Loading...
HomeMy WebLinkAbout2017-398-5/22/2017 Prepared by LeAnn M. Even, Deputy City Clerk, City of Waterloo, 715 Mulberry Street, Waterloo, IA 50703, (319) 291-4323. RESOLUTION NO. 2017-398 RESOLUTION ACCEPTING PROPOSAL FROM TERRACON FOR MATERIALS TESTING AND CONSTRUCTION OBSERVATION SERVICES IN CONJUNCTION WITH THE FY 2017 NORTHEAST INDUSTRIAL PARK SITE GRADING PROJECT, AND AUTHORIZE ENGINEERING TO EXECUTE SAID PROPOSAL. BE IT RESOLVED BY THE COUNCIL OF THE CITY OF WATERLOO,IOWA,that the proposal for construction, observation and materials testing services dated May 22, 2017, in conjunction with the FY 2017 Northeast Industrial Park Site Grading Project, by and between Terracon, Inc., of Cedar Falls, Iowa and the City of Waterloo, Iowa, is hereby approved and the Mayor and City Clerk are authorized and directed to execute the same on behalf of the City of Waterloo,Iowa. PASSED AND ADOPTED this 22nd day of May 2017. Quentin Hart,Mayor ATTEST: Kelley Fel City Cler