Loading...
HomeMy WebLinkAboutJ & K Contracting-4/7/2014mayor BUCK CLARK COUNCIL MEMBERS 066.1,........®..®.® DAVID JONES IVard l CAROLYN COLE !lard 2 PATRICK MORRISSEY ti`ard QUENTIN IN I IART Ward 4 RON WEEPER Ward ir-d TOM LIND it -Large STEVE SCI IM TT At -Large CITY OF WATERLOO, IOWA WASTE MANAGEMENT SERVICES 3505 EASTON AVE. WATERLOO, IA 50702 (319) 291-4553 FAX (319) 291-4523 LARRY N. SMITH SUPERINTENDENT Council Communication City Council Meetings 4/7/14 Prepared: 4/2/14 e - Dept. Head Signatures) !- # of Attachments: SUBJECT: Change order #2 for Contract 849, No Name Creek Interceptor Sewer Submitted by: Brian Rath Recommended City Council Action: Bedrock was found to extend into the bottom of the proposed trench west of Sanitary Manhole #3. This change order covers the additional cost of the rock excavation to allow for the sanitary sewer pipe installation. Change order is for a $60,000 increase. Summary Statements Change order #2 of $60,000 still keeps cost under next lowest bid of $1,300,000.00 Expenditure Required: Source of Funds: Sewer Bond Policy Issues Alternative: Background Informations WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer Letter of Transmittal TO: Mr. Larry Smith Water Pollution Control Facility 3505 Easton Avenue Waterloo, Iowa 50702 WE ARE SENDING YOU: O Attached O Shop Drawings O Copy of Letter ❑ Prints ❑ Change Order A=COM DATE: March 27, 2014 JOB ID NO. 60312465 ATTENTION: RE: No Name Creek Interceptor Sewer City Contract No. 849 ❑ Under Separate Cover Via 0 Plans 0 0 Samples the Following Items: 0 Specifications Copies Date No. Description 3 Change Order No. 2 for Above -Referenced Project THESE ARE TRANSMITTED AS CHECKED BELOW: O For Approval O For Your Use O As Requested O For Review and Comment O For Bids Due 20 ❑ Approved as Submitted ❑ Approved as Noted 0 Returned for Corrections O For Signature ❑ Resubmit _ Copies for Approval O Submit _ Copies for Distribution ❑ Return Corrected Prints O Prints Returned After Loan to Us REMARKS: Larry -- The attached Change Order No. 2 is for your use in preparing documents needed to submit to Council for approval. Please sign all three (3) copies of this Change Order, keep one (1) for your files and return two (2) to our office for further processing. If you have any questions, please let us know. COPY TO: Todd Allyn, PE (w/enclosure) blc SIGNED: C Robert E. Bam4y, P.E. If enclosures are not as noted, kindly notify us at once. 501 Sycamore Street, Suite 222 • P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 Fax: (319) 232-0271 CHANGE ORDER NO. 2 Owner City of Waterloo Date: March 26, 2014 Project No Name Creek Interceptor Sewer Owner's Contract No. 849 Contractor: J&K Contracting Date of Contact Start January 15, 2014 Contract Amount: $ 869,679.00 You are directed to make the following changes in the Contract Documents. Description: 2-1 Rock Excavation (243.9 CY @ $246.00/CY) $ 60,000.00 TOTAL ADDITIONS $ 60,000.00 Reason for Change Order 2-1 Bedrock was found to extend into the bottom of the proposed trench west of Sanitary Manhole No. 3. This change order covers the additional cost of the rock excavation to allow for the sanitary sewer pipe installation. CONTRACT PRICE CONTRACT TIME To Substantial To Final Completion Completion Original: $ 869,679.00 Original Completion Date: 1 4/15/2014 Previous C.O.s (ADD/DEDUCT) $ 120,000.00 This C.O. (ADD/DEDUCT) $ 60,000.00 Revised Completion Date: 1 4/23/2014 Contract Price with all approved Change Orders: $ 1,049,679.00 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATION ND CONVENAN1S OF THE CONTRACT SHALL APPLY HERETO. APPROVED: BY: Owner (Authorized Signature ACCEPTED: BY: Contracto (A or ed ACCEPT BY: tit I/ Date 1/2.V -zoof Date 3-wv-14/ 3/117 //11 Date AECOM 603124651 2 Project No. C.O. No.