Loading...
HomeMy WebLinkAboutIowa Erosion Control Inc.-7/7/2014CITY OF WATERLOO Council Communication City Council Meeting: July 7, 2014 Prepared: July 1, 2014 Dept. Head Signature: Eric Thorson, PE, City Engineer # of Attachments: SUBJECT: CHANGE ORDER NO. 1 -- $22,069.42 INCREASE F.Y. 2014W. AIRLINE HIGHWAY REHABR1TATION Contract No. 827 IOWA EROSION CONTROL, INC. Submitted by: Dennis Gentz, PE, Assistant City Engineer Recommended City Council Action: Staff has reviewed this Change Order and recommends that the Mayor be authorized to sign it on behalf of the City. Summary Statement Change Order No. 1 is for the increased amount of $22,069.42. The work related to this change order is due to field conditions that were unknown at the time the project was designed. Expenditure Required Source of Funds Local Option Sales Tax Funds Policy Issue N/A Alternative N/A Background Information CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2014 W. AIRLINE HIGHWAY REHABILITATION CONTRACT NO. 827 Date Prepared: June 12, 2014 AMOUNT: $ 22,069.42 INCREASE TO: IOWA EROSION CONTROL, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 21, 2014 A. Description of change to be made or extra work to be done: 1001 Remove existing paving — widening section and patch 1002 Replace pavement displacement with Modified Subbase 1003 Remove existing driveway or paved shoulder 1004 Replace driveway or paved shoulder, 6" PCC 1005 Replace miscellaneous paving at Leversee Rd. 1006 Trim the subbase 1007 Jackhammer edge of existing paving at Leversee Rd. 1008 Place sand in spalled areas of old paving 1009 Delete fabric under full width paving where subbase was placed B. Reason for ordering change or extra work: 1001 Widening of 3'x10" paving section was too high 1002 Bring area to grade for paving 1003 Removal of existing driveway or paved shoulders was not included in original plans 1004 Replace existing paved driveways or shoulders to adjoin new paving 1005 Additional paving at intersection needs replacement to tie into new — handwork 1006 Get the subbase area ready for paving — not included in original plan 1007 Additional removal at BOP due to existing paving section — special removal method 1008 Need to fill in low areas on old concrete to provide a uniform surface for overlay 1009 Portion of paving placed on subbase did not need fabric that was specified for overlay Page 1 of 2 C. Settlement for cost of work to be made as follows: 1001. Remove Additional Paving 1002. Modified Subbase 1003. Remove driveway/shoulder 1004. Driveway/shoulder, 6" PCC 1005 Misc. PCC Replacement-Leversee 1006 Trimming Rock Base 1007 Jackhammer edge at Leversee 1008 Sand in spalled areas 1009 Fabric under full width area — deduct IOWA EROSION CONTROL, I TOTAL INCREASE r L LS @ $5,000.00 = $ 5,000.00 319.64 ton @ $26.40/ton = $ 8,438.50 75 x SY@ $9.00/SY = $ 675.00 55.7 x SY@ $70.40/SY = $ 3,921.78 26.9 SY @ $105.60/SY= $ 2,840.64 LS @ $1,265.00 = $ 1,265.00 LS @ $302.50 = $ 302.50 LS @ $401.50 = $ 401.50 LS @( $775.00) = $ ($775.00) $ 22,069.42 CONTRACTOR BY: TITLE: Vice President 06/25/2014 Date APPROVED: APPROVED: City Engineer (0/z/`q Date Mayor Page 2 of 2 Date Date