Loading...
HomeMy WebLinkAboutAment Design-3/9/2015 (2)Ament D F S .1 G N A A.U;flS City of Waterloo Attn: Jamie Knutson 715 Mulberry Street Waterloo, IA 50703 WORK ORDER #14-02 Date: February 24, 2015 Base Agreement Date: September 10, 2012 Ament Design Project Number. G0004.12200 City of Waterloo Project Number: 840 Re: Virden Creek Tributary Drainage Improvements — Geotechnical, Wetland Delineation, Survey and Design, and Bid Services A. Previous Contract Amount = $135,000.00 B. Work Order Amount ($4,250 Not -to -Exceed Amount + $1,750 Lump Sum Amount) = $6,000.00 C. New Contract Maximum Amount (A + B) = $141,000.00 Scope of Work Order Wetland Delineation Services (Not -to -Exceed Amount) $4,250 • The additional services required for additional wetland delineation to be performed by Terracon as a subconsultant outside of the original scope of services include: o Site data review, field assessment, and wetland identification o GPS survey of identified wetland o WUS delineation report o Follow-up site visit to confirm vegetation (If requested by USACE) Survey and Design Services to Assist Additional Wetland Delineation Studies $1,750 • The additional services required for additional wetland delineation services to be performed by Ament Design include: o Project coordination with subconsultant o Field location of southerly study limits for wetland delineation study o Field location of wetland boundary, if subconsultant is unable to do so because of tree cover in the area o Incorporation of identified wetland area boundary into plans o Meeting with Owner to review study findings and possible Project impacts (NOTE: This work order does not include any design revisions to platting documents or contract documents that may be necessary as a result of the findings of the additional wetland delineation study or that may be necessary so as to minimize impacts to any identified wetland areas. These additional design services will be determined once the additional studies have been performed and the impacts of the study findings have been assessed.) C:\Documents and SettingslmdrydentLocal Settings\Temporary Internet Files\ContenL0utIook\U6HZ3QG4Winien Creek Tributary Drainage Way -Work Order 4.doc Virden Creek Tributary Drainage Improvements Work Order # 14-02 - Geotechnical, Wetland Delineation, Survey and Design Services, and Bid Services Date: February 24, 2015 Schedule: Unless we are delayed by events beyond our control, Ament Design and its subconsultants intend to complete the aforementioned scope of services by July 10, 2015, if Notice to Proceed from the City is received by May 1, 2015. Fee: Not -to -Exceed Amount (Terracon) — Lump Sum Fee Amount (Ament) — Total Not -to -Exceed Amount — $4,250.00 $1.750.00 $6,000.00 Submitted by: Anent Design 3-6-i Date The Base Agreement signed between Anent Design and the City of Waterloo is referenced by this statement, and shall be considered part of this work order. C:\Documents and SettingsnidrydenlLocal SettingslTemporary Internet Files\Content.Outlook\U6HZ3QG4\Virden Creek Tributary Drainage Way - Work Order 4.doc