Change Order
Document G701TM= 2001
'kflhot
v + ,+II
PROJECT (Name and address): CHANGE ORDER NUMBER: 005
Waterloo Public Library Restroom
Renovation for the City of Waterloo,
Waterloo, IA
TO CONTRACTOR (Name and address):
Don Gardner Construction Co., Inc.
315 LaPorte Road
Waterloo, IA 50702
DATE: January 27, 2015
ARCHITECT'S PROJECT NUMBER: 14004.00
CONTRACT DATE: Ju1y29, 2014
CONTRACT FOR: General Construction
OWNER: ❑
ARCHITECT: 0
CONTRACTOR:
FIELD: 0
OTHER ❑
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
A. To make the proposed changes to the corridor lighting.
B. To have the speaker and lights relocated per RFI #2 reflected ceiling plan.
REDUCE REMAINING GENERAL ALLOWANCE FROM $347.00 TO .ZERO.
CONTRACT SUM TO BE INCREASED BY $1,497.00.
The original Contract Sum was
The net change by previously authorized Change Orders
The Contract Sum prior to this Change Order was
The Contract Sum will be increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
ADD $1,393.00
ADD $ 451.00
TOTAL $1,844.00
$ 126,000.00
$ 0.00
$ 126,000.00
$ 1,497.00
$ 127,497.00
The Contract Time will be unchanged by Zero (0) days.
The date of Substantial Completion as of the dare of this Change Order therefore is March 9, 2015.
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have
been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
StruXture Architects LLC
ARCHITECT (Firm name)
314 East 4th Street, Waterloo, IA 50703
ADDRESS
BY (Signature)
Daniel C. Charmer
(Typed name)
DATE
Don Gardner Construction Co., Inc.
CONTRACTOR (Firm name)
315 LaPorte Road, Waterloo, IA 50702
ADDRESS`.
SY(Signature)
Mark Gardner
(Typ )
DATE
City of Waterloo
OWNER (Firm name)
715 Mulberry Street, Waterloo, IA 50703
ADDRESS
BY (Signature)
Ernest G. Clark
(Typed name)
DATE
AIA Document G701", — 2001. Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA°
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any
portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
produced by AIA software at 11:27:13 on 01/27/2015 under Order No.9776742895_1 which expires on 08/21/2015, and is not for resale.
User Notes: (1396917065)
1
TRANSMITTAL
Date: 2/3/2015
To: City of Waterloo
Attn: Craig Clark
715 Mulberry Street
Waterloo, IA 50703
From: Tracy Neymeyer, Project Administrator
Subject: #14004.00 Waterloo Public Library Restroom Renovation for the City of Waterloo
Transmitted Via: Postal Delivery
For Your: Approval
Transmitted Items:
No Description
3
Change Order #G-5 dated 01/27/15
Message:
- Please review, sign and date all copies of the enclosed change order(s).
- Return all copies to our Waterloo office for further processing.
- After all signatures are obtained, a copy will be mailed to you for your records.
Thanks!