Loading...
HomeMy WebLinkAboutIowa Department of Natural Resources-4/28/2014Mayor BUCK CLARK COUNCIL MEMBERS DAVIT) JONES Ward CAROLYN COI .E Ward 2 PATRICK MORRISSEY Ward QUEN IN IIAR1' Ward 4 RON WELDER Ward TOM LIND At -Lame STEVE SCI (MITT At -Large CITY OF WATERLOO, IOWA WASTE MANAGEMENT SERVICES 3505 EASTON AVE. WATERLOO, IA 50702 (319) 291-4553 FAX (319) 291-4523 LARRY N. SMITH SUPERINTENDENT Council Communication City Council Meeting: 4/28/14 Prepared: 4/22/2014 Dept. Head Signature: a/244/4 eirs. # of Attachments: SUBJECT: IDNR Construction Permit Application Submitted by: Larry N. Smith, WMS Superintendent Recommended City Council Action: Resolution approving Construction Permit Application with the Iowa Department of Natural resources for the wastewater disposal system construction in conjunction with WPCF Belt Press Addition City Contract 869. Summary Statement: Expenditure Required: $100.00 Source of Funds: Policy Issue: Alternative: Background Information: WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer IOWA DEPARTMENT OF NATURAL RESOURCES Wastewater Disposal System Construction Permit Application Fee Form CASHIER'S USE ONLY 0945-542- N P D E -C P-0570 32-3202 Owner Owner Name: City of Waterloo, IA Address: 715 Mulberrty St City, State, Zip: Waterloo, IA 50703 Project Identification: Construction for Water Pollution Control Facility Belt Press $100 Fee enclosed Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources". Place it and the check or money order on top of other Construction Permit Application documents. Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by Iowa Code 455B.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by Iowa Code 4556.197 and Iowa Administrative Code 567 IAC 64.16(3)"c". The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans precedes submittal of technical documents necessary to constitute a construction permit application. The application fee is not necessary when submitting a planning document but must accompany construction permit application documents. A fee should accompany each permit application received on or after July 1, 2006. Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions regarding the application fee, please contact Donna Gomm at 515-281-8502 or iDonna.Gornm Jdnr.iowa.gov Signature of Owner or Representative: Printed Name: La.'? s pi% Telephone or email contact: 3j 9 - oZ 9 -- `JSP r 3 Mail to: Iowa Department of Natural Resources Wastewater Engineering Section 502 East 9th Street Des Moines, IA 50319-0034 06/2011 cmz DNR Form 542-1245