CITY OF WATERLOO, IOWA
WASTE MANAGEMENT SERVICES
3505 EASTON AVE. WATERLOO, IA 50702 (319) 291-4553 FAX (319) 291-4523
LARRY N. SMITH SUPERINTENDENT
Council Communication
City Council Meeting: 3/17/14
Prepared: 3/12/14
Dept. Head Signature:
# of Attachments:
SUBJECT: CIP Pipe Lining Service Areas No. 15 and No. 16, Contract #866
Submitted by: Larry N. Smith
Recommended City Council Action: resolution approving award of Contract, Bond and
Certificate of Insurance to Municipal Pipe Tool Co., LLC of Hudson, IA in the amount
of $641,171.36 for City Contract #866, CIP Pipe Lining Service Areas No. 15 and No.
16.
Summary Statement:
Expenditure Required: $641,171.36
Source of Funds: 609-14-5320-2103
Policy Issue:
Alternative:
Background Information:
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
Letter of Transmittal
TO: Mr. Larry Smith
Water Pollution Control Facilities
3505 Easton Avenue
Waterloo, Iowa 50703
WE ARE SENDING YOU:
O Attached
❑ Shop Drawings
O Copy of Letter
O Prints
O Change Order
axoM
DATE: March 11, 2014
JOB ID NO. 60185826 (60163564)
ATTENTION:
RE: Phase I CIP Pipe Lining - Services Areas No. 15 and No. 16
City Contract No. 866
Returned
O Under Separate Cover Via
O Plans
0
❑ Samples
the Following Items:
0 Specifications
Copies
Date
No.
Description
Returned
Original Bid Documents From 3/10/14 Bid Opening
2
Bid Tabulations of Bids Received
THESE ARE TRANSMITTED AS CHECKED BELOW:
O For Approval
O For Your Use
❑ As Requested
❑ For Review and Comment 0
❑ For Bids Due 20
❑ Approved as Submitted
O Approved as Noted
❑ Returned for Corrections
O Resubmit _ Copies for Approval
❑ Submit _ Copies for Distribution
O Return _ Corrected Prints
O Prints Returned After Loan to Us
REMARKS: Larry — We reviewed the low bid from Municipal Pipe Tool, and it appears to be in order. We recommend the
project be awarded to Municipal Pipe Tool in the amount of $641,171.36.
COPY TO: Suzy Schares (w/Bid Tab)
REB:blc
SIGNED:
If enclosures are not as noted, kindly notify us at once.
501 Sycamore Street, Suite 222 P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 Fax: (319) 232-0271
A. OM
April 9, 2014
Mr. Larry Smith
Water Pollution Control Facility
3505 Easton Avenue
Waterloo, Iowa 50702
Subject: Sanitary Sewer Improvements
Service Areas No. 15 and No. 16
Phase I CIP Pipe Lining
City Contract No. 866
AECOM #60163564
Dear Larry,
AECOM 319-232-6531 tel
501 Sycamore Street 319-232-0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
Enclosed please find one (1) copy of the Contract and Bonds for the above -referenced project. These have
been signed by Municipal Pipe Tool and the Mayor. We do not believe they require any further action at this
time.
We will request their Insurance Certificate for this project and provide you copies upon receipt.
If you have any questions or need anything further, please let us know.
Yours sincerely,
Robert E. Bamsey, P.
Enclosures: As Noted
c: Ms. Suzy Schares (w/enclosure)
Municipal Pipe Tool (w/enclosure)
P:\60163564\admn\Letters-Transmittals\4-9-14 Is SA 15&16-Contracts-Bonds.docx
FORM OF CONTRACT
CONTRACT FOR THE CONSTRUCTION OF
SANITARY SEWER IMPROVEMENTS
SERVICE AREAS NO. 15 AND NO. 16
PHASE I CIP PIPE LINING
CITY OF WATERLOO, IOWA
CONTRACT NO. 866
This contract made and entered into this l Y day of
201 by and
between the City of Waterloo, Iowa, a Municipal Corporation, (hereinafter referred to as City), and
Municipal Pipe Tool Company, LLC of Waterloo, Iowa, (hereinafter referred
to as Contractor),
WITNESSETH:
PAR. 1 Contractor agrees to build and construct the SANITARY SEWER IMPROVEMENTS, SERVICE AREAS
NO. 15 AND NO. 16, PHASE I CIP PIPE LINING, City Contract No. 866, and furnish all necessary tools,
equipment, materials, and labor necessary to do all the work called for in the plans and specifications in a
workmanshiplike manner and for the prices set forth in Contractor's proposal, which was accepted by the City, and
which is understood and agreed to be a part of this contract.
PAR. 2 It is understood and agreed that the resolution adopted by the City Council ordering the construction of the
improvement, the Notice to Contractors as published, the Instruction to Bidders, the Form of Proposal, the
Construction and Maintenance Bonds, the Council Proceedings relating to this matter, and the Plans and
Specifications shall all be considered as forming a part of the contract the same as though they were each set out in
said contract.
PAR. 3 The Contractor agrees to furnish at its own cost and expense, all necessary materials and labor for said work and to
construct said improvements in a thorough, substantial, and workmanlike manner, and in strict accordance with the
requirements of this contract, and of the plans and specifications made a part hereof by reference, and to the
satisfaction and approval of the City and its engineer.
PAR. 4 The Contractor agrees to perform said work and install said improvements on the terms set out in bid or proposal to
the City which has been accepted by the City and which is by reference made a part of this contract.
PAR. 5 The Contractor agrees to commence said work within ten (10) working days after receipt of "Notice to Proceed" and
all substantial items shall be completed on or before December 1, 2014, with a final completion date of January 1,
2015, unless an extension of time is granted in writing by the Council of the City.
PAR. 6 Should the Contractor fail to complete said improvements in strict accordance with the terms and conditions of this
contract, or the plans and specifications therefor promptly by the date herein specified, the City may pay such
additional sums as it may be required to pay by reason of the failure of said contractor and deduct any and all such
sums from any amount then due the Contractor.
PAR. 7 The Contractor agrees to comply with and obey all ordinances of the City of Waterloo, Iowa, relating to the
obstruction of streets and alleys, keeping open passage ways for water, traffic, and protecting any excavations in any
street or alley, and maintaining proper and sufficient barricades with lights and signals during all hours of darkness,
to see that the backfilling is properly done, and agrees to keep the City whole and defend any and all suits that may
FORM OF CONTRACT
60163564 (60185826)
CONTRACT NO. 866 C-1 of 3
be brought against the City by reason of any injuries that may be sustained by any person or property allegedly
caused by the Contractor, or his agents, while work is done pursuant to this agreement.
PAR. 8 The Contractor agrees that in the event a law suit is brought against the City for damages allegedly sustained by
reason of any act, omission or negligence of the Contractor or its agents, or on account of any injuries allegedly
sustained by reason of any obstruction, hole, depression or barrier placed or dug by the defendant or its agents, in
the doing of the work herein contracted for, that it will defend said suit and save the City harmless therein, and in
case judgment is rendered against the City, the Contractor agrees to pay the same promptly. The Contractor agrees
to carry public liability insurance in a solvent company in a sufficient amount to protect the City and those who use
the streets of the City.
PAR. 9
The City shall have the right to appoint one or more construction reviewers who shall review the progress of the
work in detail; also, to make any test or any material to be used in such work. No material shall be used in any
work until the same has first been approved by the construction reviewer. Such construction reviewer shall have
full authority to pass judgment upon all materials and upon the manner of doing the work, and their judgment on
rejecting any materials, substance, or manner of work shall be final unless it is revoked or modified by the City
Engineer.
PAR. 10 Any material, which has been rejected by the construction reviewer, shall be at once removed from the line of work
and shall not be again taken thereon or placed with the material proposed to be used without the written consent of
the City Engineer.
PAR. 11 The Contractor shall maintain no cause of action against the City on account of delays and prosecution of work, but
if said work is delayed by the City, the Contractor shall have such extra time for completion of the job as was lost
by reason of the delay caused by the City.
PAR. 12 The Contractor agrees to pay punctually all just claims of labor, material, men, or subcontractors who shall perform
labor or furnish materials entering into this improvement. It is agreed that the City need not pay the Contractor until
all such claims are paid by the Contractor. It is agreed that the City shall not be liable for said labor, material, or
men under this contract.
PAR. 13 The Contractor agrees to furnish the City, simultaneously with this contract, a bond on a form to be provided by the
City in the amount provided by law as stated in the Notice to Bidders, which shall be for the benefit of the City, and
any and all persons injured by the breach of any of the terms of this contract. Said bond shall be filed with the City
Clerk and shall be subject to the approval of the City Council, and is by reference made a part of this contract.
PAR. 14 The Contractor agrees that should it abandon work under this contract or cease the prosecution thereof for a period
of thirty (30) consecutive days without reasonable cause, and should it fail to proceed with said work within ten (10)
days after a notice to continue or carry it on has been mailed to it at the address given herein by the City, or after
such notice has been served on it, then the City may proceed to complete said work, using any material, tools, or
machinery found along said line of work, doing the work either by contract or as it may elect, and the Contractor
and the sureties on its bond shall be liable to the City for the costs and expenses so paid out. Said costs shall be
retained by the City from any compensation due, or to become due the Contractor, and may be recovered by the
City in an action upon Contractor's bond.
PAR. 15 In consideration of the full compliance on the part of the Contractor with all the provisions, stipulations, and
conditions hereof, or contained in the various instruments made a part of this contract by reference, and upon
completion and acceptance of said work, the City agrees to pay to the Contractor, in the manner set out in the Notice
to Contractors, the amount of money due the Contractor for work performed and accepted, at the unit prices set out
in the Contractor's proposal, which has been accepted by the City.
PAR. 16 The total amount of the contract, based on the Engineer's estimates of quantities and the Contractor's unit bid prices,
and for which 100% surety bond is required is $641,171.36.
FORM OF CONTRACT
60163564 (60185826)
CONTRACT NO. 866 C-2 of 3
PAR 17 After the completion of said work, the Contractor agrees to remove all debris and clean up said streets, and to save
the City harmless from any damage allegedly resulting from a failure to clean up and remove the debris or put the
street back in a proper condition for travel.
PAR. 18 This contract is not divisible, but in the event of a conflict between this contract and the various instruments
incorporated by reference, this contract shall govem.
PAR. 19 Before the Contractor shall be entitled to receive final payment for work done under this contract, it shall execute
and file a bond in the penal sum of not less than 100% of the total amount of the contract, same to be known as
"Maintenance Bond," and which bond must be approved by the City Council, and which bond is in addition to the
bond given by the Contractor to guarantee the completion of the work.
PAR. 20 The Contractor shall maintain all work done hereunder in good order for the period of two (2) years from and after
the date it is accepted by the Council of the City of Waterloo, Iowa. Said maintenance shall be made without
expense to the City or the abutting property. In the event of the failure or default of the Contractor to remedy any or
all defects appearing in said work within a period of two (2) years from the date of its acceptance by said Council,
and after having been given ten (10) days notice so to do by registered letter deposited in the United States Post
Office in said town, addressed to said contractor at the address herein given, then the City may proceed to remedy
such defects. The costs and expenses thereof to be recovered from the Contractor and the sureties on its
maintenance bond by an action brought in any court of competent jurisdiction.
PAR. 21 The Contractor shall give notice to said City by registered letter directed to the Mayor or City Clerk/Auditor thereof
not more than four (4) and not less than three (3) months prior to the expiration of the term during which the
Contractor is required to maintain said improvements, in good repair by the terms of its Contract. The liability of
the Contractor and of the sureties on its bond for maintenance of the said improvements shall continue until three
(3) months after such notice has been given to the City, and, in any event, until two (2) years after the acceptance of
the work.
MUNICIPAL PIPE TOOL COMPANY, LLC.
Contractor
BY:
Title: (-07-)
Approved by the City Council of the City of Waterloo, Iowa, this Q day of /lAtiM'LL- , 20141-
A Fl EST:
0141:
A1'1'EST:
FORM OF CONTRACT
60163564 (60185826)
Waterloo, 'owa
, City Clerk
CONTRACT NO. 866 C-3 of 3
ZJu 1-B3d
(9Z8S8109)49SE9109
998 "ON L a.LNOD UN011 aoNVIATIMIlaci
•1apuaS
laltau JO amu 1110] `au![naS U1 cap ao 'Jaqumu ismid 10 "gaup atp `ainudoadde se 'apni pap uwaq pasn sufay
puoq snp Jo ltnouae Tetrad atp paaaxa.uopedggo Imo) sA ainS cup Treks liana ou ut lova
pue aalo3 jrl3 ut u!eutau Rugs It ast,►taagto 'p!on pug iinu 0q dugs puoq sqp Up yatuluoD aql suuopad ied!ouud 01•P 3i
•paldaa'se sere► 31100A tans atup atp lu aaSggp agl of u touai m palanoos!p
lou tsualau ao deg oM ut loajap ao3 puoq stgl uo ani of ltiq!a agloM ag)Jo aoutid000e alpjo amp alp
wog mak (i) auo uetp seat 03 st!ug q°,144 P?m Oq' 1113gs 100=00 .101430 AMU) 10 puoq 4/12 .10 uo!s!nold ou .E
•asualou! s•saoxa Bans of se Arco pasnow act uagl tuts put! '900 Immo mot otp jo (o,.QZ) waaaad uannl U q1
aa=ta uo asnalotn to NOM! lou soop a2uego Irons uagAt l I U0D 10 'suo!1saq!o'ads'sueid Mg u! Amp fate oy
•loeatuo0 ogl ttuojaad of 'mot u! iou11uo0 alp of amp 30 u0!sualta Aun o,1,
'Z
:aopou tnoglu+n'swum $mntollo3 alpjo tls
Pub IMO 01 luasuoo 01'Su!puetsqunntou AMMO alp of t0el1u00 Ane `Play pun plump 11q Qgis puoq snp uo Aiaans Aa243
•sasuadxa pun saa3 ,s(owo u aigauoseas of pawpolpuu lou inq Su!pnput quaw oiojua;o woo 1te put Aue lamas
Pu? Wag ssattl nq °!TqO Plod Pug oggO Al!uuu0Pul of 00igu Awns pie isdloupd 'p00103ue s! puoq s!q1 tuana aql ul
•opplopoead
se uoos se lunow lug* azdqqa atp And Pus oaltiqa s n of of pm s! 1! gotgAt 1103 Mot= 0tll ou!tumoa
ao `iet!owad agt 0i aa8!ig0 aql Aq pird Apadold lunou1n aql ssai 'ola tote sluowpuaum Ate pus laexluo0
aqa lapun pul!ouuj agl of aaftma act Aq atgeAnd mown mot alp smut „aoud la1uo0 ag130 0OU11 %.
tuna au •ioe1Rto0 agl u! paptpis ate salemep plumb!! ou 3! saSuaiep imam 10 sat polup nbti
pus ylnejap sdediouud alp tuog Aonp Sure= slson tsuo!ssajoad u± [sap pun peSa! s‘aallggo alp' nflua°
agl jo topatdmoo Pus anp33ap 3o uopoauoo 10.3 Pad100941 aql 30 sag!taq! 110dsaa sapntou! uoparduaoa
301503 011.1. •ao!Id raennoo alp jo aousieq a,* SSi uopaidul0o 30 isoo alp And w spun3 lualo! ns sassadour
>11011ct sn atqul!nne anew. mm Awns ou .aafflpla oil pus Aped tions uaamaaq =woo n ao3 ague= 'lnsoz%ad
pawpaw 10 `aapptq arq!suo )sal sottot agl 3o Aputo[ prams aql pus cam Aq uogeu!tuaatap uodn
'nom aaBliga alp 3! `aa 'modal(' palepoSau ao 'mpplq a)gtsuodsat !soma! alp jo bjaans alp q uopnutuuatap
uodn pus 'suop!puoo pun suuo* et! tp!M. aouepaoaan uc 1004uo0 ftp Supaidutoo ao3 sptq atom ao au0 Tem
w !suort!pu0o pre sitar sallow. aouep10oou 111 t3iluo0 alt atardt11o0
'£
.z
'1
:01 analrapun Apdtuaad pugs 10'Troia') ftp 4owa1 Apdtuoid
Aetu `aouassa ftp 3o st auap imp Su!Spalnt0wp11 'Alms ogl uatp losaiuo0 11133 u! suo! ancio sl! patu1o31ad Otunsq
aaS!Ig0 art Imre 1 -Ammo mA aopun tinRJap u! aq of aaang0 alp Aq PPP s! Pus of trate 1nd!au!ad 0131 aanauagm
1l!atag qxo310 Ailn3 gSnotp se aatlaaa301 Aq tumor' paiaaodaoouc st Ttuoa
S'Imun ad!d`dl0 '91 m0At pus 51 TN stow for '''sattantamaidittraainas dries
3a asrximd ftp 103 b 6OZ ' L 6143) e W lnoge 10 uo Patep ( 1100„ 2T) 124141°2n WA u0poauu00 In tuns p!us3o luamAnd agl 103'satgs MK' 04130 Am/ PP 1 s( ---9£" 616 ` 6179--
$)s ftoa 006/9£'8 auO /twangs peapunH 9110 puesnogi eu0 A.t.lod po punH xis Jo tuns Mud 00 ut
`%. !i(10» ) em0I 'o01111w j0 Al!0 o o un Punct ART Pus PPR am `( 3omS,4 otTO
eMol `seuloV sea 30 (lenlnW) Auedwo9 6wpuos sluegoaeol Pug' dui:4=Pd.043)
wino! 'uospnH 3o ori "00 ed!d 113d101unvl ` ' WILL
04*
ONNOa 1k1V112IO.1H1a
A 03
:S33S32Id 3S3H.L Afl NSW TY NODI
LS££85Ob'1 '3N 31339
IN WITNESS WHEREOF, the undersigned Principal and Surety have executed this Performance Bond as of
March 25, 2014
PRINCIPAL SURETY
Municipal Pipe Tool Co., LLC Merchants Bonding Company (Mutual)
Name Name
By: Wa/gC14,klia By:
S hare, rt Wet,s cklt_rd , Dione R. Young
Title: C� ta Tide: Attorney -in -Fact
[attach Power of Attorney]
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
If this project includes Federal Funds, the following applies to the payment bond:
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list
(Circular 570 as amended) and be authotized to transact business in the State where the project is located.
PERFORMANCE BOND
60163564 (60185826)
CONTRACT NO. 866 PFB-2 of 2
Bond No. IAC583357
KNOW ALL MEN BY THESE PRESENTS: that
a Corporation
PAYMENT BOND
MUNICIPAL PIPE TOOL COMPANY.. LLC
(Name of Contractor)
515 - 5TH Street. P.O. Box 398. Hudson. Iowa 50643
(Address of Contractor)
(Corporation, Partnership or Individual)
Merchants Bonding Company (Mutual)
, hereinafter called Principal,
(Name of Surety)
2100 Fleur Drive, Des Moines, Iowa 50321-1158
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto
CITY OF WATERLOO. IOWA
(Name of Owner)
71;5 MULB Y STREET. WATERLOO. IOWA 50703
(Address of Owner)
hereinafter called OWNER, in the penal sum of Six Hundred Forty One Thousand One Hundred Seventy One & 36/100
Dollars,(S-1,171.36—) in lawful money of the United States, for the payment of which sum well and truly to be made,
we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract with the
OWNER., dated the 17th day of March 2014 , a copy of which is hereto attached and
made a part hereof for the construction of:
SANITARY SEWER IMPROVEMENTS.
SERVICE AREAS NO. 15 AND NO. 16
PHASE I CIP PIPE LINING
CITY CONTRACT NO. 866
CITY OF WATERLOO. IOWA
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, fums, SUBCONTRACTORS, and
corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract,
and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal
and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such
WORK, and all insurance premiums on said WORK, and for all labor, performed in such WORK whether by
SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the
SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive
notice of any such change, extension of time, alteration or addition to the terms of the contract or the WORK or to the
SPECIFICATIONS.
PAYMENT BOND
60163564(60185826)
CONTRACT NO.866 PB -1 of 2
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of
any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS HEREOF, this instrument is executed in four (4) counterparts, each one of which shall be deemed
(number)
an original, this the 25th day; of March , 2014
ATTEST:
5litL/-ov7 gjak-k 7J -
(SEAL)
(Principal) Secretary
Municipal Pipe Tool Co., LLC
Principal
By 11�� W�a%l l r
Share A Wase Y.0e) Cob
P. O. Box 398
(Address)
Hudson, IA 50643-0398
Witness as to Principal' ,p611 UQil1 Ctrl rowt, 1164m fn iS3ark' am
P. O. Box 398, Hudson, IA 50643-0398
(Address)
ATTEST:
Witness as to Surety Anne Crowner
P. O. Box 9207, Des Moines, IA 50306-9207
(Address)
Merchants Bonding Company (Mutual)
Surety
By
Attorney -in -Fact Dione R. Young
Holmes Murphy & Associates, Inc.
P. O. Box 9207
(Address)
Des Moines, IA 50306-9207
NOTE: Date of BOND must not be prior to date of Contract.
If CONTRACTOR is Partnership, all partners should execute BOND.
If this project includes Federal Funds, the following applies to the payment bond:
IMPORTANT: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular
570 as amended) and be authorized to transact business in the State where the project is located.
PAYMENT BOND
60163564(60185826)
CONTRACT NO. 866 PB -2 of 2
Bid Tabulation
SANITARY SEWER IMPROVEMENTS
SERVICE AREAS NO. 15 AND NO. 16 CIP PIPE LINING
Waterloo, IA
BidTab Summary
AECOM Project No: 60163564
March 10, 2014
L:\work\project\60163564\eng\20140203 Engineers Estimate\Area 15 and 16 Eng Est - Bib Tab.xlsx
Engineers Estimate
Municipal Pipe Tool Co.
SAK Consruction
Visu-Sewer, Inc.
Item
Description
Unit
Estimated Quantity
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
Unit Price
Total Price
BASE BID
1
8 -Inch Diameter CIP Pipe Lining
LF
23221
$ 25.00
$ 580,525.00
$ 23.21
$ 538,959.41
$ 24.85
$ 577,041.85
$ 31.60
$ 733,783.60
2
10 -Inch Diameter CIP Pipe Lining
LF
495
$ 30.00
$ 14,850.00
$ 26.96
$ 13,345.20
$ 25.60
$ 12,672.00
$ i 52.00
$ 25,740.00
3
Internal Chimney Seal
EA
57
$ 1,000.00
$ 57,000.00
$ 336.00
$ 19,152.00
$ 335.00
$ 19,095.00
$ 525.00
$ 29,925.00
4
External Chimney Seal
EA
57
$ 1,200.00
$ 68,400.00
$ 509.25
$ 29,027.25
$ 510.00
$ 29,070.00
$ 685.00
$ 39,045.00
5
Manhole Barrel Joint Leak Repair
EA
25
$ 2,500.00
$ 62,500.00
$ 525.00
$ 13,125.00
$ 500.00
$ 12,500.00
$ 700.00
$ 17,500.00
6
Manhole Lining
EA
25
$ 7,500.00
$ 187,500.00
$ 1,102.50
$ 27,562.50
$ 1,105.00
$ 27,625.00
$ 98.00
$ 2,450.00
TOTAL BID
$ 970,775.00
$ 641,171.36
$ 678,003.85
$ 848,443.60
L:\work\project\60163564\eng\20140203 Engineers Estimate\Area 15 and 16 Eng Est - Bib Tab.xlsx