Loading...
HomeMy WebLinkAboutAspro, Inc.-3/3/2014CITY OF WATERLOO Council Communication City Council Meeting: March 3, 2014 Prepared: February 20, 2014 Dept. Head Signature: Mike Wilson M # of Attachments: 5k SUBJECT: Approval of Change Order #2 in the amount of -$275.75 for Rehabilitation of Taxiway E project for Waterloo Regional Airport. Submitted by: Mike Wilson, Airport Director Recommended City Council Action: Approval of Change Order #2, which decreases the total contract by $275.75, for Rehabilitation of Taxiway E project for Waterloo Regional Airport. Summary Statement Expenditure Required: N/A Source of Funds: N/A Policy Issue Alternative Background Information: This change order includes increases in quantities for Runway and Taxiway Marking, Seeding and Mulching and Airfield Guidance Signs; the deletion of Electrical Manholes and the addition of Electrical Handholes; and the addition of Bituminous Patching for Thermoplastic Signs on the Rehabilitation of Taxiway E project. The net change is a decrease of $275.75 to the total contract amount. This request has been reviewed and approved by FAA. CHANGE ORDER NO. 2 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date February 3, 2014 Project Rehabilitation of Taxiway E Owner's Contract No. FAA AIP Project No. 3-19-0094-41 Contractor Aspro, Inc. Date of Contract Start June 3, 2013 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 19 RUNWAY AND TAXIWAY MARKING (WHITE - REFLECTIVE -WATERBORNE) SF $0.55 14,950.0 $8,222.50 20 RUNWAY AND TAXIWAY MARKING (BLACK -NON - REFLECTIVE -WATERBORNE) SF $0.65 2,815.0 $1,829.75 23 SEEDING AND MULCHING AC $3,650.00 0.6 $2,190.00 30 ELECTRICAL MANHOLE EA $9,130.00 (4.0) ($36,520.00) 34 L -858(L) AIRFIELD GUIDANCE SIGN, SIZE 1, 2 MODULE - LED EA $4,150.00 1.0 $4,150.00 100 ELECTRICAL I-IANDHOLE EA $4,463.00 4.0 $17,852.00 101 BITUMINOUS PATCHING FOR THERMOPLASTIC SIGNS LS $2,000.00 1.0 $2,000.00 Change Order Subtotal ($275.75) Total Amount of Change Order ($275.75) Reason for Change Order: Item 19 & 20 — In order to create more uniform marking at the end of Runway 30, additional marking will be added to the contract. The proposed marking includes all the threshold marks, the entire threshold bar, the 30 numerals, and the edge stripe on both sides of the runway past the 30 numerals. These marks are all white paint marking with black painted around the outside of each mark. Item 23 — More grassed area was disturbed during construction than previously estimated during plan preparation. After field review of all disturbed areas it was found that an additional 0.6 acres of seeding and mulching needs to be included in the contract. Item 30 & 100 — In order to match what is being done in other projects on the airfield, such as the Rehabilitation of Taxiway B, the contractor is being asked to install electrical handholes in lieu of the electrical manholes shown in the contract documents. These two items are included to provide the price reduction for this change. Item 34 — Three airfield guidance signs are shown to be installed in the plan sheets but only two signs are shown in the quantity list. As a result, one airfield guidance sign needs to be added to the contract. Rehabilitation of Taxiway E CO -2 Project No — 60278510 1 Item 101 — There are two locations on Taxiway C where Surface Applied Thermoplastic Holding Position Signs are to be installed but the bituminous pavement is not in acceptable condition to allow the installation. As a result, we are adding this item to the contract to cover the pavement patching that needs to be done prior to the sign application. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 1,083,425.25 Original: 90 Previous C.O.s (ADD): $ 19,237.20 Previous C.O.s (ADD): 21 This C.O. (ADD): $ (275.75) This C.O. (ADD): 0 Contract Price with all REVISED: 111 approved Change Orders: $ 1,102.3 86.70 Original Completion Date: Aug. 31, 2013 90 Revised Completion Date: Sept. 21, 2013 111 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: Engineer (A APPRO �x By: .4, Date Ag prized Signature) Date ell/ 4 Owner (Authorized Signature) ACCEPTED: By: Contrj or (Authorized Signature) 2-//r/� y Date Rehabilitation of Taxiway E CO -2 Project No — 60278510 2