Loading...
HomeMy WebLinkAboutFailor Hurley Construction-4/27/2015mitDocument G701' - 2001 Change Order PROJECT (Name and address): 13137 Waterloo Center for the Arts Toilet Renovation TO CONTRACTOR (Name and address): Failor Hurley Construction 3337 Mamie Ave Waterloo, IA 50701 CHANGE ORDER NUMBER: 001 DATE: March 26, 2015 ARCHITECT'S PROJECT NUMBER: 13137 CONTRACT DATE: January 26, 2015 CONTRACT FOR: General Construction OWNER: ❑ ARCHITECT: ❑ CONTRACTOR: ❑ FIELD: 0 OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Constr,wtion Change Directives) 1. Per letter from Failor Hurley dated March 16, 2015, Furnish all material, labor and equipment required to install new 1-1/4" PEX piping to the (2) upstairs restrooms, (2) sinks on the main floor, (1) drinking fountain, and the water heater in the boiler room from the new 2-1/2" line. ADD - $5,370.00 2. Per letter from Failor Hurley dated March 16, 2015, delete insulating of 2" and smaller cold water PEX lines,. DEDUCT $800.00 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is May 22, 2015 $ 195,334.00 $ 0.00 $ 195,334.00 $ 4570.00 $ 199,904.00 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. INVISION Architecture, LTD Failor Hurley Construction City of Waterloo ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) PO Box 1800 3337 Marnie Ave, Waterloo, IA 50701 Waterloo, IA 50704-1800 ADDR SS BY (Signatufe) BAY (Signature) Angie Nees o L-6.• r6� (Typed name) March 26, 2015 0'5/24, /t5 DATE DATE (Typed name) City Hall, 715 Mulberry Street, Waterloo, Iowa 50703 ADD S BY (Signature) Buck Clark (Typed name) DATE AIA Document G701 TM — 2001. Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA, Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This documentwas produced by AIA software at 14:39:54 on 03/26/2015 under Order No.6138499489 1 which expires on 07/19/2015, and is not for resale. User Notes: (1768896371) -- r./ rOONSTRUCTIO0 March 16,2015 InVision Architecture P.O. Box 1800 Waterloo, Iowa 50704 Attn: Ms. Angie Nees Subj: WCA Toilet Room Renovation Angie, We are submitting the following proposals related to Proposal Request no. 1 which are different than originally Issued request based on job site conversations between our plumbing subcontractor and the project engineer. Item no. 1— Furnish all material, labor, and equipment required to install new 1 IA" PEX piping to the (2) upstairs restrooms, (2) sinks on the main floor, (1) drinking fountain, and the water heater in the boiler room from the new 234" line, add: $57730;613 370 600 Breakdown Eden Plumbing Superintendent Bond Contractor's Fee $4,652.00 150.00 80.00 488.00 $5,370.00 Item no. 2 — Delete Insulating of 2" and smaller cold water PEX lines, deduct: 5800.00 Please feel free to contact us if you have any questions or need any additional information. Sincerely, FAILOR HULEY CONSTRpCTION William W. Failor 3337 Mamie Avenue, Water 1,111 PA 50701 I Of 319 -883 - Fax 319-883-3037 J FailerHurley.com TRANSMITTAL DATE: 4/8/15 PROJECT: Waterloo Center for the Arts Toilet Renovation PROJECT #: 13137 TO: Buck Clark — City of Waterloo Via: ® First Class Mail ❑ United Parcel Service ❑ Overnight ❑ Hand Carry ITEMS: NO. DESCRIPTION 0 Email: 3 Change Order No. 001 ❑ Fax: Pages to Follow: Copy Form To: File MESSAGE: Please sign all three copies of the enclosed change order, retain one copy for your files, and return the other two to our office. Thank you. Waterloo: 319.233.8419 319.233.9772- fax BY: yvonned@invisionarch.com