HomeMy WebLinkAboutRemoval & Disposal of Asbestos-12122011AGREEMENT FOR REMOVAL AND DISPOSAL OF ASBESTOS
FOR CDBG GROUP NO. 140 -AR -12 -05 -11 -GO
THIS AGREEMENT made this 12TH day of December, 2011, by and between
AFFORDABLE HAZARDS REMOVAL, INC., a corporation organized and existing
under the laws of the State of Iowa, hereinafter called the "CONTRACTOR", and the
CITY OF WATERLOO, IOWA, acting through its COMMUNITY DEVELOPMENT
BOARD, hereinafter called the "CITY".
WITNESSETH, that the Contractor and the City for the consideration stated herein
mutually agree as follows:
ARTICLE 1. STATEMENT OF WORK. The Contractor shall furnish all supervision,
technical personnel, labor, materials, machinery, services, and perform and complete
within 30 calendar days after receipt of Notice to Proceed, all work required for the
Removal and Disposal of Asbestos in an efficient and workmanlike manner, as required
by the Iowa Department of Labor and the U.S. Environmental Protection Agency
regulations.
ARTICLE 2. THE CONTRACT PRICE. The City will pay the Contractor for the
performance of the Contract in current funds, subject to additions and deductions as
provided in the Section "Changes in the Work" under General Conditions, Part I, and
subject to all other conditions set forth in the Contract Documents, the sum of
SEVENTEEN THOUSAND, SIX HUNDRED DOLLARS ($17,600.00), and in
accordance with the contractor's bid.
ARTICLE 3. CONTRACT. The executed Contract Documents shall consist of the
following:
a. This Agreement
b. Addenda
c. Invitation to Bid
d. Instructions to Bidders
e. Signed copy of Bids.
f. General Conditions
Part I, II, and III
g. Special Conditions
h. Technical Specifications
i. Drawings as listed in the
Schedule of Drawings
THIS AGREEMENT, together with the other documents enumerated in this Article 3,
which said other documents are as fully a part of the Contract as if hereto attached or
herein repeated, forms the Contract between the parties hereto. In the event that any
provision in any component part of this Contract conflicts with any provisions of any
other component part, the provision of the component part first enumerated in this Article
3 shall govern, except as otherwise specifically stated.
ARTICLE 4.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
in three (3) original copies on the day and year first above written.
CONTRACTOR
AFFORDABLE HAZARDS REMOVAL, INC.
121 EAST GRAND STREET
MONTICELLO IOWA 52310
BY:
CERTIFICATION
(for Corporation)
that ' f�
Contractor was then �JJ2e
ATTEST:
, certify that I am the
of the Corporation named as Contractor herein,
----- who signed this agreement on behalf of the
of said corporation;
that said Agreement was duly signed for and in behalf of said Corporation by authority of
its governing body, and is within the scope of its corporate powers.
ND CORPORATE SEAL
ATTEST:
CITY OF WATERLOO
715 MULBERRY STREET
WATERLOO, IOWA 50703
BY:
rnest G. Clark, MAYOR
ATTEST:
Suzy Schar
, City Clerk
Asbestos Removal Contract 140 -AR -12 -05 -11 -GO
Address
Area
Location
Material
Approximate
Quantity
Cost to Remove
116 W. PARKER ST
KITCHEN
2ND FLOOR
BASEMENT
EXTERIOR
ROOF
FLOOR
BATH
DUCTS
SIDING
FLASHING
LINOLEUM
LINOLEUM
DUCT WRAP
TAR
TAR
96 SQ FT
64 SQ FT
190 SQ FT
200' X 1/2" FT
40 SQ FT
$1,950.00
312 CHARLES ST
BASEMENT
BASEMENT
PORCH
ROOF
EXTERIOR
DUCT WORK
DUCT WORK
ROOF
PENETRATIONS
WALLS
DUCT WRAP
DUCT TAPE
TAR
TAR
SLATE SIDING
10 SQ FT
70 SQ FT
26 SQ FT
10 SQ FT
3200 SQ FT
$5,250.00
318 E. 9TH ST
ROOF
ROOF
PENETRATIONS
DRIP EDGE
TAR
TAR
20 SQ FT
20 SQ FT
$300.00
332 IRVING ST
BASEMENT
BASEMENT
BASEMENT
PORCH
ROOF
DUCT WORK
FLOOR JOIST
FLUE VENT
FLASHING
PENETRATIONS
DUCT WRAP
DUCT WRAP
PACKING
TAR
TAR
120 SQ FT
8 SQ FT
110 SQ FT
18 SQ FT
40 SQ FT
$1,950.00
1114 JEFFERSON ST
2ND FLOOR
LIVING ROOM
1ST FLOOR
BASEMENT STAIRWAY
KITCHEN
1ST FLOOR
BATHROOM
EXTERIOR SIDING
EXTERIOR SIDING
VENT ON 2ND FLOOR
VENT IN LIVING ROOM
VENT NEAR OLD
BASEMENT STAIRWAY
SHEET FLOORING
BATHROOM
EXTERIOR SIDING
SOUTH ADDITION
HVAC WRAP
HVAC WRAP
HVAC WRAP
SHEET FLOORING -
CREAM/BLUE
SHEET FLOORING -
CREAM
TRANSITE SIDING WITH
STRAIGHT BOTTOM
TRANSITE SIDING WITH
WAW BOTTOM
BELOW
BELOW
60 SQ FT FOR ALL 3
HVAC WRAPS
150 SQ FT
70 SQ FT
1500 SQ FT
500 SQ FT
$4,850.00
1
Asbestos Removal Contract 140 -AR -12 -05 -11 -GO
Address
Area
Location
Material
Approximate
Quantity
Cost to Remove
1116-1118 JEFFERSON ST
BASEMENT
BASEMENT
BASEMENT
VARIOUS LOCATIONS
VARIOUS LOCATIONS
VARIOUS LOCATIONS
HVAC WRAP
HVAC WRAP
HVAC WRAP
BELOW
BELOW
12 SQ FT FOR ALL 3
$500.00
213 N. BARCLAY ST
LIVING ROOM
LIVING ROOM
KITCHEN
LIVING ROOM FLOOR
LIVING ROOM
DOORWAY
KITCHEN FLOOR
UNDER 12x12 FLOOR
TILE
FLOOR TILE -9x9 -BROWN
WITH STREAKS -NO
MASTIC DETECTED IN
MASTIC
HVAC WRAP
FLOOR TILE -9x9 -BROWN
NO ASBESTOS
DETECTED IN IN MASTIC
150 SQ FT
2 SQ FT
120 SQ FT
$950.00
129 RICKER ST
KITCHEN
1ST FLOOR
MIDDLE BEDROOM
VENT IN KITCHEN
VENT BELOW STEPS
VENT IN BEDROOM
HVAC WRAP
HVAC WRAP
HVAC WRAP
BELOW
BELOW
100 SQ FT FOR ALL 3
$1,000.00
135-137 UNIVERSITY AVE
NO ACM INDICATED IN 137
UNIVERSITY
1ST FLOOR SOUTH
ROOM
2ND FLOOR
BATHROOM
SOUTH ROOM VENT-
1ST FL OF 135
UNIVERSITY
BATHROOM VENT -2ND
FL OF 135 UNIVERSITY
HVAC
HVAC
BELOW
40 SQ FT FOR BOTH
$850.00
TOTAL BID PRICE:
$17,600.00I