Loading...
HomeMy WebLinkAboutEschliman Engineering-7/28/2014CITY OF WATERLOO Council Communication City Council Meeting: July 28, 2014 Prepared: July 23, 2014 Dept. Head Signature: Eric Thorson, PE., City Engineer # of Attachments: SUBJECT: CONSTRUCTION PLANS FOR SANITARY SEWER SERVING SUMMERLAND FARMS REPLAT LOT 1 and SEWAGE TREATMENT AGREEMENT DNR FORM 29 (Nov 00) for the DEPARTMENT OF NATURAL RESOURCES Submitted by: Dennis Gentz, P.E., Assistant City Engineer Recommended City Council Action: These construction plans have been reviewed by this office regarding construction and specification standards. Because they appear to meet acceptable standards, we recommended these construction plans be approved by the City Council. It is also recommended that the Mayor be authorized to sign the attached Treatment Agreement DNR Form 29 (Nov 00) with the Department of Natural Resources, and that the final acceptance of the attached construction plans be subject to the review and acceptance by the DNR. Summary Statement Transmitted herewith are the sanitary sewer construction plans serving SUMMERLAND FARMS REPLAT LOT 1, Waterloo, Iowa, as submitted by Kess & Associates, Inc., of Waterloo, Iowa. Expenditure Required N/A Source of Funds N/A Policy Issue N/A Alternative None Background Information: Iowa Department of Natural Resources Wastewater Section Construction Permit Application SEWAGE TREATMENT AGREEMENT INSTRUCTIONS This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e., a private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the project. This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities. However, the Department of Natural Resources must be informed in writing that the contractual agreement does exist. APPLICANT ENGINEER OWNER Iowa Development Enterprises, L.L.C. FIRM Eschliman Engineering, Inc. ADDRESS 2909 Mills Lane, Waterloo, Iowa 50702 ADDRESS 1132 Country Club Drive, Boone, Iowa 50036 REPRESENTATIVE Jason Guthrie TELEPHONE 319-961-0389 PROJECT OFFICER Dale R. Eschliman, P.E. & L.S. TELEPHONE 515-432-7323 PROJECT IDENTIFICATION Summerland Farms Replat Lot 1 OWNER AND SYSTEM RECEIVING WASTES City of Waterloo, Iowa: Waterloo W. P. C. F., Iowa No. 079001, Federal No. 0042650 CERTIFICATE I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the treatment system identified above. SIGNATURE : b� TITLE Owner: DATE 7— ?3 -,71/' Jason Guthrie:j9. — AGREEMENT TO PROVIDE SEWAGE TREATMENT I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary sewerage facilities identified above is approved by the owner, and that the owner accepts responsibility for providing adequate treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B, Code of Iowa, and the rules of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances, sewer service agreements, or fee systems entered into between the parties. SIGNATURE TYPED OR PRINTED NAME Mayor "Buck" Clark TITLE Honorable Mayor: City of Waterloo, Iowa PHONE NUMBER 319-291-4301 DATE 7`0/ DNR form 29 (Nov 00) 542-3219 IOWA DEPARTMENT OF NATURAL RESOURCES Wastewater Disposal System Construction Permit Application Fee Form CASHIER'S USE ONLY 0945-542-N P D E -C P-0570 32-3202 Owner Owner Name: Iowa Development Enterprises, L.L.C. Address: 2909 Mills Lane City, State, Zip: Waterloo, Iowa 50702 Project Identification: Summerland Farms Replat Lot 1 $100 Fee enclosed Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources". Place it and the check or money order on top of other Construction Permit Application documents. Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by Iowa Code 4556.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by Iowa Code 4556.197 and Iowa Administrative Code 567 IAC 64.16(3)"c". The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans precedes submittal of technical documents necessary to constitute a construction permit application. The application fee is not necessary when submitting a planning document but must accompany construction permit application documents. A fee should accompany each permit application received on or after July 1, 2006. Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions regarding the application fee, please contact Donna Gomm at 515-281- 502 or Donna.Gomm@dnr.iowa.gov Signature of Owner or Representative: Printed Name: / Telephone or email contact: 3 lei • 91 l - C7359 2 cc 1 ► CS .0w. c s i . co IAA / A -Cion-, oT1-izLE< IoA.1)6U6LoPA.tE,vr--1\7"C''Ew172►scs.1LG Mail to: Iowa Department of Natural Resources Wastewater Engineering Section 502 East 9th Street Des Moines, IA 50319-0034 06/2011 cmz DNR Form 542-1245 DATE PREPARED July 18, 2014 DATE REVISED Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE B, Collection system PROJECT IDENTITY Summerland Farms Replat Lot 1 DNR USE PROJECT NO. PERMIT NO. 1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the system. If no portion is subject to flooding, state none. Segment Flooding Protection Not Subject to Flooding *2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and 3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data. Location Design capacity, MGD Peak Hourly Dry weather Flow MGD (actual) Peak Hourly Wet Weather Flow MGD (actual) Segment Segment Segment Summerland SE 1/4, Sec. 13 T88N, R 13W 1.3 60+ 48,000 peak day 0.3 0.8 *3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data. Facility name and number Waterloo W.P.C.F. I wL A(®• 079 ONFee/el-a/ itia. WOK() #BODS/day Facility Loading Design Average Wet Weather (actual) Peak Hourly Wet Weather (actual) MGD 34.8 88,000 24.53 31,500 avg. day 60+ 48,000 peak day Provide projected design loading increase, which will be added to this facility as a result of this project. Design Loading Initial Design Year ( Residential service area Acres Acres Population 0.0 Persons 36.0 Persons Flow (100 GPCD) 0.0 GPD 3,600.0 GPD BOD5 (0.17 #/d/cap) 0.0 #/day 612.0 #/day Industrial service area N.A. Acres N.A. Acres Rated flow N.A. GPD N.A. GPD BOD5 N.A #/day N.A. #/day Other Not Applicable N.A. Acres N.A. Acres Rated Flow N.A. GPD N.A. GPD BOD5 N.A. #/day N.A. #/day Total BOD5 0.0 #/day 612.0 #/day Total Flow 0.0 GPD 3,600.0 GPD Peak Hourly Flow 0.0 GPD 9,000.0 GPD Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded. DNR form 28B (Nov 00) 542-3095 DATE PREPARED July 18, 2014 DATE REVISED Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE C, Lateral Sewer Extension PROJECT IDENTITY Summerland Farms Replat Lot 1 Part of SE 1/4, Section 13, T88N, R13W City of Waterloo, Black Hawk County, State of Iowa. DNR USE PROJECT NO. PERMIT NO. 1. Design Basis Initial Design Year (2014 ) Residential service area Zero (0.0) Acres 1.229 Acres Population Zero (0.0) Persons 36.0 Persons Flow (100 GPCD) Zero (0.0) GPD 3,600.0 GPD BOD5 (0.17 #/d/cap) Zero (0.0) #/day 612.0 #/day Industrial service area N.A. Acres N.A. Acres Rated Flow N.A. GPD N.A. GPD BOD5 N.A. #/day N.A. #/day Other N.A. Acres N.A. Acres Rated Flow N.A. GPD N.A. GPD BOD5 N.A. #/day N.A. #/day Total BOD5 Zero (0.0) #/day 612.0 #/day Total Flow Zero (0.0) GPD 3,600.0 GPD Peak Hourly Flow Zero (0.0) GPD 9,000.0 GPD 2. Pipe Diameter 8 Inch 10 Inch 12 Inch Material ASTM D2680 _ Not This Project Not This Project Joint ASTM D3212 Minimum Slope 0.40 % % % Maximum Manhole Space 229.4 ft. ft. ft. Total Sewer Length 229.4 ft.. ft. _ ft. Maximum Cover 9.9 ft. ft. ft. Minimum Cover 8.3 ft. ft. ft. 3. Construction specifications (indicate ASTM No. or other standard included in the specifications). A brief description is required in each part. A. Bedding class ASTM Class II, D231 & ASTM C2680 B. Pipe laying ASTM Class II, D231 & ASTM C2680 C. Compaction 90% Standard Proctor Density, with Final at 95% Standard Proctor Density D. Manhole Standard 48 Inch: ASTM C478 & SUDAS Figure 6010.301 E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI F. Infiltration/exfiltration test procedures Air Test & Televising G. Alignment & grade test procedures (1) During construction: Stake & batter board Laser Yes with Offset Control (2) After construction: Lamping Other Televising H. Deflection test procedures N.A. 4. Are detailed manhole drawings included: Yes ❑ No Typical frame and cover assembly Waterloo Specifications: Neenah R-1642 or Deeter 1247 (or approved equal) Are manhole covers nonvented: Yes // No ❑ Manhole diameter 48 in. Manhole opening diameter 24 in. Material Structure: P.C. Concrete (reinforced) with Ring & Lid 5. Minimum sewer & water main separation: Horizontal Ten (10.0) ft. Vertical Eighteen (18) in. Are specifications included? No 6. Stream, road, or railroad crossing protection Not required for this Project Are specifications included? N.A. DNR form 28C (Nov 00) 542-3096