion as a regional resource for a fun one -day or weekend trip. The Pavilion is an notable Iowa attraction because of its hands-on learning opportunities for infants through adults; it bridges the gap between generations as all ages can play and learn together; it is an affordable experience for families; and it offers 'something to do' close to home. Once people experience the Pavilion, they will want to return again and again, and it is the Pavilion's hope that this advertising campaign will inspire people to visit and the excitement they experience will encourage them to spread the word to others by word of mouth. a. Identify your target market for advertising and specifically identify the target market for the advertising that this grant would support. Indicate if this is a new target market or market expansion of a current target market for your organization. (10 points) The target market for this advertising plan is kids, families and specifically women, who tend to be a family's main decision -maker when it comes to travel and entertainment plans. All of the advertising plans focus on Eastern Iowa, including the Waterloo, Cedar Falls, Dubuque, Des Moines and rural Eastern Iowa markets. The Pavilion's approach is not a new target market, but we have expanded our reach into the online segment, giving us greater flexibility and a slightly different approach. The Pavilion hopes that focusing on potential visitors in Eastern Iowa (ie — within easy driving distance) will bring the highest return on the Pavilion's and Vision Iowa's investment. b. Include how the advertising will reach your target market and audience and how your marketing efforts will compliment your organization's regional and/or statewide advertising efforts. (10 points) The planned advertising campaign will reach the Pavilion's target market because of its diversity. In addition to the Pavilion, the Center promotes its classes, programs, workshops, events, performances, galleries, impressive collection of artwork, Gift Store, and Cafe with ongoing marketing efforts, so the Pavilion's campaign will enhance and compliment the overall message that the Center is promoting. Promotion of the Pavilion will also be inclusive with the internal traffic the Waterloo Center for the Arts has with its ongoing programs, events, classes, and room rentals. The Center's newsletters, class schedule mailers, press releases, feature stories, website updates, and advertising efforts all reflect and highlight the Phelps Youth Pavilion as an integral amenity at the Center. With over 400 local and regional media contacts that regularly receive Pavilion media information and over 5,500 individuals and businesses on the Center's mailing list, it is well-positioned to communicate its happenings with people throughout the Cedar Valley and Eastern Iowa, and this campaign will strengthen that position. The Pavilion also works closely with the local Waterloo and Cedar Falls Tourism Bureaus, and has done cooperative marketing with other local attractions such as Lost 8 Island Waterpark, Grout Museum, isle Casino and Hotel, and the local trails system. The Waterloo Center for the Arts also utilizes its partnerships with Silos and Smokestacks, the Eastern Iowa Tourism Association, the State of Iowa Tourism office, the Cedar Valley Cultural Alliance, the Iowa Museum Association (IMA), and the Iowa Welcome Centers to further its awareness and create excitement for its facility. By publicizing the Center's events, programs and classes with both local and regional media outlets through this campaign, the Center will draw visitors from outside the Cedar Valley to downtown Waterloo. The Phelps Youth Pavilion gives people a reason to experience the Waterloo Center for the Arts who might not otherwise, so ensuring potential visitors have eye- catching, enticing information at their fingertips is at the core of the Pavilion's advertising efforts. If a visitor comes to the Center to experience one of its permanent art galleries, it is the our hope that they might stop to each lunch at the ArtHouse Cafe, browse through the Gift Store, notice the Phelps Youth Pavilion and decide they want to bring their kids or grandkids back to play; and before leaving, they'll pick up a schedule of our upcoming classes and programs. There is great synergy and excitement at the Waterloo Center for the Arts because of the Phelps Youth Pavilion, and keeping it top of mind is key to sustaining that level of interest! i. Describe why and how you selected the medium to use. The mediums selected for this campaign will increase our branding efforts with the ever-growing online population, while still staying so true to traditional mediums where we can reach a wide range of households, build top -of -mind awareness through repetition, and reach potential visitors in a variety of different ways. Combining multiple mediums has been very effective over the past several years, branding us with a footprint of greater impact throughout Eastern Iowa. Studies show that a person forgets 75% of what he or she has learned in the previous week. After three weeks, we forget 90%. After four weeks, we forget 95%. Taking into consideration these facts, repetition and timing of the advertising were both taken into consideration when developing this plan. More concentrated advertising efforts will take place during Spring Break, the summer months when families are looking for things to do, and during the holiday season. Targeting people who will are already looking for things to do during those typical leisure times gives the Pavilion more "bang for its buck" because people are more apt to be on the lookout for advertised opportunities. The Pavilion is using a very targeted approach in its media selection process. The Courier is the leading print source of news and entertainment in the Waterloo/Cedar Falls and surrounding area. Their special publications present the opportunity to directly target a natural audience base that those publications have already established, both in the printed version that is distributed through the newspaper and in the online version that is posted to their website (www.wcfcouriercom). Lamar Advertising now offers digital posters, reaching over 10,000 consumers every day; our ad will penetrate the market with 69 spots per hour, 1665 spots per day, 49,950 spots per month. This medium is active; it catches the consumer's attention while they're waiting in traffic. The Customized Newspaper Advertising has been a successful way for the Pavilion to reach over 770,000 Eastern Iowa residents through one simple placement. Many of their publications are distributed in smaller communities with a loyal reader base, which provides a great audience. To give people across the state a peek at the Pavilion and to encourage tourism to the Waterloo area, The Iowan magazine will reach over 70,000 people throughout the state. Having an online marketing presence is becoming crucial to reaching our busy target market. The use of sites like facebook.com, the Greater Cedar Valley Chamber of Commerce email EXTRA, and easterniowatourism.org will keep the Pavilion's brand in front of our tech-savy market, while providing extrememly valuable tracking information for our organziation. The myvacationland.com publication is the best -read special section that the Dubuque Telegraph -Herald produces, and has a targeted distribution to a potential customer base that is just 91 miles away from Waterloo. Mix 93.5 FM's listening demographic is the 9 perfect fit for the Pavilion. They are a local station that plays the best variety of the 70's, 80's, 90's and today's music, and is a top radio choice in the workplace. Seeing is believing and television can show what the Phelps Youth Pavilion is — which is the best way to show off our attraction! KWWL-TV offers a very tailored approach to reach a guaranteed audience during particular shows, and CFU and Mediacom Cable allows the Pavilion to reach an additional audience, with again a tailored approach in choosing specific cable stations to promote the Pavilion brand. ii. Explain the estimated number of people the advertising will reach. This advertising campaign has the potential to reach more than 2,569,026 people in Eastern Iowa. The Customized Newspaper Advertising reaches 777,388 readers in Northeast Iowa. The Courier's special publications that the Pavilion will be advertising in have a combine readership of over 325,000. Lamar's digital posters reach an average of 10,880 consumers daily, so with 25 total days of advertising with them, our ad would touch 380,800 consumers. The Dubuque - Telegraph Herald's myvacationland.com Magazine reaches 34,000 people in the regional market of Dubuque and its surrounding areas. KWWL-TV reaches 173,101 households in Eastern Iowa, including Waterloo, Cedar Falls, Cedar Rapids, Dubuque, Iowa City and surrounding communities. Cedar Falls Utilities Cable television reaches 11,200 (80%) in Cedar Falls. Mediacom Cable reaches 43,300 homes in Waterloo metro and outer markets, 48,300 in Cedar Rapids, and 26,700 homes in Dubuque. Facebook will target 523,160 people within our specified demographic, the Chamber EXTRA email will reach 1,800 email in - boxes each time, and the easterniowatoursim.org website receives 16,797 web visitors per year. (Tangible numbers were not available for Mix 93.5FM's reach.) 3. Describe how you will track and measure the effectiveness of your advertising; this information is required for your 60 day post -advertising report. (20 points) a. Examples of tracking might include the number of inquires received, web site user sessions, guest book signatures, attendance logs, etc. The Phelps Youth Pavilion will track and measure the effectiveness of its advertising through number of inquiries received, website traffic, visitor registry, daily admission numbers, and coupons redeemed. The Pavilion is also implementing a zip code tracker system that will give very concrete information of where visitors are coming from. The Pavilion's visitor's registry book gives visitors the opportunity to 'rank' their visit, give feedback, and tell how they heard about the Pavilion and Waterloo Center for the Arts. The Pavilion's admission and gallery staff also conduct informal surveys with visitors, again asking how they heard about the Pavilion and getting feedback on their experience. The effectiveness of the advertising will also be measured and referenced with any increases in participation levels of the Center's other classes, workshops, birthday parties, tours, and room rentals. Some of the printed advertising will also include discounted admission coupons. This tactic will give the patron a value-added benefit to remembering to mention where they heard about the Pavilion, and will certainly help the Pavilion track the success of its advertising placements. Additionally, website statistics and online 'click -through ads' are a great source to determine how effective the ad placements were, and will show the Pavilion's return on investment. The Pavilion's website statistics can report on the number of hits, length of the user's visit, user's geographical location, all on an hourly, daily, weekly, and monthly basis. Comparing website traffic with the Pavilion's advertising schedule will immediately speak to how the advertising is affecting awareness, interest, and eventual participation at the Phelps Youth Pavilion. The Pavilion also conducts periodic e -surveys of its visitors, provides a feedback link on its website, and has a guest book near its entrance that asks visitors to indicate where they are from and how they heard about the Pavilion. 10 b. Explain how you will fulfill requests for information generated by the advertising. The Waterloo Center for the Arts has a "Welcome to the Waterloo Center for the Arts/Phelps Youth Pavilion" package that is mailed or emailed (depending on the visitor's preference) to interested visitors. This package is a great overview and introduction to the Center for the Arts, and highlights the Phelps Youth Pavilion as one of the Center's main features. Once this information is distributed, the Center's Visitor Services Manager follows up with the inquiries to ensure they received the information and offers to provide assistance in planning their visit. The interested parties are also asked if they'd like to join our mailing lists (email and/or hard copy) to continue to build our relationship with them. 4. Provide attendance numbers for the last three years: Calendar year 2009: 24,552 Calendar year 2010: 24,484 Calendar year 2011 (through 9/30): 19,796 PART III Project Budget List placement cost(s) and the estimated amount for each vendor. Attach and number quoted estimates or bids for each item. Documented quotes should match the amount shown below. If they do not, please provide a clear explanation for the discrepency. Figures that cannot be matched to documentation can be considered grounds for disqualification of the entire application. In addition, if an award is made, these figures will be used to generate a contract with the State of Iowa. Add additional lines to the chart below as are not eligible MediaNendor Amount , Attachment # Facebook.com $ 2,000 3 Greater Cedar Valley Chamber of Commerce Cedar Valley $ 350 4 easterniowatourism.org $ 750 5 Lamar Advertising $ 2,200 6 The lowan $ 801 7 Customized Newspaper Advertising $ 1,870 8&9 myvacationland.com Magazine $ 750 10 The Courier $ 4,065 11 Mix 93.5 FM $ 3,600 12 Cedar Falls Utilities $ 2,400 13 Mediacom $ 5,200 14 KWWL-TV TOTAL $ 6,133 $ 30;119 15 List the source(s) of local match funds. Attach documentation of each funding source. Documentation should include a signed letter of committement or resolution. Matching funds must be cash. In-kind is not eligible match. Source Amount Attachment # Phelps Youth Pavilion budget $3,500 16 Community Foundation or Northeast Iowa Expendable Fund $6,619 16 Hotel -Motel Tax Grant $5,000 17 11 PART IV Attachments 1. Attach a copy or mock up of the ad, for print publications, or ad copy/script for broadcast (requested in PART II). —Attachment #1 & 2 2. Quoted estimate for placement costs (requested in PART III). —Attachment #3 -15 3. Documentation of Local Match (requested in PART III). —Attachment #16 & 17 4. If your organization has a marketing plan, please attach it. I acknowledge that I have read and understand the application materials and administrative rules. Further, I give permission to the Vision Iowa board or the Iowa Department of Economic Development (IDED) to perform due diligence for reasonable evaluation of this proposal. I understand that all information submitted relating to this application is a public record. I certify that all representations, warranties, or statements made or furnished in connection with this application are true and correct in all material respects. I understand that it is a criminal violation under Iowa law to engage in deception and knowingly make, or cause to be made, directly or indirectly, a false statement in writing for the purpose of procuring economic development assistance from a state agency or subdivision. Printed Name: _ Shanna> Fr'IOLiJ Signature: , 1 Dai e: 7 %(A/// 12 Phelps Youth Pavilion [Sample Radio and TV Commercials] �I [RADIO script] :60 second ad :60 second commercial 1 Spring Break Dollar Days Staying close to home for Spring Break? No problem — it's Dollar Days all week at the Phelps Youth Pavilion, March 10th through the 18'h. Admission is just $1 per person! The Pavilion is interactive fun for kids of all ages — even infants and toddlers! Become a Hollywood star on the FUNstage. Hop on a tractor and drive into a Grant Wood painting. Design & Build your dream house in the Construction Zone. And explore our newest exhibit: Mini Masters: A Nine Hole Course in Art., where you can learn about great artists like Monet and Pollock while having fun playing mini golf! $1 admission during Spring Break week at the Phelps Youth Pavilion, where ART launches a world of wonder, discovery and learning! We're open extended hours all week: Monday through Saturday: 9am to 5pm and Sunday 1 to 5pm. Visit phelpsyouthpavilion.orq for details! All children must be accompanied by an adult. Supported by the Vision Iowa Program and the RJ McElroy Trust. :30 second commercial 1 Summertime Fun Looking for something fun to do this summer? Then check out what's happening at the Waterloo Center for the Arts....there's live music, gourmet luncheons, one -day workshops, summer camps, films, and of course hands-on fun in the Phelps Youth Pavilion. Where else can you check out the hottest art exhibits, buy artwork from a local artist and milk a life-size cow all in one day! Call 291-4490 or visit waterloocenterforthearts.org and check out their summer schedule today! This ad supported by Vision Iowa and a City of Waterloo Hotel -Motel grant. :30 second commercial 1 Membership promo It's an exciting time to become a member of the Waterloo Center for the Arts! Are you single? Have a family? Love spoiling your grandkids? If you answered yes to any of these questions, then you need a Waterloo Center for the Arts membership! Members get discounts on classes, birthday parties, and Gift Store purchases — and unlimited, free admission to the Phelps Youth Pavilion and hundreds of other museums across the nation. Join today for amazing experiences at the Waterloo Center for the Arts! Call 291-4490 or visit waterloocenterforthearts.org today! This ad supported by Vision Iowa. :30 second commercial 1 Trick or Treating event Come in costume to trick or treat at the Phelps Youth Pavilion on Sunday, October 30 from 6-8pm. Kids of all ages will enjoy this fun, non -scary Halloween event! Characters from the Pavilion's exhibits will come to life as you trick or treat through the galleries for festive treats, prizes, crafts and more! Cost is just $3 per trick or treater and adults are free. Pre -registration is optional, but is limited to 500 trick or treaters! Call 291-4490 to ensure your 'spot' or visit phelpsyouthpavilion.org. This ad supported by Vision Iowa and a City of Waterloo Hotel -Motel grant [TELEVISION script] :30 second commercial Launch your kids into a world of wonder, discovery and learning at the Phelps Youth Pavilion in downtown Waterloo. Your child will become a Hollywood star on the FunStage, explore digital finger- painting, drive a tractor into a Grant Wood painting and so much more! Make reservations for your child's next birthday party Discounted admission for school field trips and group tours. Come to the Phelps Youth Pavilion — where ART launches a world of wonder, discovery and learning! THE PAVILION IS SUPPORTED IN PART BY THE VISION IOWA PROGRAM. Phelps 2,� youth pavilion it waterloo center for the arts Present this coupon for One Free Admission to our hands-on children's museum! Expires9/x0/2010 vmvw.pholpsyoulllpavilion.0101310.201.4.001225 Cemmewlot &peel ( Dvnn:mvn Ivalanoo. 10va aNrr0 l0 n. V154on ww> Phelps ,youth pavilion 1 psyouthp ovl li artorg yr' Phelps youth pavilion qt waterloo center for the arts Present this coupon for 2 PRICE ADMISSION Family fun at our hands-on children's museum! EXPIRES P/31 X10 www.phelpsyouthpavil!on.org 1319.291.4490 225 Commercial Street 1 Downtown Waterloo, IA Phelps Youth Pavilio [Sample print advertisements] Spring Break Camp {Grades k.-41 March 15.19 1 9:00am-a0Opm Creative Writing tAgeo 9121 March 1519:00am- 2:00pm Spring Break DoIlarDays..,-. March 15.21 I PhelpsYouth Pavillon.: SPO<amrrd PE 1w MWEYoy 1NPI M EG101 OI fit Idei0o(e math biniflxit. waterloo center for thearts.org Galleries Special Events Classes/Workshops ArtHouse Cafe Gift Store and the Phelps Youth Pavillon a hands-on ohildren`s museum for all ages! www.waterloo center forthearts.org II '. IO 15.U:Y:m l Sm 1'.i,. SPONSORED IN PAPE DY VISION IOWA 2 Facebook.com [Sample of potential ad and associated costs] acebook Search Shannon Hoyt Farlow Home ir 0I. l4 Review Ad Please review your ad fur accuracy. M Preview: Ad Name: Audience: NV Waterloo Center for the Arts RSVP for aur FREE, members -only party this Thursday night) If you're a WCA membe,... Mt.::-,;; Phelps Youth Pavilion phelpsyouthpavilion.org Q r • Share Page Post Ad This ad targets users: • who live in the United States • who live in Iowa • age 22 and older • who are Female Campaign: My Ads (New Campaign) Bid Type: CPC Bid: $0.64 USD per dick Daily Budget: $5000 USD per day Duration: This ad campaign will un indefinitely Place Order Edit Ad Help Center Ey clicking the "Place Order" button, 1 agree to the Facebool: Statement of Rights and Responsibilities including my obligation to cornply with the Facebook Advertising Guidelines. I understand that failure to comply with the Terrns and Conditions and the Advertising Guidelines may result In a variety of consequences, Including the cancellation of any advertisements I have placed, and termination of my Greater Cedar Valley Chamber of Commerce [EXTRA advertising] Cedar Valley Extra - EXTRA Advertising - Mozilla Firefox File Edit View History Bookmarks Tools Help $ Cedar Valley Extra - EXTRA Advertising 1. E51,>, , `$ wenNygmtrc comkedervalleWabour spon,phpnd 3075( j' gEd Most Visited t http://www.waterloo.... Pinterest J Home cf:ii Research Grant Progc,. ® RANDOM.OR r , Total Resource Camp ,i ' Google home' emeed 7l bll In I v IPriialll i I il;ul hif 3S. spoil .I" hiP 1101 Ci pa iffn Stli Id P4' � it b l il.,,l_'login Cedar Valley Extra: EXTRA Advertising cost: $350 benefits Companies have the opportunity to advertise in the Cedar Valley EXTRA by submitting a 50 -word paragraph promoting their products, services or special event, Advertisements will run during the weeks chosen by the company; the two advertisements must run within a 6 -week time frame. Company web site link will be included; click through tracking will be provided. sold to • Lincoln Savings Bank • Waterloo Center for the Arts « back 1 view/print contract hantPe, »' Eastern Iowa Tourism Association's website markets to travelers across the world. You can make sure your web banner ad is showcased for the world to see! The Eastern Iowa Tourism website is the traveler's tool for destination information in Eastern Iowa. Prospective travelers can search member attractions, events, destinations, lodging and restaurants by community. Our members are promoted on the site by links with their contact information. Increase your presence on the EITA website by advertising with a banner ad which will include a direct link to your site. This is a great opportunity for an affordable advertising investment that can reach travelers around the world. \I Sign me up! EITA Website Banner Ad Rates Your EITA Rotating Banner Ad will be displayed in an equal rotation. The ads are 212 pixels wide X 120 pixels tall and include a link to your website. Ads are sold on a first come, first serve basis, the maximum number of ads sold per session will be nine. 5% discount on a banner ad with a 2012 EITA Visitor Guide Ad Placement NEW! ❑ Contact You pick two consecutive months! (Month 1 Month 2 $200 ❑ Six Month Session (July 1 -December 31, 2011) ❑ Six Month Session (January 1 -June 30, 2012) Twelve Month Session (-1+141-17-20-14-June 30, 2012) .Jan t 12011- x $400 $400 $750 .-- Organization Address Email &doo an kr -kr Mt Mi City Web State Please return this form to EITA, PO Box 189, Dyersville, IA 52040 Ph- 800-891-3482. Fax- 563-875-2358. eita@easterniowatourism.org WATERLOO & CEDAR FALLS We now offer digital poster locations — one in Waterloo and one in Cedar Falls. Advertisers have the option to be at one or both locations. An additional option is to rotate between the two locations on a weekly basis starting on Mondays. These units are strategically placed to reach an average of 10,880 consumers daily! Each unit will display messages in eight second intervals, 24 hours a day! Why go digital? Timely design changes! No production charges! Target the highly mobile consumer and capture them while they're out spending money! Your crystal clear message plays 24 hours a day, 7 days a week. Facing East Panel # 10263 What you receive 69 spots per hour 1665 spots per day 49,950 spots per month 4 - week flight 3 Flights = $1,500 net/4 weeks 6 Flights = $1,200 net/4 weeks 13 Flights = $1,000 net/4 weeks Weekly option One week = $500 net Two weeks = $900 net Three weeks = $1,300 net Four weeks = $1,700 net (Above rate includes 1 slot) THE IOWAN. magazine A Pioneer Communications Publication ADVERTISING PROPOSAL Date: November 3, 2011 To: Shannon Farlow Waterloo Center for the Arts Waterloo, IA Thank you for giving us the opportunity to present this advertising proposal for 2012. Please note that we adjusted the dates for the special issues. Of course, the ads can run whichever month you wish and the rate will remain the same, Display ads Ad size 1/6 page Frequency 2x Rate per insertion $445/net less 10% non-profit discount Issue March/April 2012 - Travel marketing, outdoor recreation (aka Destination Trails) May/June 2012 Heritage tourism Total 2 ads @ $400.50/net per issue= $801/net Please let me know if you have any questions regarding this information. Thank you again for this opportunity to partner with you. Prepared by: Gaeta J. Wilson Account Executive 300 Walnut Street, Suite 6, Des Moines IA 50309 Phone 515.246.0402 1 Fax 515.246.03981 www.iowan.com November 3, 2011 (1)-01) Ng yL � b 0 r Nert er Porig" e 9aVERT1$ ' Quote for Waterloo Center for the Arts For the 2012 Season Prepared by Mary Lou Killebrew Quote is for 1 ad per month Ad Size is 2 columns X 2" high March 2012 ad .@ $440 June 2012 ad @ $330 July 2012 ad @ $330 August 2012 ad @ $440 November 2012 ad @ $330 Total $1870 319 E. 5th St. Des Moines, IA 50309 (515) 244-2145 (800) 227-7636 Fax (515) 244-4855 www.CNAads.com NORTHWEST REGION Akron Hometowner Algona Upper Des Moines Armstrong Journal Aurelia Star Bancroft Register Belmond Independent Britt News -Tribune Cherokee Chronicle Times* Clear Lake Mirror Reporter Danbury Review Dayton Review Dows Advocate Eagle Grove Eagle Forest City Summit Winnebago Hancock Shopper Cowrie News Graettinger Times Hawarden Independent/Ireton Examiner Holstein News Hull Sioux Co. Index -Reporter Humboldt Independent Ida Grove Ida County Courier+ Inwood West Lyon Herald Jewell S. Hamilton Record -News Kanawha Reporter Lake City Graphic Lake Mills Graphic Lake View Resort Le Mars Daily Sentinel* Odebolt Chronicle Ringsted Dispatch Rock Rapids Lyon Co. Reporter Rock Valley Bee Rockwell City Calhoun Co. Advocate Ruthven Zipcode Sac City Sun Sergeant Bluff Advocate Sheldon Mail -Sun Sibley Osceola Co. Gazette -Tribune Sioux City Journal* Spencer Daily Reporter* Spirit Lake Dickinson Co. News Storm Lake Pilot -Tribune Strafford Courier Swea City Herald -Press Thompson Courier and Rake Register 45 Newspapers/1 Shopper Readership: 236,764 NORTHEAST REGION Allison Buller Co. Tribune Journal Anamosa Journal -Eureka Belle Plaine Union - 4 County Market Bellevue Herald Leader Blairstown S. Benton Star -Press Cascade Pioneer Cedar Rapids Gazette* Pennysaver Clinton Herald* Conrad Record Decorah Journal Decorah Public Opinion Denver Forum Dubuque Telegraph Herald* Dyersville Commercial Eldora Hardin Co. Index Eldora Herald -Ledger Elgin Echo Elkader Clayton Co. Register Fayette Leader Grinnell Herald -Register Guttenberg Press Hampton Chronicle Hubbard South Hardin Signal -Review Iowa Falls Times -Citizen The Advertiser Jesup Citizen Herald Lime Springs Herald Manly Junction Signal Marengo Pioneer -Republican Marion Times Mason City Globe Gazette" Monona Outlook Monticello Express Mount Vernon -Lisbon Sun The Sunlight New Hampton Tribune Nora Springs Rockford Register Oelwein Register* Osage Mitchell Co. Press -News Osage Shoppers Guide Ossian Bee+ Riceville Recorder Saint Ansgar Enterprise Journal SLacyville Monitor -Review Waterloo/Cedar Falls Courier' Waukon Standard+ 43 Newspapers/5 Shoppers Readership: 730,116 CENTRAL REGION Adel Dallas Co. News Altoona Herald -Mitchellville Index Aures Tribune* The Story Today Boone News -Republican* Earlham Advocate Indianola Record -Herald & Tribune Madrid Register -News Nevada Journal+ Newton Daily News* Ogden Reporter Slater Tri -County Times Winterset Madisonian+ Woodward NE Dallas Co. Record 13 Newspapers/1 Shopper Readership: 132,036 SOUTHWEST REGION Adair News Anita Tribune Atlantic News -Telegraph* Audubon County Advocate Journal+ Breda News Carroll Daily Times Herald* Times Herald Advertiser Corning Adorns Co. Free Press Council Bluffs Daily Nonpareil* Creston News Advertiser* Denison Bulletin Denison Review Dunlap Reporter Elk Horn Danish Villages Voice Glenwood Opinion -Tribune Town & Country Greenfield Adair Co. Free Press Griswold American Jefferson Herald Lenox Time Table Mapleton Press Green Saver Missouri Valley Times -News* Mount Ayr Record -News Onawa Sentinel Red Oak Express Shenandoah Valley News Today-- Stuart oday*Smart Herald Villisca Review Stanton Viking Walnut Bureau Westside Observer 28 Newspapers/3 Shoppers Readership: 217,004 SOUTHEAST REGION Albia Monroe Co. News Albia Union -Republican Bettendorf News Bloomfield Democrat Brooklyn Chronicle Grinnell Pennysaver Burlington Hawk Eye* The Hawk Eye Shopper Centerville Daily Iowegian*+ Davenport Quad -City Times* Fairfield Daily Ledger-+ Farm & Home \Veekly+ Farmington -Van Buren Co. Leader -Record Fort Madison Daily Democrat* Fremont Village Vine Kalona News+ Keokuk Daily Gate Gity" Keosauqua Van Buren Co. Register Montezuma Republican Morning Sun News -Herald Mt. Pleasant News`s+ Muscatine Journal* New London Journal New Sharon Sun North English Record Oskaloosa Herald Ottumwa Courier+ Packwood Clarion -Plainsman Riverside Current Sigourney News Review+ Wapello Republican Washington Evening Journal* Wellman Advance \Vest Burlington DM Co. News West Liberty Index What Cheer Paper Williamsburg Journal -Tribune Iowa County Advertiser 34 newspapers/4 shoppers Readership: 440,926 *Daily newspaper +Statewide Online Network Total Daily Newspapers: 28 Total Weekly Newspapers: 135 Total Shoppers: 14 Total Publications: 177 Total Readership: 1,756,846 advertising@cnaads.com 1-800 227-7636 www.classifiednation.com IOWA, ILLINOIS, WISCONSIN INr'7 m vacation an Reach over 78,000 Telegraph Herald readers.* Distribution Myvacationland.com is distributed in parts of Iowa, Illinois, and Wisconsin through the Chamber of Commerce, Welcome Centers, and in high traffic locations. There are 29,000 copies inserted in the Dubuque Telegraph Herald newspaper. Total copies printed for May are 35,000 and 31,000 for September. 2011 Publication Saturday, May 7 Spring/Summer Saturday, September 3 FaII/Winter Spring/Summer Reservations Deadlines Friday, Mardi 18, 2011 Fall/Winter Ad Materials Friday, July 15, 2011 RESERVE YOUR AD .SPACE TODAY! Call Jesse Graves 563.588.3817 or e-mail: igraves@wcinet.com 801 Bluff Street I P.O. Box 688 Dubuque, IA 52004-0688 TF. 800.562.6005 x768 • FX. 563.588.3834 'Base: 156,300 tri-state market adults. Source MOFI Research, 2010 On average, tri-state adults are taking eight weekend/day trips a year; 44,100 adults get away 9 or more times each year the desire to travel is there! Promote your attraction in the 2011 myvacationland.com travel magazine and Web Site. Sell the fun! Please Check Your Selection Ad Size ❑ Full Page...7.5"w x10"h ❑ Half Page...7.5"w x 4.875"h or 3.625"w x 10"h ❑ 1/4 Page...3.625"w x 4.875"h ❑ 1/8 Page...3.625"w x 2.375"h ❑ Business Card Size...3.625"w x 1"h ❑ Inside Front Cover...7.5"w x 10"h ❑ Inside Back Cover...7.5"w x 10"h ❑ Outside Back Cover...7.5"w x 10"h Color $1,878 $1,023 $599 $378 $326 $2,040 $1,938 $2,040 B&W $1,707 $854 158 n/a n/a n/a ADD COLOR TO INCREASE IMPACT $165 process color I $75 spot color N • Sign up now for both editions and save 25% on the September edition. °lg' h3W; 1ii\';t'Id ill lijl Iii ti)iil' Ii(trR'1(ii I lidltl',!9i(1I+r110"11(I '3!a'1 r%ii}j'r]I1 Ulii fFtl81%Illi+ bt11'j.igil?' I • THE (;OURIE P.O. Box 540 501 Commercial St. Waterloo, IA 50704 Phone: 319-291-1400 Fax 319-291-4014 1904 Main Street Cedar Falls, IA 50613 Phone: 319-277-3300 Fax: 319-277-3308 Date: November 3, 2011 To: Shannon Farlow, Waterloo Center for the Arts From: Eric Anson, Waterloo Courier Re: Future Advertising Pricing in Waterloo Courier Shannon, Here is the pricing information that you requested regarding advertising prices in the Courier. Please note that all of the prices listed are tentative. • February — Design an Ad o 5"x5"--$200 • April — Partners in Education o Eighth Page Ad -- $240 • April — Chamber of Commerce Directory o 3.667" x 4.83" -- $525 • Nov — holiday hysteria 2 'A page ads-- $550 each • Oct. -Dec. Total dominance Holiday Sale - Dominate homepage and strip ad on cover of paper-- $1,500 • Total dominance regular price - Dominate homepage and strip ad on cover of paper-- $2,000 Again, these prices are tentative and are subject to change. Sincerely, Eric Anson Courier Communications Ph 319-291-1529 501 Commercial St . PO BOX 540. Waterloo, Iowa 50704 eric.anson@wcfcourier.com www.WCFCourier.com 2012 Monthly Marketing Plan: • 21 :60 second commercials to run Monday thru Friday, 6am-7pm on Mix 96.1. • NON -Profit match of 21 :60 second commercials to run Monday thru Friday, 6am-midnight on Mix 96.1. • BONUS — 8 :60 second commercials a month to run on Saturdays, 6am-7pm onMix96.1. • BONUS — 3 Morning Show interviews during the 9 month period to promote upcoming events, classes, etc. • BONUS — PSA's will be listed on our web site www.935tzemix.com in the community calendar section. • Monthly Investment: $400 Projected months to run: February, March, May, June, July, August, October, November, December. Please sign if you accept the marketing plan: Phelps Youth Pavilion Date: Cedar Falls Utilities Estimate Order Detail Contract: Acct. Exec.: Order Dates: 1/01/12 to 012/31/12 Billing Period: Order: 1 of 1 Send Bill To: Client Order Type: Advertising Agency Billing Type: Calendar Client: 257 - Waterloo Center for the Arts Contract Status: Future Comm. Type: Standard Package Fee Average: $300/month Agency: Contract Dates: 1/01/12 to 012/31/12 Revenue Type: - Estimate Id: Rep. Finn: Order Entry: Product Type: Fair Rep Order#: Agency Product Code: Pri Pre Make Date Date Spots Per Day Start Stop Total Spot Total Spot Prog Line Le Le Good Network Zone Start Stop Mon Tue Wed Thu Fri Sat Sun Time Time Spots Cost Cost Length Type 1 4 4 Yes Fox News CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 2 4 4 Yes ESPN CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 3 4 4 Yes Bravo CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 4 4 4 Yes TBS CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 5 4 4 Yes Life CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 6 4 4 Yes A & E CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 7 4 4 Yes Disc CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 8 4 4 Yes TLC CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 9 4 4 Yes Nick CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 10 4 4 Yes Cartoon CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 11 4 4 Yes History CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 12 4 4 Yes LifeMovies CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 ,00 00:00:30 Al 13 4 4 Yes Food CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 14 4 4 Yes Travel CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al 15 4 4 Yes HGTV CFU 01/01/12 12/31/12 0 0 0 2 2 2 0 06:00:00 24:00:00 .00 .00 00:00:30 Al Id(s) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Media Weights Order Summary Total Spots Total Cost Average Spot Cost (Gross) Average Spot Cost (Net) Spot Status Summary Spots Paid Gross Net Total Paid Total Paid Req. Schd. Aired Fail Billed Fill $.00 $.00 $.00 0.00 $.00 0.00 66 0 0 0 0 0 Package Fee Summary Jan Feb Mar Apr May Jun Jul Auq Sep Oct Nov Dec Monthly Contract Total $.00 $300.00 $300.00 5.00 $300.00 5300.00 5300.00 $300.00 $.00 $.00 $300.00 $300.00 $300.00 52,400.00 Added Fee Summary Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Monthly Contract Total 5.00 5.00 5.00 $.00 $.00 5.00 $.00 $.00 $.00 5.00 $.00 $.00 5.00 $.00 Spot Month Totals Year Jan Feb Mar Apr May 2012 0 0 0 0 0 .00 .00 .00 .00 .00 Page 1 Order Detail Jun Jul Aug Sep Oct Nov Dec 0 0 0 0 0 0 0 00 .00 .00 .00 .00 .00 .00 J OnMedia2 Waterloo, Discovery History ABC Family Nickelodeon Cartoon TLC Waterloo Center of the Arts Waterloo Outer, Dubuque, Cedar Rapids 6am-mid $10.00/ea. 6am-mid $5.00/ea. 6am-mid $2.50/ea. 6am-mid $2.50/ea. 6am- 5pm $2.50/ea. 6am-mid $7.50/ea. Total Investment Per Month: $650.00 (2 weeks of airtime per month) * Tentative Schedule: February, March, April, May, June, July, August, December. * Total number of commercials running on each station will be determined when finalizing the schedule. IOWA'S NEWS CHANNEL ) 0 0 0 0 0 Campaign Campaign Schedule 8x M -Friday KWWL 6a News 1 6-7am 8x M -Friday NBC Today Show 1 7-9am 8x M -Friday Dr. Phil 1 3-4pm 3x M -Friday KWWL 6p News 1 6-630pm 50x M-FridayKWWL/NBC Programming I5am-1 1 pm TOTAL: 77 :3o commercials per 2 week run! Reach: 204,196 Households in Eastern Iowa! Frequency: Each Household will hear your message - a minimum of 9 times! *Tentative schedule is to run February, March, June, July, December. * Prices are quotes and are subject to change. Total Westmont $6r133 2012, waterloo center for the arts 225 Commercial Street Waterloo, IA 50701-1313 Phone 319,291.4490 Fax 319.291.4270 www.waterloocernerforthearts.org DATE: November 1, 2011 TO: Vision Iowa Program Manager Iowa Department of Economic Development FROM: Cammie Scully, Director Waterloo Center for the Arts RE: Commitment for Matching Funds for 2012 Grant Application The Waterloo Center for the Arts will provide matching funds for its 2012 Vision Iowa Marketing grant from the following areas: $3,500 Phelps Youth Pavilion budget $7,582.50 Community Foundation or Northeast Iowa Expendable Fund Additional matching funds will be provided by a grant received from the Hotel -Motel Tax fund. This award letter is attached to this application. Please note that the full award is $10,000, however we are only using $5,000 as match for this project. Thank you for your consideration of this request. WATERLOO CONVENTION & VISITORS BUREAU February 8, 2011 Dear Shannon, At last night's meeting, the Waterloo City Council approved recommendations for the FY12 Hotel -Motel Tax Grant program. The Waterloo Center for the Arts application for the Pavilion/Holiday Arts Festival Marketing was reviewed and funding in the amount of $10,000 was approved. The approved funds are to be used specifically for the items outlined in your grant application. Please also note the following: ❑ Funds must be used for the project specified in your grant application. If details of your project change, please contact me at 319-233-8350 prior to funds being spent to ensure that funds will be approved for the changed use. ❑ Funding is for projects and expenditures that occur in Fiscal Year 2012 (July 1, 2011—June 30, 2012). ❑ Funding is distributed as reimbursement approximately 30 days after receipt of the post -event evaluation form, which is included with this letter. ❑ A logo highlighting the funding received through the Waterloo Hotel -Motel Tax Fund is to be included on all print and video materials, and acknowledgement of the funding should be included in all audio materials. The logo is available by contacting me. ❑ Funding may be used only for "Fundable Items" as highlighted on the grant application. If you have any questions, please feel free to contact me at 319-233-8350. Thanks very much for all you do for Waterloo tourism! Sincerely Aaron :iaa Executive Director CITY OF WATERLOO Council Communication City Council Meeting: November 14, 2011 Prepared: November 9, 2011 Dept. Head Signature: S.G. # of Attachments: SUBJECT: '1)1'1(-(7 >41-19YNd- (104/2-60 OtrAuuKr,t ,V 5633 Ordinance Change — Activated Hybrid Beacons 1800 LaPorte Rd. 1500 E. Orange Road Submitted by: Sandie Greco, Traffic Operations Superintendent Recommended City Council Action: Adopt Ordinance Summary Statement Beacons were installed for protection of fire apparatus exiting the new fire station. Beacons will be operating in the near future for a pedestrian crossing in front of Hawkeye Community College. Expenditure Required: Source of Funds: Policy Issue Alternative Background Information: A Hybrid Beacon is a special type of beacon that is intentionally placed in a dark mode (no indications displayed) between periods of operation and. When operated, displays both flashing and steady traffic signal control indications. Hybrid Beacon can be for pedestrians or emergency vehicles. Hybrid beacons warn and control traffic at unsignalized locations to assist pedestrian crossings, or to assist emergency vehicle crossings. ORDINANCE NO. AN ORDINANCE AMENDING THE 2008 TRAFFIC CODE BY ENACTING A NEW SECTION 540A, ACTIVATED HYBRID BEACONS. BE IT ORDAINED by the City Council of the City of Waterloo, Iowa: That a new Sec. 540A, Activated Hybrid Beacons, of the 2008 Traffic Code, is hereby enacted in as follows: SEC. 540A. ACTIVATED HYBRID BEACONS. The driver of any vehicle shall obey the instructions of any activated hybrid beacon as named herein unless otherwise directed by a police office, subject to the exceptions granted the driver of an authorized emergency vehicle: (1) LaPorte Road in the 1800 block at the fire station (2) Orange Road in the 1500 block at Hawkeye Community College PASSED AND ADOPTED by the City Council this day of , 2011, and approved by the Mayor this day of ATTEST: Suzy Schares, City Clerk , 2011. Ernest G. Clark, Mayor CITY OF WATERLOO Council Communication City Council Meeting: 11-14-2011 Prepared: 10-31-2011 /) Dept. Head Signature:/ / t" # of Attachments: 3 SUBJECT: Five Sullivan Brothers Convention Center Duct And Coil Cleaning Change Order #1 Submitted by: Craig Clark Building Official/Maintenance Administrator Recommended City Council Action: Approve recommendation of award of change order #1 in the amount of $67,668.84 to Americlean of Waterloo, Iowa in conjunction with Five Sullivan Brothers Convention Center Duct And Coil Cleaning, be received, placed on file and adopted. Summary Statement Addition work to be done by Americlean will help protect the Five Sullivan Brothers Convention Center heating and cooling system from future problem. This type of work was not part of the original contat but is very important for future use of the Five Sullivan Brothers Convention Center. Expenditure Required $67,668.84 Source of Funds 010-22-6868-1382 Background Information: Request # RFC CW5501-002-B Project # City of Waterloo To: Craig Clark REQUEST FOR CHANGE Request date: 10/04/11 Project Name: 5 Sullivan Brothers Convention Center HVAC Project Location: 4th and Sycamore Reason for Request: ❑ Insufficient Information ❑ Engineering Conflict X Alternate Proposal Probable Effect: X Increase Cost ❑ Decrease Cost ❑ No Cost Change X Increase Time ❑ Decrease Time ❑ No Time Impact Action Requested: ❑ Clarification O Direction X Approval Reference: Mold -HVAC Sanitizing agents and Antimicrobial/Fungicidal Coatings Drawing No -Sheets M11, 12 and 20 Detail No -NA Spec Section -NA This RFC is the 2nd in a series to be submitted as information and recommendations are best determined. As before, this segmented approach is deemed best to allow for the project to continue, utilizing industry recommended protocols for addressing mold contaminates, and to assist in restoring the contaminated lining materials within the HVAC systems. These recommendations address the application of EPA registered sanitizing/disinfecting agents and antimicrobial/fungicidal HVAC coatings, each registered specifically for use in HVAC Systems. HVAC Systems #3, 4 and 5. Recommendation Per Project IEP recommendations, included the HVAC and Environmental Assessment (performed by Joel Koffron, Environmental Engineer -IEP). Contractor to provide the following services: 1) Supply OSHA required PPE to be donned by workers during application of sanitizing/disinfecting agents and antimicrobial/fungicidal coating materials to the interior of the contaminated ductwork. 2) Apply Oxine- EPA registered HVAC sanitizing agent to all supply (HP and LP) and return ductwork on HVAC systems #3, 4, and 5. 3) Apply Surface Shield- EPA registered antimicrobial HVAC encapsulate to all Low Pressure supply ductwork and all return ductwork on HVAC systems #3, 4, and 5. Clear coating- ULV application. 4) Apply IAQ 8500 or Fosters 40-30- EPA registered antimicrobial/fungicidal HVAC coating to all HP supply ductwork on HVAC systems #3, 4, and 5, from the AHU to the VAV's. Black coating- airless sprayer/ lance application. 5) Provide protective services- drops, containments, visqueen as required for applications. 6) Furnish and install additional access doors as required for application of products as above 7) Supply lift equipment for application of sanitizing and coating agents. 'Removal and replacement of degraded or unsalvageable interior lining materials in the AHU's and any HP supply ductwork is not included, and will be addressed on another RFC as information and recommendations are available. 1 RFC CW5501-002-8 5 Sullivan Brothers Alternate Bid- RFC # CW5501-002-B (HVAC Sanitizing agents and Antimicrobial/Fungicidal Coatings—HVAC Systems #3, 4 and 5) Provide all necessary labor, equipment, and materials as noted in the recommendations section of this RFC. PPE- Supply respirators, respirator cartridges, disposable respirators, Tyvek suits as required $385.92 Protective services- Supply all labor and materials for required drops, visqueen, site protection during the application of products $199.60 Apply Oxine- EPA Registered HVAC sanitizing agent to all HP and LP Supply and Return ductwork on HVAC systems #3, 4, and 5 HVAC System #3 $1489.00 HVAC System #4 $2182.00 HVAC System #5 $4241.00 Apply Surface Shield- EPA Registered HVAC antimicrobial encapsulating coating -Clear- ULV application- to all LP Supply and Return ductwork on HVAC systems #3, 4, and 5 HVAC System #3 $1732.21 HVAC System #4 $8140.93 HVAC System #5 $15952.14 Apply IAQ 8500 or Foster 40-30- EPA Registered HVAC fungicidal/antimicrobial coating- Black - Airless sprayer/spray lance application- to all HP Supply ductwork on HVAC systems #3, 4, and 5 HVAC System #3 $8205.94 HVAC System #4 $3154.43 HVAC System #5 $5926.51 2 RFC CW5501-002-8 5 Sullivan Brothers Furnish and install additional Ductmate 8-10" insulated access doors- DCI 8GA or DCI 10GA- as required to allow for adequate access to ductwork for application of specified products 48 each $1391.04 Supply lift equipment for additional duration for application of noted materials, including delivery and pick up $1850.52 Total RFC #CW5501-002-B NOT TO EXCEED $54851.24 *Contractor will review and initiate any alternate decreased cost options for reduced scope of work which may include substitution coating materials if deemed appriate during this work, and adjust the final invoice accordingly as a benefit to the owner/agent. Response: x Proceed with recommendation ❑ Proceed with the following instructions: Billing to be: ❑ Unit Price 9 Cost Plus X Lump Sum Owner signature: date 3 ❑ T&M RFC CW5501-002-B 5 Sullivan Brothers Cedar Rapids Iowa City Waterloo Dubuque (319)362-0604 (319)354-4577 (319)233-8144 (563)582-2646 Davenport Toll Free FAX (563)383-0604 (800)716-0604 (319)896-4509 Email americln@aol.com americlean( southslope.net www.americleaniowa.com RFC CW5501-002-S 5 Sullivan Brothers CITY OF WATERLOO Council Communication City Council Meeting: November 14, 2011 Prepared: November 2, 2011 Dept. Head Signature: PH # of Attachments: SUBJECT: 2011 RIVERVIEW RECREATION AREA PASSIVE UNIT ENHANCEMENT PHASE II Submitted by: Rick Curran, Facilities Manager, Leisure Services Recommended City Council Action: Approve Plans, Specifications and Form of Contract for the 2011 RIVERVIEW RECREATION AREA PASSIVE UNIT ENHANCEMENT PHASE II (Contract No. 815) and set the date of Public Hearing and Bid Opening as December 5, 2011. Summary Statement: This project is to construct two (2) fishing jetties and to extend bike trail at Riverview Recreation Area. Above -referenced project documents will be available for review in the offices of the City Clerk and Wayne Claassen Engineering of Waterloo, Iowa. Expenditure Required: No expenditure at this time. Project Budget is estimated at $185,000.00 Source of Funds: Project cost will be funded by a combination of City Bond and REAP Agreement - 11 -R4 -WR in the amount of $171,902.00. Policy Issue: NA Alternative: NA Background Information: On November 15, 2010, Mayor signed Agreement 11 -R4 -WR for development costs for Riverview Recreation Area Passive Unit Enhancements. On February 14, 2011, Finance Committee approved Wayne Claassen Engineering for engineering and surveying services for this project. Army Corps of Engineers approval July 28, 2011. DNR approval October 18, 2011. City of Waterloo Flood Plan Permit applied for October 28, 2011. MINUTES WATERLOO LEISURE SERVICES COMMISSION TUESDAY, SEPTEMBER 13, 2011 LEISURE SERVICES OFFICE 1101 CAMPBELL AVENUE Chairman Kevin Evans called the meeting to order at 7:30 AM. Present: Michael Allen, Sheryl Annette, Kevin Evans, Robert Frost, Julie Koch-Hoth, Aundra Meeks and Sharon Samec. Staff present: Paul Huting, Bill Bachman, James Bolger, Todd Derifield, Chris Dolan and Mark Gallagher. Evans called for approval of the agenda. Motion by Samec, seconded by Koch-Hoth to approve the agenda. Ayes: All. Nays: None. Evans called for approval of the 8/9/11 meeting minutes. Motion by Annette, seconded by Frost to approve the minutes. Ayes: All. Nays: None. Evans called for approval of the bills. Motion by Meeks, seconded by Samec to approve the bills. Ayes: All. Nays: None. Staff updates were presented. The next regular Leisure Services Commission Meeting is scheduled for October 11, 2011. Motion by Samec, seconded by Frost to adjourn. Meeting adjourned at 8:14 AM. Signed this 8th day of November 2011. Sharon Sam4'Secretary MINUTES WATERLOO LEISURE SERVICES COMMISSION TUESDAY, OCTOBER 11, 2011 LEISURE SERVICES OFFICE 1101 CAMPBELL AVENUE Chairman Kevin Evans called the meeting to order at 7:30 AM. Present: Sheryl Annette, Kevin Evans, Robert Frost, Julie Koch-Hoth and Aundra Meeks. Staff present: Paul Huting, Bill Bachman, James Bolger, Chris Dolan and Mark Gallagher. Harold Getty - City Council Liaison, Tim Jamison -Courier Reporter and Randy Herod. Evans called for approval of the agenda. Motion by Koch -Roth, seconded by Meeks to approve the agenda. Ayes: AH. Nays: None. Evans called for approval of the 9/13/11 meeting minutes. Motion by Frost, seconded by Koch- Hoth to approve the minutes. Ayes: AII. Nays: None. Evans called for approval of the bills. Motion by Meeks, seconded by Annette to approve the bills. Ayes: All. Nays: None. Updates from the Sports Committee Meeting were presented. REQUEST TO MODIFY DOG PARK RULES — Mr. Herod is asking for clarification on the Dog Park rule pertaining to prohibiting "prong or spike collars". Leisure Services will research for explanation. BOAT HOUSE REGULATIONS — Motion by Robert Frost, seconded by Koch-Hoth to approve recommended changes to the Boat House Regulations. They are: Rental Fees: The rate for weekends (Friday, Saturday, Sunday) or holidays is $250 for up to 4 hours OR $300 for up to 8 hours. The rate for weekdays (Monday through Thursday) is $150 'Dec day for up to 4 hours OR $200 for up to 8 hours Bpsxness MeeungrRate U UP 9 a 2 hour„meeting between 8 0 arra 4 30 pm�, fl4oQtiaytth�o„ugly, Friday exclyfling holidays„ no attendap $50 00y Rental fee is due at the Waterloo Leisure Services office with the signed rental agreement within seven days from making your reservation. Your reservation will not be held past the seven day time period. The Boat House is available: 8:00 AM through ;1;,1;x30 PM. Alcohol: Beer, wine, nllqu`or are al/owed, but only in cans or bottles. Kegs`are not allowed. Compliance with Section 123.47 of the Code of fowa regarding the possession of alcohol by minors and all other rules, regulations, and state laws is mandatory. Ayes: All. Nays: None. RIVERFRONT SPORTS COMPLEX NAME — With approved funding for a major renovation of the youth sports complex at Cedar River -Exchange Park, Bob Hellman of Build our Ballpark is requesting Leisure Services officially name this complex the RIVERFRONT SPORTS PARK. Motion by Annette, seconded by Meeks to adopt the new Sports Committee approved name, in combination with Cedar River Exchange Park. Ayes: All. Nays: None. The next regular Leisure Services Commission Meeting is scheduled for November 8, 2011. Motion by Koch-Hoth, seconded by Meeks to adjourn. Meeting adjourned at 8:19 AM. Signed this 8th day of November 2011. Sharon Same ! Secrdtary WATERLOO COMMISSION ON HUMAN RIGHTS MONTHLY MEETING Thursday, August 11, 2011, 4:00 p.m. HUMAN RIGHTS CONFERENCE ROOM 4:00 P.M. — 5:00 P.M. Call to Order Commissioner Rhonda McRina called the meeting to order at 4:14 p.m. on Thursday, July 14, 2011. Roll Call Rhonda McRina, Dustin Cox, Steve Buckles, Sulejman Dizdarevic, Beth Huffman, Sharina Sallis, Ricardo Uranga, Jr., Jenifer Lara Excused Absence: Ron Wood Unexcused Absence: None Staff Present Abraham Funchess, Shelly Kruger Others Present Tony Miller from Tri-Star & JLC Management. Approval of Agenda Motioned by Commissioner Cox and 2nd by Commissioner Buckles to accept the agenda. Approval of Minutes Motioned by Commissioner Cox to accept the July minutes. Tracking Data by Lieutenant Lisa Campbell, Waterloo Police Department From July 15th — August 10th there have been 12 use of force incidents and 12 tazer incidents. Of those 12 tazer incidents, 5 were deployments and 2 were displays. Approval of Revenue & Expense Reports Motioned by Commission Cox and 2" by Commissioner Huffman to accept the July report. Commission Management Administrative/Policy Documents Regional HUD Training Waterloo Commission on Human Rights staff is attending HUD training in Kansas City next week. This is a very important training because of our visit from HUD and we're a little behind in some of the things that we are doing. We feel very optimistic about what we are doing. FHAP and WCHR We can get $2600 per case and our goal is to close 10 cases per year. That is what we're shooting for. We're still visiting some other ideas, such as expanding our jurisdiction to go county wide. We believe that not only do we provide additional coverage for people who are outside the boundaries of Waterloo with these protections but it should also help us increase our complaint flow therefore allowing us to grow out of our current dilemma. EEOC and WCHR In the history of the Waterloo Commission on Human Rights no one has ever applied for a direct relationship with the EEOC. We are doing that now. We are getting some very interesting discussion as a result of shooting for this direct relationship. It is good tension, it is a creative tension and quite frankly we are optimistic that some things will materialize sooner that we think. Our director did receive encouraging word from the Regional Director that they submitted our application to Washington. We thought that the response we received from ICRC was going to hold us up. This can mean the difference between $3000 a year and $30,000 a year. Added Ordinance Language/Changes We've changed some laws already. We've changed the number of commissioners for this commission from 10 to 9. The other law we changed is extending the time a complainant has to file from the day of the occurrence. We changed it from 180 days to 300 days to be consistent with state law. Finally, we'd also like to change a certain aspect of our ordinance that allows us to broaden our subpoena power. The language was a little limited before in terms of actually bringing a person forward and subpoenaing them and their testimony. Previously we could only subpoena paperwork or documents, etc. Sometimes you need an actual person there for a testimony. WCHR Commissioners and Investigations One of the things we'd like to explore, which is a little unorthodox, is giving our commissioners the opportunity to help with some of the investigations. Lionel Foster, out of Mason City, is willing to do some training and we would like to go ahead with that this year. Staff Reports Reports were made available Commissioners Reports Planning & Zoning None Other None Adjournment Motioned by Commissioner Wood and 2nd by Commissioner Cox to adjourn. The meeting was concluded at 5:25 p.m. Next meeting: Thursday, September 8, 2011 @ 4:00 p.m. CIVIL SERVICE COMMISSION MINUTES 7:30 a.m. May 5, 2011 Carnegie Conference Room Members Present: Tim Luce, Bonetta Culp Member Excused: John Blitsch Member Absent: Abraham Funchess (ex officio) Others Present: Mark Rice, Eric Thorson, Cheryl Huddleston Moved by Luce, seconded by Culp to approve the May 5, 2011 Agenda as mailed. Motion carried. Moved by Culp, seconded by Luce to approve the April 7, 2011 Minutes as mailed. Motion carried. UNFINISHED BUSINESS Updates Sewer Maintenance Worker — Waste Management Services — Open Exam Approved by Civil Service 11/19/10 and by Human Resources 12/13/10. Advertised in the Courier, posted on the City website and Cable, notices sent to the agencies, organizations and individuals on the Affirmative Acton list and posted in all City departments. Vacancy due to a resignation but will have 2-3 additional vacancies to satisfy EPA/DNR regulations. Received 24 resumes, but only 6 met qualifications and were invited to interview by a panel of Keith Kearns and Gary Luck from Waste Management Services and Mary Peterson from Human Resources. One candidate did not show for his interview and 1 did not pass. We readvertised and have received 15 resumes to date. Police Sergeant — Public Safety/Police — Promotional Exam Approved by Human Resources 4/4/11 and by Civil Service 4/7/11. There is 1 current vacancy and the list will also be used for out -of -rank assignments. The job notice was posted in the Waterloo Police Department and we received 11 resumes. A written test is scheduled for 6/23/11. A panel of current Waterloo Police Department management staff and officers will interview the candidates. Storm Water Specialist — Engineering — Open Exam Approved by Human Resources 4/4/11 and Civil Service 4/7/11. This is a newly created position needed due to EPA stornr water regulations. Advertised in the Courier, posted on the City website and Cable, notices sent to the agencies, organizations and individuals on the Affirmative Acton list and posted in all City departments. We received 13 resumes and are still reviewing them. NEW RITS1NESS The job description and testing criteria for Waste Water Operator — Waste Management Services was presented for approval. The Human Resources Committee approved the position on 4/25/11. There are 2 vacancies due to a transfer and a termination. We thought we would be able to hire off a current list, but the remaining candidates did not work out. We went ahead and advertised since there were not any changes in the job description and testing criteria so we are requesting approval of the job notice and description as a procedural process. Ten resumes have been received to date. Moved by Luce, seconded by Culp to approve the job description and testing criteria for Waste Water Operator — Waste Management Services. Motion carried. The job description and testing criteria for Street Foreman — Public Works/Street Department was presented for approval. The Human Resources Committee approved the position on 4/4/11. There is a vacancy due to a promotion and the position will be posted as a promotion in all City departments. The job description has been rewritten to give the foremen more supervisory responsibility. Moved by Luce, seconded by Culp to approve the job description and testing criteria for Street Foreman — Public Works/Street Department. Motion carried. OTHER AHSINFSS None With no further business, moved by Culp, seconded by Luce to adjourn. Motion carried. Cheryl Huddleston, Human Resources Manager Clerk for the Civil Service Commission Payment Voucher prepared by: Pauline Closson PURCHASE ORDER 9002 October 21, 2011 Vendor Name Peterson Contractors Address City & State ************************************* Invoice Date Invoice No. 7/22/11 21 Special Instructions: Submitted B a RC Qty/Unit TOTAL TOTAL CITY OF WATERLOO Departmerr Engineering Grant/Project Code # 07VITLOPL Amount Description 825.26 City Contract No. 761 Est. No. 21 F.Y. 2010 Riverfront Renaissance Trail Tree Clearing W 6th Street to W 18th Street Conduit Special Expansion joint Flowable Motor Retaining wall Rip Rap Provide & Place Rock Shoulder Eroision Control Mobilization $ 8,550.00 Surfacing Repair & Footing removal Thru 10/14/11 9,375.26 10/31/11 Date ci An Equal Opportunity/Affirmative Action Employer A111411 GL Distribution 290-07-7500-2165 407-07-7355-2156 424-07-7355-2165 424-07-7355-2165 424-07-7355-2165 424-07-7355-2165 424-07-7355-2165 424-07-7355-2165 424-07-7355-2165 424-07-7355-2165 Approved By: Prepared By Pauline C October 31, 2011 CITY OF WATERLOO 9002 PURCHASE ORDER A111411 Vendor No. 1132 Department: Engineering Vendor Name Peterson Contractors Grant/Project Code # 07VITLOPL Address Marks Park 37JMPMark City & State Wtr Works WWW Wtr Main Invoice Date Invoice No. Qty/Unit Amount Description GL Distribution 10/25/11 32 $191,148.88 City Contract No. 763 Est. No. 32 07VITLOPL 424-07-7610-2175 River Renaissance Lower Plaza - Water Work: Div. 2A Marks Park 37IMPMark 426-37-4105-2168 Wtr Wks Main WWW Wtr Main Div 2B 424-07-7610-2199 Period Ending 9/9/11 Special Instructions: Submitted B Total $ 191,148.88 10/31/11 Date Approved By: An Equal Opportunity/Affirmative Action Employer Prepared By Pauline C CITY OF WATERLOO 9002 PURCHASE ORDER A111411 November 7, 2011 Vendor No. 1132 Department: Engineering Vendor Name Peterson Contractors Grant/Project Code # 07VITLOPL Address Marks Park 37IMPMark City & State Wtr Works WWW Wtr Main ************************************* Invoice Date Invoice No. Qty/Unit Amount Description GL Distribution 11/3/11 33 $226,408.52 City Contract No. 763 Est. No. 33 07VITLOPL 424-07-7610-2175 River Renaissance Lower Plaza Water Work: Div. 2A Marks Park 37IMPMark Wtr Wks Main WWW Wtr Main Div 2B 424-07-7610-2199 Period Ending 10/28/11 Special Instructions: Submitted Total $226,408.52 426-37-4105-2168 'l W 44-1--, 11/7/11 Date Approved By: An Equal Opportunity/Affirmative Action Employer }Voucher prepared by: Pauline C CITY OF WATERLOO 9002 November 7,2011 PAYMENT VOUCHER A111411 Vendor No. Batch No. Vendor Aspro Department: Engineering Department Address City & State Invoice Date Invoice No. Qty/Unit Amount Description Keyed By: Grant/Project Code # 07 STR G/L Distribution 11/3/11 29 $205,569.37 Contract 772 Est. 29 205-07-7500-2165 - F.Y. 2010 Street Reconstruction 520-14-5200-2163 10/11 10/31/11 Special Instructions: CV /�u`G'mitted By Total $ 205,569.37 11/7/11 Date Approved By: Date An Equal Opportunity/Affirmative Action Employer Voucher Prepared by Pauline C CITY OF WATERLOO 9002 PAYMENT VOUCHER A110411 October 31, 2011 Vendor Name Address City & State Invoice Date Department Engineering Veith Construction Grant/Project Code # 07BIPRWCE ************************************* Invoice No. Qty/Unit Amount Description G.L. Distribution Contract 786 Est. # 12 10/14/11 13 $7,856.18 River Loop North Downtown Trail 290-07-7355-2156 $1,745.82 Construction 290-07-7355-2156 $12,220.73 Period Ending 9/30/11 424-07-7355-2156 Spe ial Instructions Submitted By TOTAL 21,822.73 10/31/11 Date Approved By Date An Equal Opportunity/Affirmative Action Employer Voucher Prepared by Pauline C CITY OF WATERLOO 9002 PAYMENT VOUCHER A111411 November 3, 2011 Vendor Name Address City & State Invoice Date Veith Construction ************************************ Department Engineering Grant/Project Code # 07BIPRWCE Invoice No. Qty/Unit Amount Description G.L. Distribution Contract 786 Est. # 14 10/14/11 14 $28,277.67 River Loop North Downtown Trail 290-07-7355-2156 $6,283.93 Construction 290-07-7355-2156 $43,987.48 Period Ending 10/28/11 424-07-7355-2156 TOTAL 78,549.08 Special Instructions , c ^ � %i�(�t/(l d/n �� 11/3/11 Submitted By Date Approved By Date An Equal Opportunity/Affirmative Action Employer Voucher prepared by: Pauline C CITY OF WATERLOO 9002 PAYMENT VOUCHER A111411 November 3, 2011 Vendor No. 82 Batch No. Vendor Aspro Department: Engineering Department Address City & State Invoice Date Invoice No. Qty/Unit Amount Description Grant/Project Code # Keyed By: q/L Distribution 11/2/11 12 $437,033.10 Contract796 Est. No. 12 205-07-7500-2165 F.Y 2011 Asphalt Overlay Program Special Instructions: Total $437,033.10 mi ted By Date Approved By: Date Voucher prepared by: Pauline C CITY OF WATERLOO 9002 PAYMENT VOUCHER A111711 November 7, 2011 Vendor Address City & State Aspro Vendor No. Batch No. Department: Engineering Department Grant/Project Code # Invoice Date Invoice No. Qty/Unit Amount Description 11/4/11 13 Contract 798 Est. 13 F.Y. 2011 Street Reconstruction 470,354.73 Div. 1 Sections I & II Division 1 Section III 10/11 - 10/31/11 Special Instructions: Su ed By Total $ 470,354.73 11/7/11 Keyed By: G/L Distribution 205-07-7500-2165 520-14-5200-2163 Date Approved By: Date An Equal Opportunity/Affirmative Action Employer Payment voucher prepared by: Pauline Closso C CITY OF WATERLOO 9002 PAYMENT VOUCHER A111411 November 7, 2011 Vendor Name Address City & State Invoice Date Vendor No. Department: Engineering Peterson Contractors Inc. Grant/Project Code # 07 VIP PUMP ************************************* Invoice No. Qty/Unit 11/2/11 12 Special Instructions Amount Description G.L. Distribution City Contract 801 Est* 12 Cattle Congress $77,121.47 Storm Water Improvements Div. 1 $8,830.25 Division II Sanitary Pump Station Period ending 10/21/11 TOTAL $85,951.72 /aX 11/7/11 Submitted By Date Approved By An Equal Opportunity/Affirmative Action Employer 424-07-7505-2171 520-14-5200-2163 CITY OF WATERLOO 9002 PAYMENT VOUCHER A111411 Finance Dept Only November 7, 2011 Vendor No. Batch No. Keyed By Vendor Name Address City & State Invoice Date B&B Builders & Supply Department: Engineering Grant/Project Code # Invoice No. Qty/Unit Amount Description G/L Distribution 10/28/11 4 7,408.81 Contract 811 Est No. 4 F.Y. 2012 Sidewalk Repair Assessment Program -Zone 1 10/11 - 10/26/11 Special Instructions: S / )/i7/ ed By Total 7,408.81 11/7/11 010-08-7650-2164 Date Approved By: Date An Equal Opportunity/Affirmative Action Employer Vouchers Prepared by Pauline C November 7, 2011 Vendor Address City & State Invoice Date 10/25/11 Special Instructions: Control Services, Inc Department: Engineering Grant/Project Code# Invoice # Qty/Unit u.mitted By 1 Amount Description Batch No. Keyed By: G/L Distribution 5,488,39 F.Y. 2012 Flood Control Systems Tree Removal 408-07-5600-2171 409-07-5600-2171 12,428.61 Estimate No 1 Total $ 17,917.00 11/07/11 Date Approved By: Date' An Equal Opportunity/Affirmative Action Employer Payment voucher prepared by: Pauline Clot osson CITY OF WATERLOO 9002 PAYMENT VOUCHER A111411 October 31, 2011 Vendor No. Department: Engineering Vendor Name AECOM Grant/Project Code # 07VIPPUMP Address City & State Invoice Date Invoice No. Qty/Unit 10/25/11 37175638 Special Instructions a Submitted By Amount Description G.L. Distribution $17,067.75 TOTAL $17,067.75 10/31/11 Dry Run Creek Arch Storm Water Manhole & Valve Replacements 10/24 - 10/21/11 NP Date Approved By An Equal Opportunity/Affirmative Action Employer 411-07-5600-2162 Voucher Prepared by Pauline C CITY OF WATERLOO 9002 PAYMENT VOUCHER A111411 October 31, 2011 Vendor Name Address City & State Department Engineering Snyder & Associates Grant/Project Code # 07LTF 5007 ************************************* Invoice Date Invoice No. Qty/Unit Amount Description G.L. Distribution 10/17/11 110.0951.01B-3 10/17/11 110.0951.01A-3 10/17/11 110.0951.01C Special Instructions ubmitted By $11,261.20 Waterloo Stormwater Lift Stations CDBG 409-07-5300-2103 Service thru 9/30/11 Cedar Bend $11,717.03 Design services Hollywood CDBG 409-07-5300-2103 Service thru 9/30/11 $10,345.65 Design Services Fletcher Ave CDBG Service thru 9/30/11 409-07-5300-2103 Est No. 3 TOTAL 33,323.88 10/31/11 Date Approved By An Equal Opportunity/Affirmative Action Employer Date WATERLOO CABLE TV COMMISSION March 3, 2011 5:07 p.m. First Floor Conference Room Members present: Edward Hutchens, Jane Scott, Larry Herzog, and Michael Neff. Members absent: None Also present: Suzy Schares, City Clerk. Moved by Scott, seconded by Neff that the agenda, be approved. Ayes: Four. Motion carried. Moved by Neff, seconded by Scott that the minutes of July 1, 2010, as proposed, be approved. Ayes: Four. Motion carried. Citizen Oral Comments None Financial Report The City Clerk will mail copies of the report to commissioners. Chairperson Report None Mediacom Report None CT Production Coordinator Report Ed Stoffer, Cable Television Production Coordinator, is working on adding a non-profit program to the channel. The commissioners were very supportive of this idea. Committee Report None New Business Recruitment of New Members — Scott suggested that each commissioner make a commitment to look for new members. Herzog requested to have a press release sent out and a notice put on the public access channel. Moved by Neff, seconded by Scott to recommend appointment to City Council of John Sherbon to the Cable Commission Ayes: Four. Motion carried. Unfinished Business Availability of Public Access and Government Access channels — Neff contacted Lee Grassley, Mediacom, and was told that the public access channels are not available to non-Mediacom subscribers. The City Clerk will ask Mr. Grassley to attend the next Cable Commission meeting. Moved by Scott, seconded by Hutchens to adjourn at 5:25 p.m. Ayes: Four. Motion carried. Suzy Schares City Clerk