HomeMy WebLinkAboutRicklefs Excavating-8/17/2015CHANGE ORDER NO. 4 Owner City of Waterloo Date: July 30, 2015 Project LaPorte Road Pumping Station and Force Main Owner's Contract No. 847 Contractor: Ricklefs Excavating Date of Contact Start January 28, 2014 Contract Amount: $ 352,134.00 You are directed to make the following changes in the Contract Documents. Description: 4-1 6" Perforated Subdrain, installed, includes porous backfill and engineering fabric (1,250 LF @ $13.80/LF) $ 17,250.00 4-2 Class E Riprap, with Engineering Fabric (50 TON @ $34.00/TON) $ 1,700.00 4-3 Topsoil, Furnish and Spread (30 Tandem Axle Loads @ $395.00/Load) $ 11,850.00 4-4 Removal of Unsuitable Soil (20 Tandem Axle Loads @ $100.00/Load) $ 2,000.00 4-5 Wood Excelsior Mat (19,500 SF @ $0.28/SF) $ 5,460.00 4-6 Wood Excelsior Wattles (260 LF @ $4.50/LF) $ 1,170.00 4-7 Rural Seeding (20,000 SF @ $0.12/SF) $ 2,400.00 4-8 Trafiic Control (1 LS @ $425.00) $ 425.00 4-9 Mobilization (1 IS @ $2000.00) $ 2,000.00 4-10 Contractor Overhead and Profit (1 LS @ $6,188.25) $ 6,188.25 4-11 Cost of Bond Increase (1 LS @ $948.86) $ 948.86 TOTAL ADDITIONS $ 51,392.11 Reason for Change Order All Items The west ditch of Highway 218 north of Marigold Drive is continuously wet. As a result, the permanent seeding does not germinate. Since the ditch is not stabilized it is eroding. In order to stabilize this ditch and resolve this issue a perforated subdrain will be installed in the bottom of the ditch to handle the continuous daily flow. Once the subdrain is working and the ditch line dries out it will be restored with seed and wood excelsior mat and wattles will be placed across the ditch to stop erosion while the seed germinates. CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 352,134.00 Original Completion Date: 1 4/30/2014 Previous C.O.s (ADD/DEDUCT) $ 62,488.93 This C.O. (ADD/DEDUCT) $ 51,392.11 Revised Completion Date: 1 10/8/2014 Contract Price with all approved Change Orders: $ 466,015.04 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND CONVENANTS OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: L s I� Owner (Authorized Signature) Date ACCEPTED: BY: o , -0 3 -)5 Contractor (Authorized Signature) Date ACCEPTED: BY: AECOM Date AECOM 60311667 1 4 Project No. C.O. No. Letter of Transmittal TO: Mr. Larry Smith Water Pollution Control Facility 3505 Easton Avenue Waterloo, Iowa 50702 WE ARE SENDING YOU: D Attached ❑ Shop Drawings D Copy of Letter ❑ Prints ❑ Change Order XOM DATE: August 6, 2015 JOB ID NO. 60311667 ATTENTION: RE: La Porte Road Pump Station and Force Main City of Waterloo, Iowa ❑ Under Separate Cover Via El Plans El Samples the Following Items: ❑ Specifications Copies Date No. Description 3 Change Order No. 4 for Above -Referenced Project _ - THESE ARE TRANSMITTED AS CHECKED BELOW: D For Approval ❑ For Your Use ❑ As Requested E l For Review and Comment E l For Bids Due 20 ❑ Approved as Submitted ❑ Approved as Noted ❑ Returned for Corrections ❑x For Signature El Resubmit _ Copies for Approval ❑ Submit _ Copies for Distribution ❑ Return Corrected Prints ❑ Prints Returned After Loan to Us REMARKS: Larry -- The attached copies of Change Order No. 4 are for your use in preparing documents needed to submit to Council for approval. Please sign all three (3) copies of this Change Order, keep one (1) for your files and return two (2) to our office for further processing. If you have any questions, please let us know. COPY TO: SIGNED: TLA:blc 501 Sycamore Street, Suite 222 If enclosures are not as noted, kindly notify us at once. P.O. Box 1497 • Waterloo, Iowa 50704-1497 Todd L. Allyn, PE • (319) 232-6531 • Fax: (319) 232-0271