NARRATIVE A
Existing Conditions
The City of Waterloo downtown traffic signal system was last re -timed in 1999. Since the last re -timing
project was completed, street function and land uses have changed significantly. Some streets have
been converted from one-way to two-way operation. Developing new traffic signal timing plans for the
downtown system will better accommodate the current traffic patterns being experienced throughout
downtown. Traffic signal timing can be one of the most efficient means of reducing emissions. The
downtown traffic signal system is bounded by West 6th Street, Washington Street, MuIlan Avenue, and
Walnut Street.
Proposed Improvements
During peak hours, the downtown street system can experience significant congestion due to the volume
of traffic and the existing capacity of the corridors. The proposed project will be the first comprehensive
review of the traffic signal timing plans for the downtown system since 1999. Per the Institute of
Transportation Engineers, studies have shown that traffic signal timing improvements can result in
reduced travel times by 8 to 25%1.
The existing travel times, speeds, and travel profiles of the corridors have been measured using PC -
Travel software with GPS to determine existing conditions and will be measured again after the
improvements are in place to document the increased efficiency provided by the adaptive signal systems.
The average corridor speeds were used to help develop the Emission Reduction Calculations.
This project will include updated traffic signal timings for the base timing plans, clearance intervals,
coordination plans, and pedestrian timing plans. The engineering for the project will include data
collection, traffic modeling to determine improvements to the timings and plans, and assistance to the City
of Waterloo during implementation of the new information.
The primary goal of the project is to increase the efficiency of travel along the downtown Waterloo
corridors including reduced travel times, reductions in idle time and stops at intersections, and the
associated reduction of vehicle emissions. The secondary goal of the project is collect and study bicycle
and pedestrian traffic. If certain improvements are found to help lead to more non -motorized use, then
recommendations will be made for future projects. Increased share of pedestrian and bicycle traffic can
decrease mobile source pollution.
Financing
The improvement plan will cost approximately $150,000 to implement. The City of Waterloo is requesting
a total of $120,000 (80%) in Iowa's Clean Air Attainment Program (ICAAP) funds. The City will provide
the remaining project costs as the local match. An itemized breakdown is provided in Section C.
Long -Range Transportation Plan
The proposed improvements are consistent with the City's Comprehensive Plan and Iowa Northland
Regional Council of Governments' (INRCOG) Long Range Transportation Plan.
1
Institute of Transportation Engineers, "Benefits of Retiming Traffic Signals," 2005.
ICAAP — Downtown Traffic Signal Retiming September 2015
DETAILED MAP
B
ICfAP—op*nmwnTrafficSigna|Redming
September 2015
ITEMIZED BREAKDOWN OF TOTAL PROJECT COSTS C
$10,000 Travel Time / Delay Data Collection and Analysis
$80,000 ..... Intersection Data Collection
$5,000 Data Reduction
$15,000 Modeling & Analysis
$5,000 Design of Non -Motorized Traffic Data Collection and Analysis
$25,000 Non -Motorized Mid -Block Peak Hour Traffic Data Collection
$10,000 Non -Motorized Traffic Analysis
$5,000 Report & Recommendation
$20_000 .........._ Timing Implementation
$25,000 Project Planning, Coordination, and Management
$200,000 - Total
A brief outline of the work activities to be included as part of the project is as follows:
1. Traffic Counts — Utilize existing count data from City and Iowa DOT and supplement with new
counts as needed to identify peak traffic movements and daily traffic patterns.
2. Non -motorized Traffic — Collect data on pedestrian and bicycle traffic.
3. Functional Geometric Review — Review and verify auxiliary lane lengths, posted speeds, and
observed travel speeds.
4. Existing Signal Timings — Document and gather all existing signal timing data.
5. Timing Models — Use motorized and non -motorized traffic data, functional geometric data, and
existing signal timing plans to create base models for each traffic period. Develop optimized
timing plans which include phasing splits, cycle lengths, and offsets for each signalized
intersection.
6. Recommend Signal/geometric changes to accommodate pedestrian and bicyclist.
7. Timing Plan Implementation — Process timing model data, perform observation, and adjust
timings as needed based on field observations and traffic flow.
8. Travel Time Studies — Perform post improvement travel time studies to document improved travel
speeds and reduced stops/idling. Develop post summation to demonstrate benefits of project for
City use and submission to Iowa DOT ICAAP staff to document project benefits.
ICAAP — Downtown Traffic Signal Retiming September 2015
SCHEDULE D
PROPOSED PROJECT SCHEDULE
Downtown Traffic Signal Retiming Project
CITY OF WATERLOO, IA
ICAAP Funding Application
ICAAP Project Evaluation & Notification of Commission Action
DOT Agreement Exchange
FHWA authorization
Consultant Selection
Design and Data Collection
Analysis and Report
Final Reviews to Iowa DOT
Project Implementation
Post Measurements
October 2015
October 2015 — March 2016
October 2016- February 2016
February -2016 -March 2016
March 2016
April 2016 — October 2016
Nov. 2016 — February 2017
March 2017
April 2017 — May 2017
September 2017
ICAAP — Downtown Traffic Signal Retiming September 2015
OFFICIAL CERTIFICATION E
ICAAP — Downtown Traffic Signal Retiming September 2015
ADOPTED FORMAL RESOLUTION FROM MPO F
ICAAP — Downtown Traffic Signal Retiming September 2015
RESOLUTION OF THE
BLACK HAWK COUNTY METROPOLITAN AREA
TRANSPORTATION POLICY BOARD
WHEREAS, the Black Hawk County Metropolitan Area Transportation Policy Board (MPO)
is the designated Metropolitan Planning Organization for the urbanized area of Black
Hawk County, Iowa, which includes Waterloo; and
WHEREAS, the Iowa Department of Transportation administers the Iowa Clean Air
Attainment Program (ICAAP) and awards funding to projects that will relieve traffic
congestion and improve air quality; and
WHEREAS, the traffic signal retiming project in downtown Waterloo will help achieve
these goals for the City of Waterloo and improve traffic flow for the area; and
WHEREAS, the traffic signal retiming project conforms to the MPO`s transportation
planning process and Long Range Transportation Plan.
NOW, THEREFORE, BE IT RESOLVED that the Black Hawk County Metropolitan Area
Transportation Policy Board supports the application of the City of Waterloo for ICAAP
funding for the traffic signal retiming project.
PASSED AND ADOPTED this 12 day ofbee; 2013.
Buck Clark, Chair
Attest:
Kevin Blanshan, INRCOG Executive Director
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS G
The following calculations represent the specific emission reductions expected as a result of traffic signal
retiming in downtown Waterloo.
Traffic volumes used in the emission reduction calculations were existing 2009 traffic volume counts from
the Iowa Department of Transportation Traffic Flow Maps. Where peak hour turning movement counts
were not available an 8.5% peak hour of ADT value was assumed as this value aligns with locations
where peak hour turning movement counts were available.
Average speed data was obtained from travel time studies conducted by Shive-Hattery on behalf of the
City of Waterloo E_or hepar oce _of_th_e e calculations PC -Travel software with GPS was used to
determine existing conditions. For the purpose of these calculations it was assumed that the average
speed in the corridors would increase by approximately 15% based on previous studies of similar signal
optimization type projects. The projected average speed was capped at the posted speed limit or existing
travel speed if exceeding posted speed. According to the Institute of Transportation Engineers, traffic
signal improvements such as retiming typically reduce travel time between 8 to 25 percent'
Emission factors in grams/mile for hydrocarbons volatile organic compounds (VOC(HCs)), carbon
monoxide (CO), and Nitrogen Oxide (NO,) were developed from the EPA's MOBILE 6.2 air quality model.
The Iowa Department of Transportation provided outputs of the model for operating speeds along city
arterials.
Institute of Transportation Engineers, "Benefits of Retiming Traffic Signals," 2005.
ICAAP — Downtown Traffic Signal Retiming September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS
G
Cost Effectiveness of Total Emission Reductions
A summation of annual emission reductions (kg/yr) for each of the road segments that will experience
improved traffic flow and delay reduction due to the timing and coordination plans of a downtown traffic
signal system retiming plan. For specific emission reduction calculations on each road segment, see the
following worksheets.
, Esti 'mated,KE,missions'Redusti ons
VOC ItC
$3 V `NOXA -
SCO
Segment 1) MuIlan Ave - daily reduction (kg/yr)
0
0 0
0
^ i-iyfedttetierr
Vie'-;r^r";"==` fkgArr)-
— -34—
—9— 7
—0
Segment 3) 5th Street-- daily reduction (kg/yr)
37
118 21
0
Segment 4) 6th Street - daily reduction (kg/yr)
41
132 24
0
Segment 5) Franklin Street - daily reduction (kg/yr)
12
38 7
0
Segment 6) Washington Street - daily reduction (kg/yr)
49
166 27
0
Total Annual Reduction (kg/yr)
172
445 85
0
Cost Effecti eness
Total Estimated Project Cost
$150,000
Effective Project Life (years)
5
Annual Project Cost
$30,000
Annual Cost per kg of Reduced Pollutant ($/kg/yr)
$174.40
$67.481 $351.981
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS G
Mullan Ave, Washington St to Walnut St
Traffic Signal Retiming
...Carr''do;r:
Corridor Length (miles)
0.72
Average Daily Traffic (ADT)
9,700
Vehicle Miles Traveled (VMT)
6,984
Peak hour VMT
573
Off -Peak Hour VMT
6,411
Peak Hour of ADT
8.2%
Esfima edlEmissrons ,Exrsti,n• Conditions
screed,
Avg. Speed - Peak Hour (mph)
36
Avg. Speed - Off -Peak Hour (mph)
37
Emission Factor - Peak Hour (g/mi)
1.607
12.661
1.733 563.190
Emission Factor - Off -Peak Hour (g/mi)
1.595
12.765
1.739
563.190
Peak Hour Emissions = Peak VMTx EF (g)
921
7,255
993
322,708
Off -Peak Emissions = Off -Peak VMTx EF (g)
10,226
81,836
11,149
3,610,611
Daily Emissions = Emissions (g/day)
11,146
89,091
12,142
3,933,319
,Estrrriated
mis_stonso-
r7 proAtemjents
Avg. Speed - Peak Hour (mph)
36
Avg. Speed - Off -Peak Hour (mph)
37
Emission Factor - Peak Hour (g/mi)
1.607
12.661
1.733 563.190
Emission Factor- Off -Peak Hour (g/mi)
1.595
12.765
1.739
563.190
Peak Hour Emissions = Peak VMTx EF (g)
921
7,255
993
322,708
Off -Peak Emissions = Off -Peak VMTx EF (g)
10,226
81,836
11,149
3,610,611
Daily Emissions = Emissions (g/day)
11,146
89,091
12,142
3,933,319
Estimated. missions:,Reductio''s'
VOCG HC
Daily Emissions Reduction (g/day)
0
0
0
Annual Reduction = daily reduction x 365 (kg/yr)
0
0
0
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS G
1st Street, Washington St to Walnut St
Traffic Signal Retiming
RCorErrdor Data:`
Corridor Length (miles)
0.72
Average Daily Traffic (ADT)
7,220
Vehicle Miles Traveled (VMT)
5,198
Peak hour WIT
442
Off -Peak Hour VMT
4,756
% Peak Hour of ADT
8.5%
Estimated
Emfssior,.
Exisiin:
Concitio
Avg. Speed - Peak Hour (mph)
Avg. Speed - Off -Peak Hour (mph)
Emission Factor - Peak Hour (g/mi)
Emission Factor - Off -Peak Hour (g/mi)
Peak Hour Emissions = Peak VMTx EF (g)
Off -Peak Emissions = Off -Peak VMTx EF (g)
Daily Emissions = > Emissions (g/day)
12.537 1.737 563.190
12.547 1.730 563.190
5,541 768 248,930
59,679 8,229 2,678,757
65,220 8,996 2,927,687
Estima_e•Emissrons.- Post lrnpa goOps,s'- • Speed(HO',
N
Avg. Speed - Peak Hour (mph)
35
Avg. Speed - Off -Peak Hour (mph)
35
Emission Factor - Peak Hour (g/mi)
1.620
12.551
1.727 563.190
Emission Factor - Off -Peak Hour (g/mi)
1.620
12.551
1.727
563.190
Peak Hour Emissions = Peak VMTx EF (g)
716
5,548
763
248,930
Off -Peak Emissions = Off -Peak VMTx EF (g)
7,705
59,698
8,214
2,678,757
Daily Emissions = > Emissions (g/day)
8,421
65,245
8,978
2,927,687
Estima ed Emissions R.edu tions
S seed
VOC
N CIX,
Daily Emissions Reduction (g/day)
93 -25
19
0
Annual Reduction = daily reduction x 365 (kg/yr)
-9
7
0
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS
G
5th Street, Washington St to Walnut St
Traffic Signal Retiming
gra dorData,
Corridor Length (miles)
0.72
Average DailyTraffic(ADT)
6,200
Vehicle Miles Traveled (VMT)
4,464
Peak hourVMT
379
Off Peak Hour VMT
4,085
_. ____ ____ ____ __z_T_
Peak Hour of ADT
8.5%
ENT pig, Emission Exr'sti`r g Got i f onss
Speed
U®C I
: A
C®
xNOX f
Avg. Speed - Peak Hour (mph)
27
Avg. Speed - Off -Peak Hour (mph)
29
Emission Factor - Peak Hour (g/mi)
1.769
12.723
1.779
563.190
Emission Factor- Off -Peak Hour (g/mi)
1.727
12.587
1.755
563.190
Peak Hour Emissions = Peak VMTx EF (g)
670
4,822
674
213,449
Off -Peak Emissions = Off -Peak VMTx EF (g)
7,055
51,418
7,169
2,300,631
Daily Emissions =2 Emissions (g/day)
7,725
56,240
7,843
2,514,080
°3"X^r�ai ,F fi2"`^t ;x. . � .r" R. 'si% "# o.;
E�st.1rr,ta ed Emnissioi Pos l np pa e m
t ��fWt p
� .•
3'sd
3i'N sa` Y �. �C
t.' Wig' � >` c_
Avg. Speed - Peak Hour (mph)
30
Avg. Speed - Off -Peak Hour (mph)
30
Emission Factor- Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Emission Factor- Off -Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Peak Hour Emissions = Peak VMTx EF (g)
647
4,747
661
213,449
Off -Peak Emissions = Off -Peak VMTx EF (g)
6,977
51,169
7,124
2,300,631
Daily Emissions =2 Emissions (g/day)
7,625
55,916
7,785
2,514,080
.... ' Eis.im#ted, EmissionsReduc ions
Soeed
VOC$HC
OX. r ry rC® r;
Daily Emissions Reduction (g/day)
101
324
58
0
Annual Reduction = daily reduction x 365 (kg/yr)
37
118
21
0
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming
September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS
G
6th Street, Washington St to Walnut St
Traffic Signal Retiming
J N ` vrCmo i . o rD ta�,,,a
Corridor Length (miles)
0.72
Average Daily Traffic (ADT)
7,520
Vehicle Miles Traveled (VMT)
5,414
Peak hour VMT
460
Off -Peak Hour VMT
4,954
Peak Hour of ADT
8.5%
Esti'matsed Emissrons- Existt`rr won' ®'tic n .,..Spee
a
VOA H ry .
CO
Avg. Speed - Peak Hour (mph)
28
Avg. Speed - Off -Peak Hour (mph)
29
Emission Factor- Peak Hour (g/mi)
1.748
12.653
1.767
563.190
Emission Factor- Off -Peak Hour (g/mi)
1.727
12.587
1.755
563.190
Peak Hour Emissions = Peak VMTx EF (g)
804
5,820
813
259,067
Off -Peak Emissions = Off -Peak VMTx EF (g)
8,556
62,361
8,695
2,790,269
Daily Emissions = y Emissions (g/day)
9,360
68,181
9,508,
3,049,336
Es i ate d Emissions 'Post l rn0rrovern eat =E,
S,aee®_s
V"O( HC
,;N.01(...$,
Avg. Speed - Peak Hour (mph)
30
Avg. Speed - Off -Peak Hour (mph)
30
Emission Factor - Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Emission Factor - Off -Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Peak Hour Emissions = Peak VMTx EF (g)
786
5,762
802
259,067
Off -Peak Emissions = Off -Peak VMTx EF (g)
8,462
62,059
8,640
2,790,269
Daily Emissions = 1 Emissions (g/day)
9,248
67,821
9,443
3,049,336
Estim ed Ekkrssions-Recducions
"r °eed>
VOC 'He
,
NOX
Daily Emissions Reduction (g/day)
113
361
65
0
Annual Reduction = daily reduction x 365 (kg/yr)
41
132
24
0
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming
September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS
G
Franklin St, Mullan Ave to 6th St
Traffic Signal Retiming
:nab
Corridor Length (miles)
0.5
Average Daily Traffic (ADT)
12,170
Vehicle Miles Traveled (VMT)
6,085
Peak hour VMT
523
Off -Peak Hour VMT
5,562
Peak Hour of ADT
8.6%
m` sem:
Esti a ed Emission ; Exrstinfi: Cmn • itions
S • ed
,
VOC ,HC
r r{
NOX
'CO
Avg. Speed - Peak Hour (mph)
27
Avg. Speed - Off -Peak Hour (mph)
30
Emission Factor- Peak Hour (g/mi)
1.769
12.723
1.779
563.190
Emission Factor - Off -Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Peak Hour Emissions = Peak VMTx EF (g)
925
6,654
930
294,548
Off -Peak Emissions = Off -Peak VMTx EF (g)
9,500
69,670
9,700
3,132,463
Daily Emissions =I Emissions (g/day)
10,425
76,324
10,631
3,427,011
Esti ate' d Emissions POs Im rove`;, enfsfras
k Seed
Avg. Speed - Peak Hour (mph)
30
Avg. Speed - Off -Peak Hour (mph)
30
Emission Factor- Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Emission Factor- Off -Peak Hour (g/mi)
1.708
12.526
1.744
563.190
Peak Hour Emissions = Peak VMTx EF (g)
893
6,551
912
294,548
Off -Peak Emissions = Off -Peak VMTx EF (g)
9,500
69,670
9,700
3,132,463
Daily Emissions =I Emissions (g/day)
10,393
76,221
10,612
3,427,011
,v.„Estima ed''Esniss''onReduiction•`
?.S.eed
VOGI HC
l ®
NOX
Daily Emissions Reduction (g/day)
32
103
18
0
Annual Reduction = daily reduction x 365 (kg/yr)
12
38
7
0
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming
September 2015
CALCULATIONS FOR VEHICLE EMISSIONS REDUCTIONS
G
Washington St, Mullan Ave to 6th St
Traffic Signal Retiming
Corridor Length (miles)
Average Daily Traffic (ADT)
Vehicle Miles Traveled (VMT)
Peak hourVMT
Off -Peak Hour VMT
Peak Hour of ADT
0.5
2,680
1,340
11
1,226
8.50%
tlrnatedEm ssi`onsE i'stifl!: Cond ti
Avg. Speed - Peak Hour (mph)
Avg. Speed - Off -Peak Hour (mph)
Emission Factor - Peak Hour (g/mi)
Emission Factor - Off -Peak Hour (g/mi)
Peak Hour Emissions = Peak VMTx EF (g)
Off -Peak Emissions = Off -Peak VMTx EF (g)
Daily Emissions =2 Emissions (g/day)
Avg. Speed - Peak Hour (mph)
13
16.077 2.180
1.818 12.881 1.806
288 1,833 249
2,229 15,792 2,214
2,517 17,625 2,463
563.190
563.190
64,204
690,471
754,675
Avg. Speed - Off -Peak Hour (mph)
Emission Factor- Peak Hour (g/mi)
Emission Factor - Off -Peak Hour (g/mi)
Peak Hour Emissions = Peak
Off -Peak
563.190
563.190
64,204
690,471
Daily Emissions = > Emissions (g/day)
Daily Emissions Reduction (g/day)
754,675
Annual Reduction = daily reduction x 365 (kg/yr)
133 456 73
49 166 27
Note: Emission factors are obtained from the 2008 Arterial Street Vehicle Emissions Table provided by the
Iowa Department of Transportation.
ICAAP — Downtown Traffic Signal Retiming
September 2015
0
MINORITY IMPACT STATEMENT H
ICAAP — Downtown Traffic Signal Retiming September 2015
owAooT
Form 105101 (03-09)
MINORITY IMPACT STATEMENT
Pursuant to 2008 Iowa Acts, HF 2393, Iowa Code Section 8.11, all grant applications submitted to the
state of Iowa that are due beginning January 1, 2009 shall include a Minority Impact Statement. This is
the state's mechanism for requiring grant applicants to consider the potential impact of the grant project's
proposed programs or policies on minority groups.
Please choose the statement(s) that pertains to this grant application. Complete all the
information requested for the chosen statement(s). Submit additional pages as necessary.
❑ The proposed grant project programs or policies could have a disproportionate or unique positive
impact on minority persons.
Describe the positive impact expected from this project.
Indicate which group is impacted:
❑ Women ❑ Persons with a disability ❑ Blacks ❑ Latinos ❑ Asians
❑ Pacific Islanders ❑ American Indians ❑ Alaskan Native Americans ❑ Other
❑ The proposed grant project programs or policies could have a disproportionate or unique negative
impact on minority persons.
Describe the negative impact expected from this project.
Present the rationale for the existence of the proposed program or policy.
Page 5 of 6
Provide evidence of consultation with representatives of the minority groups impacted.
Indicate which group is impacted:
❑- Women a Persons with a disability TJ Blacks 0 Latinos f Asians
❑ Pacific Islanders ❑ American Indians ❑ Alaskan Native Americans ❑ Other
The proposed grant project programs or policies are not expected to have a disproportionate or
unique impact on minority persons.
Present the rationale for determining no impact. Traffic signal timing improvement will benefit all users
regardless of minority status.
I hereby certify that the information on this form is complete and accurate, to the best of my knowledge:
Name: Mohammad Elahi iV .um Qdd
Title: Traffic Engineer
Definitions
"Minority Persons," as defined in Iowa Code Section 8.11, means individuals who are women, persons
with a disability, Blacks, Latinos, Asians or Pacific Islanders, American Indians, and Alaskan Native
Americans.
"Disability," as defined in Iowa Code Section 15.102, subsection 7, paragraph "b," subparagraph (1):
b. As used in this subsection:
(1) "Disability" means, with respect to an individual, a physical or mental impairment that
substantially limits one or more of the major life activities of the individual, a record of physical or
mental impairment that substantially limits one or more of the major life activities of the
individual, or being regarded as an individual with a physical or mental impairment that
substantially limits one or more of the major life activities of the individual.
"Disability" does not include any of the following:
(a) Homosexuality or bisexuality.
(b) Transvestism, transsexualism, pedophilia, exhibitionism, voyeurism, gender identity disorders
not resulting from physical impairments or other sexual behavior disorders.
(c) Compulsive gambling, kleptomania, or pyromania.
(d) Psychoactive substance abuse disorders resulting from current illegal use of drugs.
"State Agency," as defined in Iowa Code Section 8.11, means a department, board, bureau, commission,
or other agency or authority of the state of Iowa.
Page 6 of 6
ATTACHMENT A- ITEMIZED COSTS
TASK
TASK DESCRIPTION
ESTIMATED COST
1
Travel Time / Delay Data Collection and Analysis
10,000
2
Intersection Data Collection
80,000
3
Data Reduction
5,000
4
Modeling & Analysis
15,000
5
Design of Non -Motorized Traffic Data Collection and Analysis
5,000
6
N.on4AA.otoxlzed Mit-Block Peak Hour Traffic Data Collection_
75,0[0
7
Non -Motorized Traffic Analysis
10,000
8
Report & Recommendation
5,000
9
Timing Implementation
20,000
10
Fine Tuning, AM, Noon, PM, OFF PEAK
By City
11
Project Planning, Coordination, and Management
25,000
TOTAL:
$ 200,000
Form 230017wd
07-15
IOWA DOT
APPLICATION FORM FOR
IOWA CLEAN AIR ATTAINMENT PROGRAM (ICAAP) FUNDS
General Information
Applicant
Agency:
City of Waterloo
(Government Entity, Non -Profit Organization; or
Individuals)
Contact Person (Name & Mohammad Elahi, Traffic Engineer
Title):
Complete Mailing 625 Glenwood Street
Address:
Waterloo
City
e -Mail: mohammad.elahi@waterloo-
ia.org
Iowa
State
Street Address and/or Box No.
50703 319-291-4440
Zip Daytime Phone
If more than one agency or organization is involved in this project, please state the name, contact person, mailing
address, and telephone number of the second agency. (Attach an additional page if more than two agencies are
involved.)
Applicant Agency:
Contact Person (Name & Title):
Complete Mailing Address:
e -Mail:
Street Address and/or Box No.
City
Project Information
State
Zip Daytime Phone
Project Title2: Downtown Traffic Signal Retinmg
Project Description (including length, if applicable):
Retiming traffic signals in downtown Waterloo
*Project priority (1 = highest priority): (a sponsor submitting multiple applications in this funding cycle
must assign a numerical rank or priority to each application.)3
*Assign the proposed project to one or more of the following categories (check one or more):
❑ Transportation -Related Project in the State Implementation Plan (SIP) 0
❑ Transportation Control Measure (TCM)
® Traffic Flow Improvement (Intersection, Signalization, Other)
❑ Planning and Project Development
❑ Travel Demand Management (TDM)
O Transit -Related Improvement
Shared -Ride
O Bicycle or Pedestrian Facility or Program (circle one)
O Intermodal Freight or Passenger (circle one)
❑ Altemative Fuels
O Vehicle Inspection and Maintenance Program
❑ Outreach Activity (Education, Advertising, or Technical
Assistance
* Is the project consistent with the State Implementation Plan for air quality for non -attainment areas?
* Is the project consistent with the MPO's local Congestion Management Plan?
Page 1 of 6
Yes No
❑ ❑
0
Not Applicable
* Is the project consistent with the 0 MPO 0 RPA 0 statewide Long -Range Transportation Plan? ® 0 0
Notes: 1 Requires public agency as co-sponsor of application.
2 The term °project° means any ICAAP infrastructure or program proposal.
3 The Iowa Department of Transportation will use the priority ratings to reflect the sponsor.
Project Costs (An itemized breakdown must be included on an attached sheet):
Total Cost
Iowa Clean Air Attainment Program Fund Request
Applicant Match (20% Minimum)
1.
2.
3.
$ 200000
$ 160000
$ 40000
List All Applicant Match Sources
Amount
Assured or Anticipated
(Date Anticipated)
Sale of Bonds
$40,000.00
July 2016
Are any state funds involved in this project?
If yes, please explain the source and conditions
❑ Yes ® No
Are any other federal funds involved in this project?
If yes, please explain the source and conditions
❑ Yes ® No
Estimated Project Development Schedule:
Design Start Date March 1, 2016 Completion Date
Land Acquisition Start Date Completion Date
Construction Start Date April 1, 2017 Completion Date
Has any part of this project been started?
If yes, explain
❑ Yes ® No
March 31, 2017
May 31, 2017
How do you plan to measure the success of this project?
Conduct travel time / delay before and after studies.
Page 2 of 6
9Jo£Oki
Required Documentation and Narrative Information
The following documents and narratives must be attached to this application. In the upper right-hand corner of each
document or narrative write the corresponding letter shown below.
® A. A NARRATIVE assessing existing congestion/air quality conditions, outlining the concept of the proposed
project, and providing adequate project justification. How will this project reduce congestion, reduce travel or
single occupant vehicle usage, and/or improve air quality? Which transportation -related pollutant(s) are
being addressed: carbon monoxide, ozone, or PM?
B. A DETAILED MAP identifying the location of the project and clearly differentiating the subject project from
any past or future project phases.
® C. An ITEMIZED BREAKDOWN of the total project costs. This documentation does not need to be a detailed,
line -item type of estimate. However, it must accomplish two objectives: first, it must show the method by
which the cost estimate was prepared; and second it must enable a reviewer to determine if the cost
estimate is reasonable. The manner in which these objectives are achieved may vary widely depending on
the type, scope and complexity of the project. Absent a fully itemized list of costs, some general guidelines
for possible methods of estimating each type of project cost are provided on Attachment A.
® D. A TIME SCHEDULE for the total project development.
E. An OFFICIAL CERTIFICATION from the applicant's governing body (authority) that it shall:
(1) commit the necessary local matching funding for project implementation and
(2) upon project completion, be responsible for adequately maintaining and operating the project for
public use during the project's useful life.
® F. AN ADOPTED FORMAL RESOLUTION from the appropriate MPO or RPA declaring the sponsor's
proposed project or program conforms to the MPO's or RPA's regional transportation planning process. (For
MPOs, the project or program must be identified in the fiscally -constrained transportation plan and, if
applicable, the congestion management plan in TMAs.)
• G. CALCULATIONS for vehicle emission reductions and total project cost effectiveness for the targeted
pollutants. Project applicant must show through a quantitative analysis how many kilograms of pollutant will
be reduced (CO, VOC, NOx, and, if applicable, PM). Project sponsor must calculate the cost effectiveness
of the project by: Dividing the total annualized project cost by the number of kilograms per year of pollutant
reduced ($ per kg). Applicant must also show all assumptions and source of data used to calculate the
estimates. The applicant must use the most current vehicle emission factors developed by the Iowa DNR
and consistent with EPA's MOBILE 6.2 air quality model. These emission factors are periodically updated
and may be obtained from the Iowa DOTS ICAAP website at:
http://www.iowadot.gov/systems planning/icaap.htm.
s1
H. Completed MINORITY IMPACT STATEMENT attached to application.
The award of Iowa Clean Air Attainment funds; any subsequent funding or letting of contracts for design,
construction, reconstruction, improvement, or maintenance; and the furnishing of materials shall not involve direct or
indirect interest of any state, county, or city official, elective or appointive. All of the above are prohibited by Iowa
Code Sections 314.2, 362.5, or 331.342. Any award of funding or any letting of a contract in violation of the foregoing
provisions shall invalidate the award of Iowa Clean Air Attainment Program funding and authorize a complete
recovery of any funds previously disbursed.
Certification
To the best of my knowledge and belief, all information included in this application is true and accurate, including the
commitment of all physical and financial resources. This application has been duly authorized by the participating
local authority. I understand the attached OFFICIAL ENDORSEMENT(S) binds the participating local governments to
assume responsibility for adequate maintenance of any new or improved facilities.
If ICAAP funding assistance is approved for the project described in this application, I understand that an executed
contract between the applicant and the Iowa Department of Transportation is required before such funding assistance
can be authorized for use in implementing the project.
Representing the City of Waterloo
(Name of Applicant's Governing Authority)
Signature
Earnest G. Clark
►vel zt l c
Date
September 22, 2015
Typed Name and Title Typed Date