Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Struxture Architects-3/9/2015
TRANSMITTAL Date: 3/2/2015 To: City of Waterloo Attn: Craig Clark 715 Mulberry Street Waterloo, IA 50703 From: Tracy Neymeyer, Project Administrator Subject #14004.00 Waterloo Public Library Restroom Renovation for the City of Waterloo Transmitted Via: Postal Delivery For Your: Approval Transmitted Items: Message: Please review, sign and date all copies of the enclosed change order(s). Return all copies to our Waterloo office for further processing. After all signatures are obtained, a copy will be mailed to you for your records. Thanks! Copies Forwarded: STRUJ TURE , ARCHITECTS ARCHITECTURE INTERIOR DESIGN MASTER PLANNING itAIA Document G701 - 2001 Change Order PROJECT (Name and address): Waterloo Public Library Restroom Renovation for the City of Waterloo, Waterloo, IA TO CONTRACTOR (Name and address): Don Gardner Construction Co., Inc. 315 LaPorte Road Waterloo, IA 50702 CHANGE ORDER NUMBER: 006 OWNER: 0 DATE: February 23, 2015 ARCHITECT: 0 CONTRACTOR: 0 ARCHITECT'S PROJECT NUMBER: 14004.00 FIELD: 0 CONTRACT DATE: July 29, 2014 OTHER: 0 CONTRACT FOR: General Construction THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) A. CR #7: To provide wiring to the sink faucets. B. CR #8: To install 6 vinyl base in lieu of 4" in the corridor (Option #2). TOTAL AMOUNT OF THIS CHANGE ORDER, ADD TO CONTRACT SUM $1,418.00. The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is March 9, 2015. ADD ADD TOTAL $476.00 $942.00 $1,418.00 $ 126,000.00 $ 1,497.00 $ 127,497.00 $ 1,418.00 $ 128,915.00 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. StruXture Architects, LLC ARCHITECT (Firm name) Don Gardner Construction Co., Inc. CONTRACTOR (Firm name) 314 East 4th Street, Waterloo, IA 50703 315 LaPorte Road, Waterloo, IA 50702 ADDRESS ADDRESS, 7 / BY (Signature) Daniel C. Charmer (Typed name) DATE BY'(S gizature) Mark Gardner City of Waterloo OWNER (Firm name) 715 s berry Street, Waterloo, L 50703 SS (Typed name) DATE BY (Signature) Ernest G. Clark (Typed name) '3/q I(5 DATE AIA Document G701 ' — 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA° Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:58:47 on 02/23/2015 under Order No.9776742895 1 which expires on 08/21/2015, and is not for resale. User Notes: (1181954926)