HomeMy WebLinkAboutBoulder Contracting-5/18/2015CHANGE ORDER NO. 1 Owner qty of Waterloo Project Gatewell Replacement Project, Various Locations Owner's Contract No. 867 Contractor: Boulder Contracting Date: May 11, 2015 Date of Contact Start January 6, 2015 Contract Amount: $ 591,500.00 You are directed to make the following changes in the Contract Documents. Description: 1-1 Video Inpection of Gates (60 HRS @ $360/HR) TOTAL ADDITIONS $ 21,600.00 $ 21,600.00 Reason for Change Order 1-1 Video inspection of the newly installed gates will be required to verify how well the gate seals. Original specifications called for measurement of leakage, but this could not be completed because of leakage occuring in the original structure. CONTRACT PRICE Original; Previous C.O.s (ADD/DEDUCT) This C.O. (ADD/DEDUCT) Contract Price with all approved Change Orders: $ 591,500.00 Original Completion Date: $ 21,600.00 Revised Completion Date: $ 613,100.00 CONTRACT TIME To Substantial Completion To Final Completion 5/31/2015j 5/31/2015 6/29/20151 6/29/2015 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resultingfrom the changesl ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. APPROVE 1 ner (Author . Signature) ACCEPTED: BY: i THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND CONVENANTS OF THE CONTRACT SHALL APPLY HERETO. Contra ACCEPTED: BY: horized Signature) Date 06/1/0 Date 5// / Date AECOM 60332895 1 1 Project No. C.O. No. CITY OF WATERLOO Council Communication Motion approving Change Order No. 1 for a net increase of $21,600.00 for the F.Y. 2014 Flood Control Gatewell Repairs, Contract No. 867; and authorize the Mayor and City Clerk to execute said document. City Council Meetin : 5/18/201 Prepared: 5/12/2015 REVIEWERS: Department Reviewer Action Engineering Thorson, Eric Approved SUBJECT: Submitted by: Source of Funds: Background Information: Date 5/13/2015 - 10:44 AM Motion approving Change Order No. 1 for a net increase of $21,600.00 for the F.Y. 2014 Flood Control Gatewell Repairs, Contract No. 867; and authorize the Mayor and City Clerk to execute said document. Submitted By: Jamie Knutson, PE, Associate Engineer G.O. Bonds Video inspection of the newly installed gates will be required to verify how well the gate seals. Original specifications called for measurement of leakage but this could not be completed because of leakage occurring in the original structure.