HomeMy WebLinkAboutJDE Engineering-4/13/2015CITY OF WATERLOO
Council Communication
Resolution approving Supplemental Agreement No. 2 with JDE Engineering, of Waterloo, Iowa, in the
amount of $5,510.00, in conjunction with additional construction review services for the F.Y. 2011
Downtown Wayfinding Signage, Contract No. 783; and authorize Mayor to execute said document.
City Council Meeting: 4/13/2015
Prepared: 4/8/2015
ATTACHMENTS:
Description Type
u Cont 783 Supp Agreement 2 Cover Memo
Class/Meeting:
Destination:
Dates:
Amount not to exceed:
Board/Commission:
Expiration Date:
SUBJECT:
Resolution approving Supplemental Agreement No. 2 with JDE
Engineering, of Waterloo, Iowa, in the amount of $5,510.00, in
conjunction with additional construction review services for the F.Y.
2011 Downtown Wayfinding Signage, Contract No. 783; and authorize
Mayor to execute said document.
Submitted by: Submitted By: Jeff Bales, Associate Engineer
Summary Statement:
There has been additional work on this project for the construction
review services including reviewing the qualifications of non -DOT
preapproved suppliers as other preapproved suppliers refused to do the
work based on the unusual graphics on the signs. There were additional
services provided to address working day issues.
Finalization and project closeout work remains on this project and this
supplemental agreement covers the anticipated hours for remaining work
and estimated maximum not -to -exceed cost of $5,510.00.
Expenditure Required: $5,510.00
Source of Funds: G.O. Bonds
(319) 464-7913 3731 Pheasant Lane Suite #201 • Waterloo, IA 50701 jdeeng(lpctel.net
March 3, 2015
F.Y. 2011 INSTALLATION OF WAYFINDING SIGNAGE
WITHIN DOWNTOWN WATERLOO
IOWA DOT PROJECT NO. STP -U-8155(719)--70-07
CITY OF WATERLOO PROJECT NO. 783
SUPPLEMENTAL AGREEMENT #2
WHEREAS, a Professional Services Agreement is currently in place between the City of Waterloo, Iowa ("City") and
JDE Engineering, PLC ("Consultant") dated March 21, 2011, and
WHEREAS, additional Construction Related Services were determined to be necessary to assist in obtaining qualified
sub -contractors to work on the project, and to also document quality of construction due to an increase in the
duration of the project schedule,
NOW THEREFORE, it is mutually agreed that this Supplemental Agreement #2 shall consist of the following:
SCOPE OF SERVICES
The scope of services shall consist of obtaining the following:
• Work with the prime contractor and Iowa DOT to obtain a qualified sign manufacturing sub -contractor,
pole manufacturing sub -contractor, and finish painting sub -contractor to complete work on this project,
• Conduct research into the supporting documentation to justify additional working days worked by the
contractor to complete the project,
• Meet with contractor, Iowa DOT staff, and City personnel to discuss possible resolutions to excess
working day issues,
• Work with the Iowa DOT to resolve excess working days issues documented during the course of the
construction in a satisfactory manner in accordance with Iowa DOT and Federal Highway Administration
(FHWA) guidelines.
II. TIME OF BEGINNING AND COMPLETION
Work under this supplemental agreement is complete as of the date of this agreement.
1
III. COMPENSATION
The fee for the work detailed under "Section I. Scope of Services" is based document time -and -materials
worked by JDE Engineering staff (see attachment). The total cost of Supplemental Agreement #2 is
$5,510.00. This fee is considered a maximum not -to -exceed cost.
IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement #1 as of the dates shown
below:
JDE ENGINEERING, PLC
Z". 3-3 -/5"-
Jim D. Ellis, P.E.
Owner
CITY OF WATERLOO, IOWA
Ernest G. Clark
Mayor
Date
Date