HomeMy WebLinkAboutAecom Technical Services-11/2/2015 (2)Letter of Transmittal
TO: Mr. Keith Kaspari
Director of Aviation
Waterloo Regional Airport
2790 Livingston Lane
Waterloo, Iowa 50703
WE ARE SENDING YOU:
O Attached
❑ Shop Drawings
❑ Copy of Letter
❑ Prints
❑ Change Order
-COM
DATE: October 30, 2015
JOB ID NO. 60340634
ATTENTION:
RE: Rehabilitation of Taxiway A and Crack Sealing Runway 12/30
Waterloo Regional Airport
FAA AIP Project No. 3-19-0094-044
❑ Under Separate Cover Via
E l Plans
❑ Samples
the Following Items:
0 Specifications
Copies
Date
No.
Description
5
Change Order No. 2 for Above -Referenced Project - Original Signature
5
Change Order No. 3 for Above -Referenced Project - Original Signature
THESE ARE TRANSMITTED AS CHECKED BELOW:
❑ For Approval
O For Your Use
O As Requested
O For Review and Comment
❑ For Bids Due
20
O Approved as Submitted
0 Approved as Noted
❑ Returned for Corrections
0
❑ Resubmit _ Copies for Approval
O Submit _ Copies for Distribution
O Return Corrected Prints
❑ Prints Returned After Loan to Us
REMARKS: These originals are provided to replace the alternative copies previously forwarded. If you have any questions,
please advise.
COPY TO: SIGNED: 1(
DBH:blc
/0- )Gt�i Li" (4tom)
David B. ughes, PE
If enclosures are not as noted, kindly notify us at once.
501 Sycamore Street, Suite 222 P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 • Fax: (319) 232-0271
CHANGE ORDER NO. 2
Owner Waterloo Regional Airport, City of Waterloo, Iowa Date October 26, 2015
Project Rehabilitation of Taxiway A
Owner's Contract No. FAA AIP Project No. 3-19-0094-044 Contractor Aspro, Inc.
Date of Contract Start September 12, 2015
You are directed to make the following changes in the Contract Documents. Description:
Item No.
Description
Unit
Unit Price
Quantity
Amount
102
Directional Bore 1 -2 Inch HPDE Conduit
LF
$ 13.20
100
$ 1,320.00
103
Airfield Electrical Handhole (L-867)
EA
$ 1,045.00
2
$ 2,090.00
Total Change Order $ 3,410.00
Reason for Change Order:
During construction it was determined that the conduit under Taxiway A located near Station 37+75 was
either collapsed or cable was fused within the duct and would not allow for the contractor to remove and
install the new airfield lighting power cable.
A new directional bore with a single conduit will be installed near this location to allow for new cable
installation.
Rehabilitation of Twy A CO -2 Project No — 60340634
& Crack Sealing Rwy 12/30
1
CONTRACT PRICE
Original: $ 861,208.50
Previous C.O.s (DEDUCT):$ 14,132.00
This C.O. (ADD): $ 3,410.00
Contract Price with all
approved Change Orders: $ 850,486.50
CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original:
Previous C.O.s (ADD):
This C.O. (ADD):
REVISED:
90
0
0
90
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: "2›.
Engineer (Authorized Signature)
APPROV
By: _�/0e-4711-
Owner (Authorized Signature)
ACCEPTED:
Con for (Authorized Signature)
Date
\1'z/
Date
/d/al iliS
Date
Rehabilitation of Twy A CO -2 Project No — 60340634
& Crack Sealing Rwy 12/30
2
CHANGE ORDER NO. 3 (NON-AIP)
Owner Waterloo Regional Airport, City of Waterloo, Iowa Date October 26, 2015
Project Rehabilitation of Taxiway A
Owner's Contract No. FAA AIP Project No. 3-19-0094-044 Contractor Aspro, Inc.
Date of Contract Start September 12, 2015
You are directed to make the following changes in the Contract Documents. Description:
Item No.
Description
Unit
Unit Price
Quantity
Amount
104
Provide 1 Additional 2 -Inch Conduit in Directional Bore
LF
$ 4.40
100
$ 440.00
Total Change Order $ 440.00
Reason for Change Order:
During construction it was determined that the conduit under Taxiway A located near Station 37+75 was
either collapsed or cable was fused within the duct and would not allow for the contractor to remove and
install the new airfield lighting power cable.
A new directional bore with a single conduit will be installed near this location to allow for new cable
installation as part of Change Order No. 2.
Change Order No. 3 will provide 1 spare conduit in the directional bore from Change Order No. 2.
Rehabilitation of Twy A CO -3 Project No — 60340634
& Crack Sealing Rwy 12/30
1
CONTRACT PRICE
Original: $ 861,208.50
Previous C.O.s (DEDUCT):$ 10,722.00
This C.O. (ADD): $ 440.00
Contract Price with all
approved Change Orders: $ 850,926.50
CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
Original:
Previous C.O.s (ADD):
This C.O. (ADD):
REVISED:
90
0
0
90
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CON TRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: � � .
Engineer (Authorized Signature)
APPRO
By:
Owner (Authorized Signature)
ACCEPTED:
By: _
Con tor (Authorized Signature)
Date
Date
ail
Date
Rehabilitation of Twy A CO -3 Project No — 60340634
& Crack Sealing Rwy 12/30
2