Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Change Order-12122011
NOt Change Order c u irtli L [fo.( (LATH — 3191 PROJECT: (Name and address) Waterloo, City of Forestry Building Upgrades 1117 Campbell St. Waterloo, IA 50701 TO CONTRACTOR: (Name and address) CHANGE ORDER NUMBER: 2 DATE: November 18, 2011 ARCHITECT'S PROJECT NUMBER: 2011-0002 CONTRACT DATE: July 12, 2011 CONTRACTFOR: General Construction OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ FIELD D OTHER ❑ The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Change order approval for urethane insulation based on actual sq. ft to what was requested in bid. On the Bid form for interior wals the sq. ft. was 1,912 at $3.63/sq.ft. The actual was 2,850, difference of 938 sq. ft. at $3.63 = $3,404.94 _ The original (Contract Sum) ( ,afa - 4a im4441-Pricrr)-was The net change by previously authorized Change Orders The (Contract Sum) (Gt 'autei:dMaximmuPsice_) prior to this Change Order was The (Contract Sum) (guafturteed-Maxi t t-Pfise) will be (increased)-( ased)(-unc ged) by this Change Order in the amount of The new (Contract Sum) (GZuaranteed_Maximum fire)including this Change Order will be $ 95,410.00 $9,410.00 $ 3,404.00 $ 98,814,0.0 The.Contract Time will be (neetteed)-Et#ee ectsec (unchanged) by ( ) days The date of Substantial Completion as of the date of this Change Order therefore is (Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. AHTS Architects PLC Don Gardner Construction ARCHITECT (Firm name) 327 E. 4th St. Suite 204 Waterloo, IA 50703 ADDRESS �B7 (Signattnedf Larry R. Kurtz (Typed name) DATE CONTRACTOR (Finn name) 315 LaPorte Rd. Waterloo, IA 50702 ADDRESS BY (Stgnann-e) 44 Mark Gardner (Typed i tate) 1 on*//7 City of Waterloo OWNER (Firm ,tante) 1101 Campbell St. Wate inn, TA 50701 ADD�4" / /d; Y (Signature) Ernest G. Clark, Mayor (Typed name) DATE CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document 0701 TM+ -2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org.