Loading...
HomeMy WebLinkAboutK & W Electric Inc.-3/3/2014 (2)CITY OF WATERLOO Council Communication City Council Meeting: March 3, 2014 Prepared: February 20, 2014 Dept. Head Signature: Mike Wilson # of Attachments: . Lj SUBJECT: Approval of Change Order #3, in the amount of $22,481.75, for Rehabilitation of Airfield Vault project for Waterloo Regional Airport. Submitted by: Mike Wilson, Airport Director Recommended City Council Action: Approval of Change Order #3 for Rehabilitation of Airfield Vault project. Summary Statement Expenditure Required: $22,481.75 Source of Funds: 90% ($20,233.58) FAA; 10% ($2,248.17) PFC Policy Issue Alternative Background Information: This change order provides for a quantity adjustment on the surface applied hold position signs, provisions for airfield lighting control modifications to include the airport beacon, removal of a concrete sidewalk that was buried below surface at the new airfield vault, connection of power to an existing sign and removal of a manhole near the old airfield vault for the Rehabilitation of Airfield Vault project for Waterloo Regional Airport. This request has been reviewed and approved by FAA. CHANGE ORDER NO. 3 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date January 30, 2014 Project Rehabilitate Airfield Vault Owner's Contract No. FAA AIP Project No. 3-19-0094-40 Contractor K&W Electric Inc. Date of Contract Start August 13, 2012 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 6 SURFACE APPLIED THERMOPLASTIC HOLDING POSITION SIGN SF $36.75 249 $9,150.75 103 BEACON CONTROLS IN FAA TOWER LS $8,952.00 1 $8,952.00 104 REMOVE CONCRETE FOR VAULT PARKING AREA LS $475.00 1 $475.00 105 CONNECT POWER TO EXISTING SIGN LS $1,655.00 1 $1,655.00 106 REMOVE EXISTING ELECTRICAL MANHOLE LS $2,249.00 1 $2,249.00 Change Order Subtotal $22,481.75 Total Amount of Change Order $22,481.75 Reason for Change Order: Item 6 — The plan quantity for this item did not includethe black outline around the outside edge of the signs. As a result, the quantity needs to be adjusted to include this outline for each sign. Item 103 — During the shop drawing review for the ALCMS system it was determined that the existing beacon controls were not compatible with the new lighting control system. As a result, the beacon controls need to be connected to the computer in the new electrical vault and added to the touch screen controls. This change will result in an additional cost to program the system and install extra conduit, wire, and equipment. This item covers the costs of this additional work. Item 104 — An existing concrete sidewalk slab was uncovered during grading operations around the outside of the new electrical vault. This pavement needs to be removed so final grading and paving can be completed on this project. Item 105 — The existing sign located near the FBO entrance gate was previously powered from the existing lighting vault. When the existing vault was removed the power was cut to this sign. In order to power the sign a new connection will be made to the existing FBO gate. Item 106 — An existing brick electrical manhole is located just outside the old electrical vault building. The manhole is in poor shape and there are concerns that, if left in place, it will collapse. To ensure it does not, the abandoned Rehabilitate Airfield Vault CO -3 Project No — 60275869 1 conduits connected to the manhole will be plugged, the manhole will be removed, and the subsequent hole will be backfilled with soil. CONTRACT PRICE Original: Previous C.O.s (ADD): This C.O. (ADD): Contract Price with all approved Change Orders: $ 865,905.00 $ 1,540.00 $ 22,481.75 $ 889,926.75 CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 270 0 0 270 Original Completion Date: 270 Revised Completion Date: 270 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: Engineer (!u sized Signature) APPR.�..: giGe' By: Owner (Authorized Signature) ACCEPTED: By: its ate Date Contractor (Authorized Signature) Date Rehabilitate Airfield Vault CO -3 Project No — 60275869 2