HomeMy WebLinkAboutPeterson Contractors-FY16 11th St Bridge Joint Rprs Cont 890-4/17/2017CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT PROJECT: F.Y. 2016 11th STREET BRIDGE DECK JOINT REPAIRS CONTRACT NO. 890 Date Prepared: March23,2017 AMOUNT: $13,407.00 INCREASE TO: PETERSON CONTRACTORS, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated JULY 13, 2015. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items C. Settlement for cost of work to be made as follows: Compensation already made to contractor through bid items. See attached summary. BY: n li9N r"14 - 0")/1 . Mayor ATTEST: ,Il Ci y Clerk Date Final Quantity Adjustment Date TOTAL INCREASE $13,407.00 PETERSON CONTRACTORS, INC. CONTRACTOR TITLE: /11?!- 7 ' Date APPROVED: City Engineer Y/13//? D ate Cont. #890 Sheet 1 of 2 F.V. 2016 11th STREET BRIDGE DECK JOINT REPAIRS CONTRACT NO. 890 FINAL PERIOD: Due 30 Days from date of a ceptance of work Bid Item Bid Item Description Units Original Bid Quantity Final Quantity :.Quantity:' Difference PCI Unit Price PCI Unit Price Extended Increase / Decrease 1 Removals, As Per Plan LS 1.0 1.0 - 0.0 (. $ 18,000.00 $ 18,000.00 $ - 2 Structural Concrete (Miscellaneous) CY 10.3 10.3 0.0 $ 1,020.00 $ 10,506.00 $ - 3 Reinforcing Steel, Epoxy Coated LB 1,991.0 1,991.0 0.0 $ 2.75 $ 5,475.25 $ - 4 Structural Steel LB 1,050.0 1,050.0 rF'-'0.0 -: $ 16.50 $ 17,325.00 $ 5 Steel Extrusion Joint with Neoprene LF 126.0 126.0 - 0.0 $ 475.00 $ 59,850.00 $ 6 Neoprene Gland Installation and Testing LF 126.0 126.0 '. 0.0 $ 49.75 $ 6,268.50 $ - 7 Safety Closure EACH 4.0 4.0 0.01`. $ 250.00 $ 1,000.00 $ - 8 Traffic Control LS 1.0 1.0 -. 0.0 $ 3,000.00 $ 3,000.00 $ 9 Mobilization LS 1.0 1.0 1 0.0 $ 7,000.00 $ 7,000.00 $ 10 Repair Lateral Bracing (Quantity Adjustment) EACH 14.0 14.0 0.0 $ 1,905.00 $ 26,670.00 $ 1-1 Trail Closure Under Bridge LS 1.0 1.0 = 0.0 f $ 300.00 $ 300.00 $ - 2-1 Bridge Approach Sidewalk Remove and Replace LS 1.0 1.0 `-J0.0i $ 150.00 $ 150.00 $ - 3-1 Bridge Approach Pavement Remove and Replace LS 1.0 1.0 --';0.0- $ 7,242.00 $ 7,242.00 $ - 4-1 Repair Lateral Bracing (Quantity Adjustment) EACH 3.0 3.0 0,0 ` $ 1,905.00 $ 5,715.00 $ - $ 168,501.75 $ TOTAL ORIGINAL CONTRACT AMOUNT TOTAL PAY ESTIMATE 41 $ 119,695.77 PAY ESTIMATE 42 $ 31,955.81 RETAINAGE $ 16,850.17 TOTAL PAYMENTS $ 168,501.75 TOTAL ORIGINAL CONTRACT AMOUNT $ 155,094.75 CHANGE ORDER 41 (ITEM 1-1) $ 300.00 CHANGE ORDER 42 (ITEM 2-1) $ 150.00 CHANGE ORDER #3 (ITEM 3-1) $ 7,242.00 CHANGE ORDER #4 (ITEM 4-1) $ 5,715.00 NEW CONTRACT AMOUNT $ 168,501.75 FINAL NEW CONTRACT AMOUNT $ 168,501.75 FINAL QUANTITY SUMMARY $- FINAL CONTRACT AMOUNT $ 168,501.75 FINAL QTY. ADJ. Cont. 4890 Sheet 2 Of 2