HomeMy WebLinkAboutWPCF Flow Equalization-6/12/2017STATE OF IOWA, }
Black Hawk County, SS
PUBLIC NOTICE
PUBLIC NOTICE IS HEREBY GIVEN
THAT THE WATERLOO WPCF FLOW
EQUALIZATION OVERFLOW PIPING
IMPROVEMENTS PROJECT IS
ELIGIBLE FOR A CATEGORICAL
EXCLUSION FROM NEPA REVIEW.
THIS PROJECT IS BEING FUNDED IN
PART OR WHOLE BY SRF FUNDING.
The proposed project was reviewed by
the Iowa Department of Natural Resour-
ces (DNR) for eligibility for a categ6rical
exclusion from NEPA review specified in
the 40 GFR (Code of Federal . Regula-
tions) Part 6.204. The project meets. all
criteria described in the above reference,
and it was determined that this project is
eligible for a categorical exclusion.
Consequently, a preliminary decision has
been made that a Finding of No
Significant Impact (FNSI) will not be
prepared.
This action is takenon' the basis of a
careful review of supporting information
that is on file at the DNR's Des Moines,
Iowa office. The Categorical Exclusion
documentation for this project is available
online at www.lowaSRF.com/ER. The
DNR will not take any administrative
action on the project for at least thirty (30)
calendar days from the publication of this
Notice. Persons disagreeing with the
above environmental decision may submit
comments to the DNR during this period.
Please direct your comments to Lee
Wagner at Lee.Wagner@dnr.iowa.gov or
515-725-0992.
I do solemnly swear that the annexed copy of legal
City of Waterloo
Public Notice: WPCF Flow Equalization
Overflow Piping Project
Notice was published in the Waterloo -Cedar Falls
Courier, a daily newspaper printed in Waterloo, Black
Hawk County, Iowa, once commencing on the 12th
day of June, 2017 in the name of said newspaper, and
that the annexed rate of advertised is the regular legal
rate of said newspaper, and that the following is a
correct bill for publishing said notice.
Printer's Bill $17.39
Signed
Subscribed and sworn to before me this IS
Day of A.D., 20 17
Received of
Notary Public
the sum of
Dollars.
In full for publication of the above notice.