Council Communication
Resolution approving Construction Plans for Private Sanitary Sewer Serving Kinsale
Addition Phase 2, as submitted by Brain Engineering, Inc. of Cedar Rapids, Iowa; and
Sewage Treatment Agreement DNR Form 29 (Nov 00) with the Department of Natural
Resources and the final acceptance of construction plans subject to the review and
acceptance by the DNR; and authorize Mayor to execute said document.
City Council Meeting: 4/6/2015
Prepared: 4/1/2015
Class/Meeting:
Destination:
Dates:
Amount not to exceed:
Board/Commission:
Expiration Date:
SUBJECT:
Resolution approving Construction Plans for Private Sanitary
Sewer Serving Kinsale Addition Phase 2, as submitted by Brain
Engineering, Inc. of Cedar Rapids, Iowa; and Sewage Treatment
Agreement DNR Form 29 (Nov 00) with the Department of
Natural Resources and the final acceptance of construction plans
subject to the review and acceptance by the DNR; and authorize
Mayor to execute said document.
Submitted by: Submitted By: Dennis Gentz, PE, Assistant City Engineer
Summary Statement:
Resolution approving Construction Plans for Private Sanitary
Sewer Serving Kinsale Addition Phase 2, as submitted by Brain
Engineering, Inc. of Cedar Rapids, Iowa; and Sewage Treatment
Agreement DNR Form 29 (Nov 00) with the Department of
Natural Resources and the final acceptance of construction plans
subject to the review and acceptance by the DNR; and authorize
Mayor to execute said document.
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e., a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities.
However, the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT
ENGINEER
OWNER
Hawkeye Capitalss, L.L.C.
FIRM
Brain Engineering, Inc.
ADDRESS
999 44th Street, Suite 1000 Marion, IA. 52302
ADDRESS
1540 Midland Court NE, Cedar Rapids, IA. 52402
REPRESENTATIVE
Barry Smith
TELEPHONE
319-373-2683
PROJECT OFFICER
Daniel L. Schmidt
TELEPHONE
319-294-9424
PROJECT IDENTIFICATION
Kinsale Addition - Phase 2, Waterloo
OWNER AND SYSTEM RECEIVING WASTES
City of Waterloo, Iowa
CERTIFICATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
SIGNATURE
TITLE
,Me'1'mER
DATE
'4/4, /,/ 3�_
L
TO PROVIDE SEWAGE TREATMENT
of the system identified above and state that the connection of the proposed sanitary
by the owner, and that the owner accepts responsibility for providing adequate
in accordance with the provisions of Chapter 455B, Code of Iowa, and the rules
shall not be construed in any way to affect any local ordinances, sewer
between the parties.
AGREEMENT
I am the authorized representative of the owner
sewerage facilities identified above is approved
treatment of all wastes contributed by this project,
of the Dep • IPS.- i t of Natural Resources. This agreement
service agr- a ents, or fee sy tems ent.-z . int
SIGNATURE
TYPED OR PRINTED NAME
Erl1e54- C - Cilcuvk
TITLE
9
PHONE NUMBER
DATE
ov
542-3219
Exhibit 111A
Iowa Department of Natural Resources Wastewater Engineering Section
Construction Permit Application
SCHEDULE A. General Information
APPLICANT
ENGINEER
OWNER E-MAIL ADDRESS
Hawkeye Capital hwestments, L.L.0
mark@platinumserieshomes.com
FIRM E-MAIL ADDRESS
Brain Engineering, Inc. dans@brain-eng.com
ADDRESS
999 44th Street, Suite 1000 Marion, Iowa 52302
ADDRESS
1540 Midland Ct. NE Cedar Rapids, IA. 52402
REPRESENTATIVE TELEPHONE
Barry Smith 319-373-2683
PROJECT OFFICER TELEPHONE
Daniel L. Schmidt 319-294-9424
PROJECT IDENTIFICATION
Kinsale Addition — Phase 2, Waterloo
ESTIMATED START DALE, *
April 2015
ESTIMATED COMPLETION DATE
June 2015
PLEASE RESPOND TO ALL QUESTIONS
1. Has an engineering report, facilities plan or other information previously been submitted for this project?
If Yes=>
PROJECT IDENTITY
DATE SUBMII'IED
2. Does the project and construction permit application, as submitted, follow the recommendations, design
loadings, construction schedule, permit limits, and conclusions of the approved engineering report or
facilities plan?
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application?
For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
Standard 11.1, two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standard specifications a part of this application?
If Yes=>
APPROVED STANDARD SPECIFICATIONS OF
(municipality or firm)
Iowa Statewide Urban Design and Specifications
DATE APPROVED
10/15/2013
5. Does each set of plans and specifications or engineering report accompanying this application contain a
"professional engineering seal" executed in conformance with 542B.16, Code of Iowa?
If No=> Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project?
If Yes=> A construction permit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction?
If No=> A Sewage Treatment Agreement (DNR Form 29) executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application?
If Yes=> A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet; or any private or public well, lake, or public recreation area located
within 400 feet of the proposed construction?
If Yes=> Identify and locate the facility(s) relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the applicant?
If No=>
NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
Brain Engineering, Inc.
11. Will this project utilize CWSRF loan funds?
YES NO
CERTIFICATION
❑ M4 El
E
E
E
E
APPLICANT ENGINEER
I certify that I am the authorized representative of the owner and I certify that all aspects of design included in this application
state that the project identified above is approved by the owner. conform to applicable standards contained in Chapter 567 IAC
64, or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application, and to the best of my
knowledge, such information is complete and accurate.
t
* Estimated Construction Start Date: Complete applications must be submitted at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
DATE
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
DNR form 28A (Sept 2010)
Construction Permit Application
SCHEDULE A, General Information, page 2
542-3129
SCHEDULE
B Collection system
C Lateral Sewer Extension
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules attached to this application.
INCLUDED IN SUBMITTAL
PROJECT DA 1b
Tl'1'LE
D Trunk & Interceptor Sewer
E Wastewater Pump Station
F Treatment Project Site Selection
G Treatment Project Design Data
H1 Schematic Flow Diagram
112 Treatment Process Loading and
Removal Efficiency
H3 Mechanical Plant Reliability
I Screening, Grit Removal and Flow
Measurement
J Septic Tank System
K1 Controlled Discharge Pond
K2 Aerated Pond
K3 Anaerobic Lagoon
L Setting Tanks
M Fixed Film Reactor — Stationary Media
N Rotating Biological Contactor
O Aeration Tanks or Basins
P Gas Chlorination
Q Sludge Digestion and Holding
Rl Sludge Dewatering and Disposal
R2(A & B) Low Rate Land Application of Sludge
R3 Land Application of Sewage Sludge
(To be developed) ,
S Land Application of Wastewater
(To be developed)
Sewage Treatment Agreement
ATTACHED
E
❑ ❑
❑
E
❑ ❑
❑ ❑
❑ ❑
❑ ❑
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A (Sept 2010)
542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B, Collection system
DA 1h PREPARED
2/24/2015
DATE REVISED
PROJECT IDENTITY
Kinsale Addition - Phase 2, Waterloo
DNR USE
PROJECT NO.
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding, state none.
Segment
NONE
Flooding Protection
NA
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Location
Design capacity, MGD
Peak Hourly Dry weather Flow
MGD (actual)
Peak Hourly Wet Weather Flow
MGD (actual)
Segment
Segment
Segment
8" main to south
under greenhill
Rd.
Garden Avenue
Lift Station
35.0
0.646
2.52
48,000
0.73
2.65
*3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water
Pollution Control Plant, 10 'e3 4/0. 079 O0 /, FED A/O. 00'/ 2. (8 SD
Facility Loading MGD #BODS/day
Design
Average Wet Weather (actual)
Peak Hourly Wet Weather (actual)
18.0
85,000
35.0
31,500
80.0
48,000
Provide projected design loading increase, which will be added to this facility as a result of this project.
Design Loading
Initial
Design Year (e0aO)
Residential service area a0.2. Acres aft. ii Acres
Population 470 Persons 690 Persons
Flow (100 GPCD) 47,000 GPD 69,000 GPD
BOD5 (0.17 #/d/cap) 79.90 #/day 117.30 #/day
Industrial service area Acres Acres
Rated flow GPD GPD
BOD5 #/day #/day
Other Office 0.1 Acres 0.1 Acres
Rated Flow 500 GPD 500 GPD
BOD5 0.85 #/day 0.85 #/day
Total BOD5 80.75 #/day 118.15 #/day
Total Flow 47,500 GPD 69,500 GPD
Peak Hourly Flow 189,425 GPD 270,922 GPD
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C, Lateral Sewer Extension
DATE PREPARED
2/24/15
DATE REVISED
PROJECT IDENTITY
Kinsale Addiiton - Phase 2, Waterloo
DNR USE
PROJECT NO.
PERMIT NO.
1. Design Basis
Residential service area
Population
Flow (100 GPCD)
BOD5 (0.17 #/d/cap)
Industrial service area
Rated Flow
BOD5
Other Office
Rated Flow
BOD5
Total BOD5
Total Flow
Peak Hourly Flow
2. Pipe
Diameter
Material
Joint
Minimum Slope
Maximum Manhole Space
Total Sewer Length
Maximum Cover
Minimum Cover
Initial Design Year (2020 )
20.2
470
47,000
79.90
0.1
500
0.85
80.75
47,500
189,425
Acres
Persons
GPD
#/day
Acres
GPD
#/day
Acres
GPD
#/day
#/day
GPD
GPD
28.4
690
69,000
117.30
0.1
500
0.85
118.15
69,500
270,922
8 Inch 10 Inch 12 Inch
PVC TRUSS
ASTM D2680
ELASTOMERIC
SEALS ASTM
D3202
0.45
394
1,504
10.1
7.0
ft.
ft..
ft.
ft.
ft
ft
ft.
ft.
Acres
Persons
GPD
#/day
Acres
GPD
#/day
Acres
GPD
#/day
#/day
GPD
GPD
ft.
ft.
ft.
ft.
3. Construction specifications (indicate ASTM No. or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class Class I
B. Pipe laying ASTM C-12
C. Compaction ASTM C-12
D. Manhole ASTM C-478
E. Specified maximum infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures Per SUDAS Standard Specifications Section 4060
G. Alignment & grade test procedures
(1) During construction: Stake & batter board Laser X
(2) After construction: Lamping X Other Televising; Air test
H. Deflection test procedures Per SUDAS Standard Sepcifications Section 4060
4. Are detailed manhole drawings included: Yes ❑ No
Typical frame and cover assembly Neenah R-1642
Are manhole covers nonvented: Yes ® No
Manhole diameter 48
Manhole opening diameter 24
in.
in. Material Concrete
5. Minimum sewer & water main separation: Horizontal 10
Are specifications included? SUDAS Standard Specifications
ft. Vertical 18
in.
6. Stream, road, or railroad crossing protection None in project
Are specifications included? NA
IOWA DEPARTMENT OF NATURAL RESOURCES
Wastewater Disposal System Construction Permit
Application Fee Form
CASHIER'S USE ONLY
0945-542-N PD E -CP -0570
32-3202
Owner
Owner Name: Hawkeye Capital Investments, L.L.C.
Address: 999 44th Street, Suite 1000
City, State, Zip: Marion, Iowa 52302
Project Identification: Kinsale Addition - Phase 2 to Waterloo
$100 Fee enclosed
Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources".
Place it and the check or money order on top of other Construction Permit Application documents.
Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by
Iowa Code 4556.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by
Iowa Code 455B.197 and Iowa Administrative Code 567 IAC 64.16(3)"c".
The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump
stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents
necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well
as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as
planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans
precedes submittal of technical documents necessary to constitute a construction permit application. The application
fee is not necessary when submitting a planning document but must accompany construction permit application
documents. A fee should accompany each permit application received on or after July 1, 2006.
Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions
regarding the application fee, please contact Donna Gomm at 515-725-8427 or Donna.Gomm@dnr.iowa.gov
Signature of Owner or Representative:
Printed Name: JAJ y Srin'714
Telephone or email contact: 3/9, 373 — e.(c,
Mail to:
Iowa Department of Natural Resources
Wastewater Engineering Section
502 East 9th Street
Des Moines, IA 50319-0034
11/2014 cmc
DNR Form 542-1245