HomeMy WebLinkAboutMurphy Tracter & Equipment Company, Inc.-7/28/2014THIS AGREEMENT, made as of
BY AND BETWEEN
Form of
CONTRACT AGREEMENT
City of Waterloo
AAP Project No. 349-0094-043
�L e
, 2014, is
the OWNER: City of Waterloo, Iowa, 715 Mulberry Street, Waterloo, Iowa 50703
And the CONTRACTOR: Murphy Tractor & Equipment Company, Inc.
3469 West Airline Highway
Waterloo, Iowa 50703
WITNESSETH:
WHEREAS it is the intent of the Owner to purchase equipment for the Waterloo Regional Airport,
IWat rdoo, Iowa, generally described as follows;
Snow Removal Equipment (Front End Loader)
hereinafter referred to as the Project.
NOW THEREFORE in consideration of the mutual covenants hereinafter set forth, OWNER and
CONTRACTOR agree as follows:
Article 1 - Work
It is hereby mutually agreed that for and in consideration of the payments as provided for herein to
the CONTRACTOR by the OWNER, CONTRACTOR shall faithfully furnish all necessary labor,
equipment, and material and shall fully perform all necessary work to complete the Project in strict
accordance with this Contract Agreement and the Contract Documents.
Article 2 — Contract Documents
CONTRACTOR agrees that the Contract Documents consist of the following: this Agreement,
General Terms and Conditions, Supplementary Provisions, Technical Specifications and Drawings,
all issued addenda, Notice -to -Bidders, Instructions -to -Bidders, Proposal and associated attachments,
Required Bonds, Insurance certificates, documents incorporated by reference, documents
incorporated by attachment, and all OWNER authorized change orders issued subsequent to the date
of this agreement. All documents comprising the Contract Documents are complementary to one
another and together establish the complete terms, conditions and obligations of the CONTRACTOR.
All said Contract Documents are incorporated by reference into the Contract Agreement as if fully
rewritten herein or attached thereto.
AECOM Project #60323419 CA -1
Snow Removal Equipment
(Front End Loader)
Waterloo Regional Airport
Article 3 — Contract Price
In consideration of the faithful performance and completion of the Work by the CONTRACTOR in
accordance with the Contract Documents, OWNER shall pay the CONTRACTOR an amount equal
to:
Two Hundred Forty -Three Thousand Four Hundred Ninetv-Four Dollars and No/100 ($243,494.00)
(Amount in Written Words) (Amount in Numerals)
subject to the following;
a. Said amount is based on the schedule of prices and estimated quantities stated in
CONTRACTOR'S Bid Proposal, which is attached to and made a part of this Agreement;
b. Said amount is the aggregate sum of the result of the CONTRACTOR'S stated unit prices
multiplied by the associated estimated quantities;
Article 4 — Payment
Upon the completion of the work and its acceptance by the OWNER, all sums due the
CONTRACTOR by reason of faithful performance of the work, taking into consideration additions to
or deductions from the Contract price by reason of alterations or modifications of the original
Contract, will be paid to the CONTRACTOR by the OWNER after said completion and acceptance.
The acceptance of final payment by the CONTRACTOR shall be considered as a release in full of all
claims against the OWNER, arising out of, or by reason of, the work completed and materials
furnished under this Contract.
OWNER shall make progress payments to the CONTRACTOR in accordance with the terms set forth
in the General Terms and Conditions.
Article 5 — Contract Time
The CONTRACTOR agrees to commence work within ten (10) calendar days of the date specified in
the OWNER'S Notice -to -Proceed. CONTRACTOR further agrees to complete said work within 180
calendar days of the commencement date stated within the Notice -to -Proceed.
It is expressly understood and agreed that the stated Contract Time is reasonable for the completion
of the Work, taking all factors into consideration. Furthermore, extensions of the Contract Time may
only be permitted by execution of a formal modification to this Contract Agreement in accordance with
the General Terms and Conditions and as approved by the OWNER.
Article 6 — Liquidated Damages
The CONTRACTOR and OWNER understand and agree that time is of essence for completion of the
Work and that the OWNER will suffer additional expense and financial loss if said Work is not
completed within the authorized Contract Time. Furthermore, the CONTRACTOR and OWNER
recognize and understand the difficulty, delay, and expense in establishing the exact amount of actual
financial loss and additional expense. Accordingly, in place of requiring such proof, the
CONTRACTOR expressly agrees to pay the OWNER as liquidated damages the non -penal sum of
$100.00 per day for each calendar day required in excess of the authorized Contract Time.
Furthermore, the CONTRACTOR understands and agrees that:
a. the OWNER has the right to deduct from any moneys due the CONTRACTOR, the amount of
said liquidated damages;
AECOM Project #60323419 CA -2 Snow Removal Equipment
(Front End Loader)
Waterloo Regional Airport
b. the OWNER has the right to recover the amount of said liquidated damages from the
CONTRACTOR, SURETY or both.
Article 7 — CONTRACTOR'S Representations
The CONTRACTOR understands and agrees that all representations made by the CONTRACTOR
within the Proposal shall apply under this Agreement as if fully rewritten herein.
Article 8 — CONTRACTOR'S Certifications
The CONTRACTOR understands and agrees that all certifications made by the CONTRACTOR
within the Proposal shall apply under this Agreement as if fully rewritten herein.
Article 9 — Miscellaneous
a. CONTRACTOR understands that it shall be solely responsible for the means, methods,
techniques, sequences and procedures of manufacturer in connection with completion of the
Project Work;
b. CONTRACTOR understands and agrees that it shall not accomplish any work or furnish any
materials that are not covered or authorized by the Contract Documents unless authorized in
writing by the OWNER or ENGINEER;
c. The rights of each party under this Agreement shall not be assigned or transferred to any
other person, entity, firm or corporation without prior written consent of both parties;
d. OWNER and CONTRACTOR each bind itself, their partners, successors, assigns and legal
representatives to the other party in respect to all covenants, agreements, and obligations
contained in the Contract Documents.
Article 10 — OWNER'S Representative
The OWNER'S Representative, herein referred to as ENGINEER, is defined as follows:
David B. Hughes, PE
AECOM
501 Sycamore Street, Suite 222
P.O. Box 1497
Waterloo, Iowa 50704-1497
Said ENGINEER will act as the OWNER'S representative and shall assume all rights and authority
assigned to the ENGINEER as stated within the Contract Documents in connection with the
completion of the Project Work.
AECOM Project #60323419 CA -3 Snow Removal Equipment
(Front End Loader)
Waterloo Regional Airport
IN WITNESS WHEREOF, OWNER and CONTRACTOR have executed five (5) copies of this Agreement
on the day and year first noted herein.
OWNER CONTRACTOR
Name: CITY OF WATERLOO, IOWA
Address: 715 MULBERRY STREET
By:
ATERLOO, IOWA 50703
gnature
AC
rt/e of Re
sentative
Name: MURPHY TRACTOR & EQUIPMENT
COMPANY, INC.
Address: 3469 WEST AIRLINE HIGHWAY
By:
WATERLOO, IOWA 50703
Signature
AZ9--,-VC/‘ tri2e71,-ee
Title of Representative
ATTE
By.
Signature
Ti 17�_�
AECOM Project #60323419 CA -4 Snow Removal Equipment
(Front End Loader)
Waterloo Regional Airport
A=COM
September 22, 2014
Murphy Tractor & Equipment Company, Inc.
3469 West Airline Highway
Waterloo, Iowa 50703
Subject: Snow Removal Equipment
Front End Loader
Waterloo Regional Airport
FAA AIP Project No. 3-19-0094-043
AECOM #60323419
Gentlemen:
AECOM 319-232-6531 tel
501 Sycamore Street 319-232-0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
On behalf of the City of Waterloo, this letter hereby serves as your Notice to Proceed for the above -referenced
project. The work on this contract is to be completed within 180 calendar days of this Notice to Proceed. In the
event that said project is not completed within the specified number of calendar days, the contract provides for
an assessment of $100.00 per day ($100.00/day) as liquidated damages for each working day in excess of the
authorized Contract time of 180 calendar days.
Please proceed with this contract and complete it at your earliest convenience. Should you have any questions
or need any additional information, please let us know.
Yours sincerely,
David B. Hughes, PE
c: Waterloo Regional Airport
City of Waterloo
Mr. Don Harper, FAA
P:\60323419\00000000\600 -Construction Support\620 Correspondence\621.2 - Agrmnts-Contracts-NTP-Cert of Ins\9-22-14 NTP Front -End Loader - Murphy Tractor & Equip.docx
Letter of Transmittal
TO: Murphy Tractor & Equipment Company, Inc.
3469 West Airline Highway
Waterloo, Iowa 50703
WE ARE SENDING YOU:
❑x Attached
❑ Shop Drawings
❑ Copy of Letter
❑ Prints
El Change Order
AXOM
DATE: September 19, 2014
JOB ID NO. 60323419
ATTENTION:
RE: Snow Removal Equipment
Front End Loader
Waterloo Regional Airport
FAA AIP Project No. 3-19-0094-043
El Under Separate Cover Via
E l Plans
❑ Samples
the Following Items:
❑ Specifications
Copies
Date
No.
Description
1
Fully -Executed Contract for Above -Referenced Project
THESE ARE TRANSMITTED AS CHECKED BELOW:
❑ For Approval
O For Your Use
E l As Requested
❑ For Review and Comment
❑ For Bids Due
REMARKS:
20
El Approved as Submitted
❑ Approved as Noted
❑ Returned for Corrections
❑ Resubmit _ Copies for Approval
❑ Submit _ Copies for Distribution
❑ Return Corrected Prints
O Prints Returned After Loan to Us
COPY TO: Waterloo Regional Airport (w/enclosure) SIGNED:
DWS:blc City of Waterloo (transmittal only)
David Hughes (w/enclosure)
Douglas + . Schindel, P.E.
If enclosures are not as noted, kindly notify us at once.
501 Sycamore Street, Suite 222 P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 Fax: (319) 232-0271