Loading...
HomeMy WebLinkAboutRicklefs Excavating-2/9/2015A:COM January 26, 2015 Mr. Larry Smith Water Pollution Control Facility 3505 Easton Avenue Waterloo, Iowa 50702 Subject: LaPorte Road Pumping Station and Force Main City Contract No. 847 AECOM #60311667 Dear Larry, AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Transmitted herewith are four (4) copies of Change Order No. 3 - Final for the above -referenced project. This final change order reflects a net increase in the contract in the amount of $7,274.17. It reflects the final quantity adjustments, which result primarily from IDOT and city staff requirements for the Storm Water Pollution Prevention Plan. The final contract amount for this project is $414,622.93. Upon approval by the City Council, please return two (2) signed copies of this Change Order No. 3 - Final to our office. If you have any questions or need anything further in this matter, please let us know. Yours sincerely, Robert E. B Enclosure: As Noted c: Ms. Suzy Schares (w/enclosure) L:\work\project\60311667\00000000\600-Construction Support\670 Change Orders\1-26-15 CO 3 -Final - LaPorte Road PumpSta.docx CHANGE ORDER NO. 3 (FINAL) Owner City of Waterloo Date: January 16, 2015 Project LaPorte Road Pumping Station and Force Main Owner's Contract No. 847 Contractor: Ricklefs Excavating Date of Contact Start January 28, 2014 Contract Amount: $ 352,134.00 You are directed to make the following changes in the Contract Documents. Description: 4 Sanitary Sewer Gravity Main, Trenched, PVC Truss, 8 In. (-4.0 LF @ $23.00) $ (92.00) 5 Sanitary Sewer Gravity Main, Trenched, PVC Truss, 12 In. (9.0 LF @ $29.00) $ 261.00 6 Sanitary Sewer Gravity Main, PVC Truss, 12 In., In Steel Casing Pipe (35.0 LF @ $210.00) $ 7,350.00 9 Sanitary Sewer Force Main, Trenched, Polyvinyl Chloride Pipe, 6 In. (-3.0 LF @ $19.00) $ (57.00) 11 Sanitary Sewer Plug (-1.0 EA @ $50.00) $ (50.00) 16 PCC Pavement Removal (-2.3 SY @ $10.00) $ (23.00) 17 8" PCC Standard or Slipform Pavement (-2.3 SY @ $65.00) $ (149.50) 21 Chain Link Fence, 6 Ft w/3 -Strand Barbed Wire, Inc 16 Ft Dbl Swing Gate (7.0 LF @ $24.00) $ 168.00 22 Seeding, Fertilizing and Mulching for Hydraulic Seeding (0.15 AC @ $2,690.00) $ 403.50 23 Wattle, 20 In. Dia. (1,400.0 LF @ $2.60) $ 3,640.00 24 Wattle Removal (-250.0 LF @ $1.00) $ (250.00) 1-4 Additional Cost for Marigold Drive Patch (-17.9 SY @ $42.70) $ (764.33) 2-6 Wood Excelsior Mat (-0.25 LS @ $12,650.00) $ (3,162.50) TOTAL ADDITIONS $ 7,274.17 Reason for Change Order 6 At the request of the IDOT the alignment for the sewer main was revised to move the main away from Highway 218. As a result, the length of cased pipe required to cross under Highway 218 increased. 23 During SWPPP Inspections by City staff it was noted that there were some erosion issues in the newly graded and seeded ditch. In order to take care of these issues it was requested that additional wattles be installed All Other The remaining quantities have been revised to bring them in line with field measured quantities. Items CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 352,134.00 Original Completion Date: 1 4/30/2014 Previous C.O.s (ADD/DEDUCT) $ 55,214.76 This C.O. (ADD/DEDUCT) $ 7,274.17 Revised Completion Date: 1 10/8/2014 Contract Price with all approved Change Orders: $ 414,622.93 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. APPROVED: BY: THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND CONVENANTS OF THE CONTRACT SHALL APPLY HERETO. Owner (Authorized Signature) ACCEPTED: BY: Contractor (Authorized Signature) ACCEPTED: BY: AECO Date e9 n► -a1 -i s Date Date AECOM 6031166713 (FINAL) Project No. C.O. No.