Loading...
HomeMy WebLinkAboutAecom Technical Services-11/2/2015 (3)Letter of Transmittal TO: Waterloo Regional Airport 2790 Livingston Lane Waterloo, Iowa 50703 WE ARE SENDING YOU: E l Attached ❑ Prints ❑ Shop Drawings ❑ Change Order ❑ Copy of Letter A=COM DATE: October 28, 2015 JOB ID NO.: ATTENTION: Mr. Keith Kaspari RE: Airfield Pavement Maintenance Management System Waterloo Regional Airport Waterloo, Iowa ❑ Under separate cover via O Plans 0 Samples 0 the following items: 0 Specifications COPIES DATE NO. DESCRIPTION 3 Agreements for Above -Referenced Project THESE ARE TRANSMITTED AS CHECKED BELOW: O For approval O For your use O As requested O Approved as submitted 0 Resubmit copies for approval ❑ Approved as noted 0 Submit copies for distribution O Returned for corrections 0 Return corrected prints ❑ For review and comment 0 O For Bids due 20 0 Prints returned after loan to us REMARKS: Upon approval, please return two (2) original executed agreements. We look forward to working with the Waterloo Regional Airport on this project. odCOPY TO: Mr. David Hughes, P.E. SIGNED: If enclosures are not as noted, kindly notify us at once. uglas W. Schindel, P.E. 501 Sycamore Street, Suite 222 • P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 • Fax: (319) 232-0271 A=COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com AIRFIELD PAVEMENT MAINTENANCE MANAGEMENT SYSTEM WATERLOO REGIONAL AIRPORT WATERLOO, IOWA Project Description - See Attachment and incorporated herein. Scope of Services - See Attachment and incorporated herein. Compensation Compensation for Services for this project shall be a lump sum fee of Ninety -Nine Thousand Eight Hundred Dollars ($99,800.00). See attachment and incorporated herein. General Conditions Except as specifically amended by this Individual Project Agreement, Services shall be provided in accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered between AECOM Technical Services, Inc. ("ATS"), and the City of Waterloo ("Client"), dated April 15, 2014. APPROVED: APPROVED: CITY OF WA RLOO, IOWA AECOM TECHNICAL SERVICES, INC. Ernest G. Clark Mayor Associate Vice President 12/(Date Date October 28, 2015 A. COM AIRFIELD PAVEMENT MAINTENANCE MANAGEMENT SYSTEM WATERLOO REGIONAL AIRPORT WATERLOO, IOWA I. Project Description The project is described as preparation of a Pavement Maintenance Management System for the entire airfield at the Waterloo Regional Airport, Waterloo, Iowa. The project involves an inventory of airside pavements, completion of a pavement condition index (PCI) survey, development of a record keeping system for future pavement inspection and maintenance, and preparation of an economic analysis and prioritization plan. II. Scope of Services The work to be performed by the Consultant shall encompass and include detailed work, services, materials, equipment and supplies necessary to provide a pavement maintenance management system in accordance with FAA requirements and AIP grant assurances. The project services shall be divided into the following tasks: A. Pavement Inventory. The Pavement Inventory section will define the structure of the pavement and separate the airfield into smaller manageable elements of pavement. The construction history of the elements will be identified, along with any unique pavement features. Pavements will be broken into elements and mapped for reference. A map of the airport will identify pavement elements and allow the individual performing maintenance inspections to quickly reference the pavement element by name and location. Pavement elements will be grouped according to the following features: 1. Location on Airfield 2. Pavement Type (Rigid, Flexible or Overlay) 3. Pavement Section (Surface, Base and Subbase) 4. Age of Pavement 5. Associated Funding Source 6. Allowable Pavement Loading B. Pavement Condition Index (PCI) Survey. The preparation of a PCI survey will be accomplished in accordance with ASTM D5340, Standard Test Method for Airport Pavement Condition Index Surveys. The PCI Survey includes the following tasks. 1. Identification of the branches, sections and individual sample units for the airfield pavement network. The airfield pavement network will include each runway, each taxiway and the various apron areas. Roadways and parking lots are not included in this survey. 2. Define the number and location of sample units necessary to provide a representative evaluation of each pavement section. 3. Field layout of the sample units to be surveyed. 4. Perform a visual survey of the representative sample units to identify and quantify the distress types and severity levels. In addition to the visual review, photographic documentation of failures in each sample unit will be performed. 5. Review field survey data and calculate PCI values for sample units. Extrapolate the sample unit data to determine a PCI value for the pavement sections. Using A=COM the data for the pavement sections, a PCI value will be determined for the pavement branch areas. If the data from an individual sample unit does not appear to be representative of the section, then additional sample units will be surveyed. In addition to the PCI values, PCN values will be calculated for the MD -83 aircraft as it is the designated critical design aircraft for the Waterloo Regional Airport as defined in the Master Plan. 6. Prepare airfield maps and charts to graphically depict the PCI values calculated. C. Record Keeping. According to the Advisory Circular, the airport needs to perform a PCI survey every three years or provide an inspection of the pavement annually. Drive-by inspection to detect unexpected changes in pavement condition should be conducted on a monthly basis. The airport must record and keep on file for a minimum of 5 years complete information about detailed inspections and maintenance performed. The types of distress, their locations, and remedial action, scheduled or performed, must be documented. This task consists of providing inspection report forms and maintenance documentation forms that can be used by the airport staff. In addition, as part of this task a future inspection schedule will be developed. D. Programming. This task consists of performing an economic analysis on the data collected by the PCI survey and developing a Tong -term maintenance and rehabilitation program for the airfield pavements. Programming includes the following tasks: 1. Prepare Cost Estimates for Maintenance. 2. Prepare Cost Estimates for Rehabilitation. 3. Prioritize Maintenance and Rehabilitation Based on PCI Values and Funding Availability. E. Meetings. This task consists of meetings and presentations related to the development of the Pavement Maintenance Management System for the Waterloo Regional Airport. F. Quality Review. This task consists of the quality review of work elements on the project. During the course of this project, quality reviews will be conducted by senior technical personnel that are not directly involved in the project. G. Administration. This task consists of administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. This task includes providing 5 copies of the final Pavement Maintenance Management System report. O:\AdministrationWGREE\PROF\WatAir Airfield Pavement Maintenance Management System.doc Airfield Pavement Maintenance Management System Waterloo Regional Airport Waterloo, Iowa Consultant Cost Summary I. Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 80 $77.30 $6,184.00 Project Professional 100 $54.65 $5,465.00 Staff Professional 120 $43.35 $5,202.00 Professional 120 $34.40 $4,128.00 CADD Operator II 120 $33.10 $3,972.00 CADD Operator I 0 $23.40 $0.00 Senior Technician 120 $33.80 $4,056.00 Technician 120 $24.85 $2,982.00 Project Support 50 $29.15 $1,457.50 $33,446.50 830 II. Payroll Burden and Overhead Costs 149.10% $49,868.73 III. Direct Project Expenses Category Units Rate/Unit Amount Mileage 4000 0.575 2,300.00 Per Diem 0 40.00 0.00 Lodging 0 80.00 0.00 B/W Copies 3,000 0.06 180.00 Color Copies 0 0.22 0.00 Plan Copier 500 0.50 250.00 EDM Equipment 0 12.50 0.00 GPS Equipment 32 25.00 800.00 Nuclear Density Guage 0 40.00 0.00 Miscellaneous, Other 450.00 $3,980.00 IV. AECOM Estimated Actual Costs $87,295.23 Rounded $87,300.00 V. Subcontract Expense $0.00 VI. Estimated Actual Costs $87,300.00 VII. Fixed Fee (15% of Items I & II) $12,500.00 VIII. Maximum Amount Payable (Lump Sum) $99,800.00 Airfield Pavement Maintenance Management System Waterloo Regional Airport Waterloo, Iowa Staff Hour Estimate Item No. Description Senior Prof Project Prof Staff Prof Prof CADD Operator II CADD Operator I Senior Technician Technician Project Support Totals A PAVEMENT INVENTORY Location on Airfield 4 2 6 Pavement Type 4 2 6 Pavement Section 2 4 8 8 16 38 Pavement Age 2 4 8 8 22 Associated Funding Source 2 8 10 Allowable Pavement Loading 8 16 24 B PCI SURVEY Subdivide Airfield Pavement Network 2 4 8 8 32 54 Define Sample Units 2 4 8 8 12 34 Layout Sample Units in the Field 40 40 80 Field Survey of Pavement Distresses 2 4 8 8 80 80 182 Review Data and Calculate PCI Values 4 8 24 16 52 Prepare Maps and Charts for Summary 2 4 4 8 24 16 58 C RECORD KEEPING Create Inspection Forms 2 2 2 4 8 18 Create Maintenance Documentation Forms 2 2 2 4 8 18 Define Future Inspection Schedule 2 2 2 4 8 18 D PROGRAMMING Cost Estimates for Maintenance 4 8 8 8 28 Cost Estimates for Rehabilitation 4 8 24 16 52 Prioritize Maintenance & Rehabilitation 2 2 4 8 16 32 E MEETINGS 16 16 32 F QUALITY REVIEW 12 12 12 36 G ADMINISTRATION 12 18 30 Total Services 80 100 120 120 120 0 120 120 50 830