HomeMy WebLinkAboutVieth Construction Corporation-5/4/2015CITY OF WATERLOO Council Communication Motion approving Change Order No. 2 for a net decrease of $7,752.00 for the F.Y. 2012 Lincoln Elementary Safe Routes to School Project, Contract No. 805; and authorize the Mayor and City Clerk to execute said document. City Council Mee g: 5/4/2015 Prepared: 4/29/201 REVIEWERS: Department Reviewer Action Date Engineering Higby. Nancy Approved 4/29/2015 - 11:47 AM Clerk Office Higby, Nancy Approved 4/29/2015 - 11:47 AM SUBJECT: Submitted by: Summary Statement: Source of Funds: Motion approving Change Order No. 2 for a net decrease of $7,752.00 for the F.Y. 2012 Lincoln Elementary Safe Routes to School Project, Contract No. 805; and authorize the Mayor and City Clerk to execute said document. Submitted By: Wayne Castle, PLS, EI, Associate Engineer This is the accumulated amount of adjustments from original to final quantities that were determined necessary during the construction of the project, which results in an increase to the total project cost. Safe Routes to School Grant CITY OF WATERLOO, IOWA FINAL QUANTITY ADJUSTMENT — CHANGE ORDER No. 2 PROJECT: FY 2012 LINCOLN ELEMENTARY SCHOOL SAFE ROUTES TO SCHOOL (SRTS) CONTRACT NO. 805 Date Prepared: Apri129,2015 AMOUNT: $7,752.00 DECREASE TO: VIETH CONSTRUCTION CORPORATION , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated August 20, 2012. A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some original bid items and bid items added through Change Order #1, approved by City Council on January 13, 2014. C. Settlement for cost of work to be made as follows: BY: ayor ATTEST: Compensation already made to contractor through bid items. See attached summary. Dae City Cle Change Order No. 1 Date TOTAL DECREASE $7,752.00 VIETH CONSTRUCTION CORPORATION CONTRACTOR BY: /27/3 ate TITLE: ,A)/2—',141.S, APPROVED: City Engineer D-te Contract No. 805 Sheet 1 of 1 F.Y. 2012 LINCOLN ELEMENTARY SCHOOL SAFE ROUTES TO SCHOOL (SRTS) CONTRACT NO. 805 FINAL QUANTITIES ADJUSTMENT BID ITEM ITEM DESCRIPTION UNITS ORIGINAL QUANTITY FINAL QUANTITY QUANTITY DIFFERENCE VCC UNIT PRICE VCC UNIT PRICE EXT. INCREASE/ DECREASE 1 CLEARING AND GRUBBING (C.O.#1) UNIT 4.8 7.2 2.4 $ 190.00 $ 1,368.00 $ 456.00 2 EXCAVATION, CLASS 10, WASTE (C.O.#1) CY 225.9 231.9 6.0 $ 69.00 $ 16,001.10 $ 414.00 3 TOPSOIL, FURNISH AND SPREAD CY 206.6 206.6 $ 30.00 $ 6,198.00 $ - 4 REMOVAL OF CURB STA 0.5 0.5 $ 2,700.00 $ 1,350.00 $ - 5 GRANULAR SURFACING ON ROAD, CLASS B CRUSHED STONE TON 40.5 40.5 '. - ' $ 34.00 $ 1,377.00 $ - 6 REMOVAL OF SIDEWALK, (C.O.#1) SY 90.6 114.4 218'. $ 10.00 $ 1,144.00 $ 238.00 7 SIDEWALK, P.C. CONCRETE, 4 IN. (C.O.#1) SY 1,380.6 1,333.8 ' (46.8) $ 43.00 $ 57,353.40 $ (2,012.40) 8 SIDEWALK, P.C. CONCRETE, 6 IN. SY 71.6 71.6 $ 46.00 $ 3,293.60 $ - 9 DETECTABLE WARNINGS (C.O.#1) SF 120.0 120.0 -,, $ 47.00 $ 5,640.00 $ - 10 CURB AND GUTTER, P.C. CONCRETE, 2.0 FT. LF 46.0 46.0 $ 24.00 $ 1,104.00 $ - 11 DRIVEWAY, P.C. CONCRETE, 6 ON. (C.O #1) SY 155.1 70.7 (84A) $ 43.00 $ 3,040.10 $ (3,62920) 12 REMOVAL OF PAVED DRIVEWAY (C.O.#1) SY 187.8 363.6 175.8 $ 16.00 $ 5,817.60 $ 2,812.80 13 COMBINED CONCRETE SIDEWALK AND RETAINING WALL (C.O.#1) CY 3.0 112 82 $ 650.00 $ 7,280.00 $ 5,330.00 14 SAFETY CLOSURE EACH 9.0 9.0 $ 80.00 $ 720.00 $ - 15 FENCE, SAFETY LF 200.0 200.0 - " $ 6.50 $ 1,300.00 $ - 16 WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN. X 4 IN. LF 84.0 84.0 - $ 11.00 $ 924.00 $ - 17 TYPE A SIGNS, SHEET ALUMINUM SF 72.5 72.5 $ 22.00 $ 1,595.00 $ - 18 PAINTED PAVEMENT MARKING, WATERBOURNE OR SOLVENT -BASED STA 24.0 24.0 $ 80.00 $ 1,922.40 $ - 19 TRAFFIC CONTROL LS 1.0 1.0 -' $ 2,700.00 $ 2,700.00 $ 20 FLAGGERS EACH 10.0 10.0 - ; $ 325.00 $ 3,250.00 $ - 21 MOBILIZATION LS 1.0 1.0 - $ 5,000.00 $ 5,000.00 $ - 22 INLET FILTER BAGS EACH 4.0 4.0 - $ 175.00 $ 700.00 $ - 23 HORIZONTAL SAWING FOR CURB REMOVAL LF 62.6 62.6 ' -_ $ 6.00 $ 375.60 $ - 24 MULCHING, WOOD CELLULOSE FIBER ACRE 0.4 0.4 - $ 5,600.00 $ 2,240.00 $ - 25 SEEDING AND FERTILZING (URBAN) ACRE 02 02 $ 17,000.00 $ 3,400.00 $ - 26 STABILIZING CROP - SEEDING AND FERTILIZING (URBAN) ACRE 02 02 -r" $ 3,000.00 $ 600.00 $ - 27 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN, DIA. LF 500.0 500.0 - $ 4.50 $ 2,250.00 $ - 28 REMOVAL OF PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE LF 500.0 500.0 $ 0.25 $ 125.00 $ - CHANGE ORDERS 8001 PORTLAND CEMENT CONCRETE PAVEMENT COLD WEATHER PROTECTION (PRE -ESTABLISHED PRICE) (C.O.#1) SY 4952 4952 $ 1.00 $ 49520 $ 49520 8002 HMA COMMERICAL MIX (INCLUDES ASPHALT BINDER), AS PER PLAN (C.O.#1) TON 5.0 5.0 s $ 200.00 $ 1,000.00 $ 1,000.00 8003 DRIVEWAY, P.C. CONCRETE, CLASS M, 6 IN. (C.O.#1) SY 283.8 283.8 $ 54.00 $ 15,325.20 $ 15,325.20 TOTAL INCREASE IN CONSTRUCTION ITEMS $ 20,429.50 TOTAL ORIGINAL CONTRACT AMOUNT $ 133,748.20 CHANGE ORDER #1 $ 21,141.00 NEW CONTRACT AMOUNT $154,889.20 FINAL NEW CONTRACT AMOUNT TOTAL PAY ESTIMATE #1 $ 119,485.02 PAY ESTIMATE #2 $ 23,238.06 RETAINAGE $ 4,414.12 TOTAL PAYMENTS $ 147,137.20 TOTAL ORIGINAL CONTRACT AMOUNT $ 133,748.20 CHANGE ORDER #1 $ 21,141.00 NEW CONTRACT AMOUNT $154,889.20 FINAL NEW CONTRACT AMOUNT $ 154,889.20 FINAL QUANTITY SUMMARY $-;,'(7,752,00). FINAL CONTRACT AMOUNT $147,137.20