Loading...
HomeMy WebLinkAboutModus Engineering-10/5/2015September 23, 2015 Craig Clark City of Waterloo 715 Mulberry Street Waterloo, IA 50703 Subject: Dear Craig: Five Sullivan Brothers Convention Center - Boiler Replacement I am pleased to offer you this engineering service proposal for the above-mentioned project. This proposal includes design development, contract documents, bidding assistance, submittal reviews and on-site meetings with construction personnel as required to clarify issues of design. This proposal also includes the following: Replace existing hot water boilers with new higher efficiency boilers Replace the existing base mounted heating pumps with new pumps. Replace piping and control valves to pipe mains. Evaluate the existing combustion air fan and modify as required. Evaluate the existing boiler room exhaust fan and modify as required. Integrate Trane DDC with new equipment. Evaluate the existing water cooled chiller that serves the kitchen AHU and modify as required. Upgrade the existing motor control center. Equipment power Emergency boiler shut off buttons. AutoCAD drawing created from past building remodeling projects will be used Printing and reproduction of plans and specifications necessary for coordination and review during the design process are included. This proposal does not include the following services: Architectural and structural engineering services (none expected) Telecommunication, video, network, etc. design. Fees, permit costs or other costs associated with review or applications to goveming bodies 130 EAST 3RD ST STE 300 DES MOINES, IOWA 50309 TEL 5 15.251 7280 118 EAST COLLEGE ST STE 200 IOWA CIT(, IOWA 52240 TEL 319 248 4600 214 EAST 4TH ST WATERLOO, IOWA 50703 TEL 319.2350650 Distribution and document reproduction expenses Life cycle cost analysis for utility rebates or energy code approval Commissioning services For the above -referenced services our fee will be $78,680.00. Additional services, as approved and requested, shall be provided at our hourly rates. MODUS Errors and Omissions Policy shall be deemed a part of this Agreement. Scheduled reimbursables in this agreement shall match the scheduled reimbursables within the owner/architect agreement. The AIA B101 (2007) Standard Form of Agreement Between Owner and Architect shall be deemed a part of this letter. Sincerely, gidlVa d • 4/44— Michael J. Brocka, P.E. MJB/dmk If you are in agreement, please sign this letter and retum a copy to our office. This will serve as our written contract. SIGNATURE DATE MAYOR 130 EAST 3RD ST STE 300 DES MOINES. IOWA 50309 TEL 515.251 7280 DATE 18 EAST COLLEGE ST Sit 200 IOWA CITY, IOWA 52240 TEL 319 248 4600 214 EAST 4TH ST WATERLOO, IOWA 50703 TEL 319 235 0650