HomeMy WebLinkAboutPeterson Contracters Inc.-6/29/2015CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 3 PROJECT: F.Y. 2014 4th Street Bridge Slope Protection and Riverwall Repairs Date Prepared: June 22, 2015 AMOUNT: $ 6,141.62 Increase TO: Peterson Contractors Inc. , Contractor Please return this copy to: -- City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 1, 2014. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid items. See attached summary. Total Net Increase $ 6,141.62_ CITY OF WATERLOO BY: Peterson Contractors Inc Mayor Date PRINTED NAME: Co rd C 1 1 Q Pt -LEI -son TITLE: TITLE: Pr€ Ca end APPROVED: City of Waterloo Date PAY ESTIMATE FOR Peruid Ending: 22 -Jun -15 4TH STREET RIVERWALL RECONSTRUCTION Estimate No.: 6 - Final CITY OF WATERLOO Contractor. Peterson Contractors CITY CONTRACT NO. 855 AECOM NO. 60311495 ITEM NO. DESCRIPTION UNITS UNIT COST CONTRACT AUTHORIZED % COMPLETE ESTIMATED QUANTITY AMOUNT ESTIMATED QUANTITY AMOUNT 1 MOBILIZATION LS $ 22,000.00 1.0 $ 22,000.00 1.00 $ 22,000.00 100% 2 PAVEMENT REMOVAL SY $ 11.50 271.0 $ 3,116.50 271.00 $ 3,116.50 100% 3 RIVERWALL REMOVAL AND REPLACEMENT LS $ 58,500.00 1.0 $ 58,500.00 1.00 $ 58,500.00 100% 4 RIVERWALL REPAIRS SF $ 140.00 140.0 $ 19,600.00 169.00 $ 23,660.00 121% 5 CONCRETE SLOPE PROTECTION SY $ 115.00 271.0 $ 31,165.00 242.20 $ 27,853.00 89% 6 GRANULAR SUBBASE SY $ 32.50 271.0 $ 8,807.50 270.00 $ 8,775.00 100% 7 SUBDRAIN, LONGITUDINAL, 4 -IN DIAMETER LF $ 15.50 110.0 $ 1,705.00 110.00 $ 1,705.00 100% 8 SUBDRAIN, LONGITUDINAL, 6 -IN DIAMETER LF $ 20.00 25.0 $ 500.00 25.00 $ 500.00 100% 9 FLAP -GATE, 4 -IN DIAMETER EA $ 1,000.00 1.0 $ 1,000.00 1.00 $ 1,000.00 100% 10 STEEL HANDRAIL LF $ 172.00 110.0 $ 18,920.00 118.00 $ 20,296.00 107% 11 CONCRETE SEALER SF $ 1.00 3,450.0 $ 3,450.00 3450.00 $ 3,450.00 100% 12 HANDRAIL REMOVAL LF $ 8.25 110.0 $ 907.50 110.00 $ 907.50 100% 13 REMOVAL OF SIDEWALK SY $ 7.00 135.0 $ 945.00 33.40 $ 233.80 25% 14 SIDEWALK, PC CONCRETE, 5 IN. SY $ 52.00 135.0 $ 7,020.00 33.40 $ 1,736.80 25% ORIGINAL CONTRACT $ 177,636.50 $ 173,733.60 98% CHANGE ORDERS 1-1 ADDITIONAL MOBILIZATION (GROUTING SUBCONTRACTOR) LS $ 4,195.00 1.0 $ 4,195.00 1.00 $ 4,195.00 100% 1-2 CELLULAR GROUT CY $ 94.16 250.0 $ 23,540.50 352.00 $ 33,145.02 141% 1-3 ADDITIONAL EXCAVATION HRS $ 200.00 32.0 $ 6,400.00 17.50 $ 3,500.00 55% 1-4 DISPOSAL OF UNSUITABLE FILL LOADS $ 125.00 12.0 $ 1,500.00 24.00 $ 3,000.00 200% 1-5 BACKFILL MATERIAL CY $ 20.00 100.0 $ 2,000.00 192.00 $ 3,840.00 192% 1-6 ADDITIONAL STRUCTURAL CONCRETE LS $ 19,972.12 1.0 $ 19,972.12 1.00 $ 19,972.12 100% 2-1 EMERGENCY RIP RAP PLACEMENT LS $ 7,939.83 1.0 $ 7,939.83 1.00 $ 7,939.83 100% 2-2 REMOVAL OF RIP RAP LOADS $ 125.00 16.0 $ 2,000.00 16.00 $ 2,000.00 100% TOTAL CONTRACT $ 245,183.95 $ 251,325.57 103% PAY ESTIMATE FOR 4TH STREET RIVERWALL RECONSTRUCTION CITY OF WATERLOO CITY CONTRACT NO. 855 AECOM NO. 60311495 Peruid Ending: 22 -Jun -15 Estimate No.: 6 - Final Contractor: Peterson Contractors TOTAL EARNED TO DATE LESS RETAINAGE (5%) SUBTOTAL LESS PREVIOUS PAYMENTS DUE THIS ESTIMATE $251,325.57 $0.00 $251,325.57 $238,759.29 $12,566.28 AECOM Theresa Lu •.. ECOM, Construction Services AECOM, Project Engineer Peterson Contractor's Inc. Cordell 02 Peterson, president -'-IS' DATE DATE DATE e3 A- .r -- DATE FINAL QUANTITY SUMMARY 4TH STREET RIVERWALL RECONSTRUCTION CITY OF WATERLOO CITY CONTRACT NO. 855 AECOM NO. 60311495 ORIGINAL FINAL QUANTITY INCREASE/ ITEM NO. DESCRIPTION UNITS UNIT COST QUANTITY QUANTITY DIFFERENCE DECREASE FINAL AMOUNT 1 MOBILIZATION LS $ 22,000.00 1.0 1.00 0.00 $ - $ 22,000.00 2 PAVEMENT REMOVAL SY $ 11.50 271.0 271.00 0.00 $ - $ 3,116.50 3 RIVERWALL REMOVAL AND REPLACEMENT LS $ 58,500.00 1.0 1.00 0.00 $ - $ 58,500.00 4 RIVERWALL REPAIRS SF $ 140.00 140.0 169.00 29.00 $ 4,060.00 $ 23,660.00 5 CONCRETE SLOPE PROTECTION SY $ 115.00 271.0 242.20 -28.80 $ (3,312.00) $ 27,853.00 6 GRANULAR SUBBASE SY $ 32.50 271.0 270.00 -1.00 $ (32.50) $ 8,775.00 7 SUBDRAIN, LONGITUDINAL, 4 -IN DIAMETER LF $ 15.50 110.0 110.00 0.00 $ - $ 1,705.00 8 SUBDRAIN, LONGITUDINAL, 6 -IN DIAMETER LF $ 20.00 25.0 25.00 0.00 $ - $ 500.00 9 FLAP -GATE, 4 -IN DIAMETER EA $ 1,000.00 1.0 1.00 0.00 $ - $ 1,000.00 10 STEEL HANDRAIL LF $ 172.00 110.0 118.00 8.00 $ 1,376.00 $ 20,296.00 11 CONCRETE SEALER SF $ 1.00 3,450.0 3450.00 0.00 $ - $ 3,450.00 12 HANDRAIL REMOVAL LF $ 8.25 110.0 110.00 0.00 $ - $ 907.50 13 REMOVAL OF SIDEWALK SY $ 7.00 135.0 33.40 -101.80 $ (711.20) $ 233.80 14 SIDEWALK, PC CONCRETE, 5 IN. SY $ 52.00 135.0 33.40 -101.60 $ . (5,283.20) $ 1,738.80 CHANGE ORDERS 1-1 ADDITIONAL MOBILIZATION (GROUTING SUBCONTRACTOR) LS $ 4,195.00 1.0 1.00 0.00 $ - $ 4,195.00 1-2 CELLULAR GROUT CY $ 94.16 250.0 352.00 102.00 $ 9,604.52 $ 33,145.02 1-3 ADDITIONAL EXCAVATION HRS $ 200.00 32.0 17.50 -14.50 $ (2,900.00) $ 3,500.00 1-4 DISPOSAL OF UNSUITABLE FILL LOADS $ 125.00 12.0 24.00 12.00 $ 1,500.00 $ 3,000.00 1-5 BACKFILL MATERIAL CY $ 20.00 100.0 192.00 92.00 $ 1,840.00 $ 3,840.00 1-8 ADDITIONAL STRUCTURAL CONCRETE LS $ 19,972.12 1.0 1.00 0.00 $ - $ 19,972.12 2-1 EMERGENCY RIP RAP PLACEMENT LS $ 7,939.83 1.0 1.00 0.00 $ - $ 7,939.83 2-2 REMOVAL OF RIP RAP LOADS $ 125.00 16.0 16.00 0.00 $ - $ 2,000.00 INCREASE/DECREASE $ 6,141.62 PAY ESTIMATE #1 PAY ESTIMATE #2 $ 71,727.88 $ 33,877.00 �� �i PAY ESTIMATE #3 $ 36,266.25 ED }y� y / PAY ESTIMATE #4 $ 52,056.69 C5.4i`.= J PAY ESTIMATE #5 $ 44,831.67 Peterson Contractor's Inc. Date RETAINAGE $ 12,586.28 TOTAL PAYMENT $ 251,325.57 ORIGINAL CONTRACT AMOUNT $ 245,183.95 FINAL QUANTITY ADJUSTMENT $ 6,141.62 City of Waterloo Date FINAL CONTRACT AMOUNT $ 251,325.57 Letter of Transmittal TO: Ms. Suzy Schares City Clerk 715 Mulberry Street Waterloo, Iowa 50703 WE ARE SENDING YOU: O Attached ❑ Shop Drawings ❑ Copy of Letter ❑ Prints ❑ Change Order A=COM DATE: August 4, 2015 JOB ID NO. 60311495 ATTENTION: RE: 4th Street Riverwall Reconstruction Waterloo, Iowa City Contract No. 855 ❑ Under Separate Cover Via the Following Items: ❑ Plans ❑ Samples 0 Specifications Copies Date No. Description 1 Paperwork for the Above -Referenced Project Signed by PCI and AECOM THESE ARE TRANSMITTED AS CHECKED BELOW: O For Approval O For Your Use O As Requested O For Review and Comment ❑ For Bids Due 20 El Approved as Submitted O Approved as Noted O Returned for Corrections O Resubmit _ Copies for Approval O Submit Copies for Distribution ❑ Return _ Corrected Prints REMARKS: If you have any questions, please let us know. Thank you. O Prints Returned After Loan to Us COPY TO: LEW:blc SIGNED: Larry E. Wiele, PE If enclosures are not as noted, kindly notify us at once. 501 Sycamore Street, Suite 222 • P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 • Fax: (319) 232-0271