Loading...
HomeMy WebLinkAboutMidAmerican Energy Company-8/11/2014IN CITY OF WATERLOO, IOWA �1' 1�'\�`, WATERLOO ENGINEERING DEPARTMENT OPV/Se �G 715 Mulberry Street • Waterloo, IA 50703 • (319) 291-4312 Fax (319) 291-4262 ..,. ,..... City Engineer • email: city.engineer@waterloo-ia.org c3°11erio CITY OF WATERLOO Council Communication City Council Meeting: August 11, 2014 Prepared: August 4, 2014 Dept. Head Signature: Eric Thorson, PE., City Engineer # of Attachments: ______ SUBJECT: ARC FLASH AGREEMENT WITH MIDAMERICAN ENERGY. Submitted by: Jamie Knutson, PE, Associate Engineer Recommended City Council Action: Staff has reviewed this agreement and recommends Council approve this document and authorizes Mayor to sign and enter into said agreement. Summary Statement Transmitted herewith is the arc flash agreement with MidAmerican Energy, for the release of information on the electrical system to serve the new Blowers Creek storm water lift station. Expenditure Required NA Source of Funds NA Policy Issue NA Alternative NA Background Information: The new storm water lift station on Blowers Creek is under construction. As part of the project, the electrical contractor is required to conduct an arc flash study. This study will use information from MidAmerican Energy to develop a plan that describes how the City's maintenance people need to de -energize the system to work on any electrical components, what protective gear must be worn when working on and around the equipment and develop the appropriate warning labels to be placed on all of the electrical equipment. This study is funded through the project and was included in the bid. CITY WEBSITE: www.cityofwaterlooiowa.com WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer erican MERCY OBSESSIVELY, SELENTLEssLYQ VOW3 SStVWCEN Please return this copy to: City perk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 Arc Flash Information and Indemnification Agreement This Arc Flash Information and Indemnification Agreement ("Agreement") is made and entered into on July 30, 2014 , by and between the City of Waterloo ("Customer") and MidAmerican Energy Company ("MidAmerican") at Blowers Creek Storm Water Lift Station, 3260 Lafayette St, Waterloo, IA. Customer and MidAmerican agree as follows: 1. Customer is requesting technical circuit and system information ("Information") from MidAmerican including, but not limited to, transformer minimum and maximum secondary fault currents, impedances and X/R ratios related to the provision of electric service to Customer. 2. It is possible the Information will be used by Customer, Customer's consultant, or other agents or representatives of Customer to model or study potential arc flash values within the Customer's commercial or industrial facility so as to estimate arc flash labeling and personal protection equipment ("PPE") levels in connection with work to be performed on the Customer's customer -owned energized electrical equipment. 3. Except as provided for in Section 8 below, Customer acknowledges and understands that MidAmerican expressly disavows any responsibility for the results of, or reliance upon, the results of any such model or study conducted by, or on behalf of, Customer. Customer acknowledges and agrees that the use of the Information for any purpose is at Customer's sole risk and discretion. 4. In response to the Customer's request for Information, MidAmerican is agreeable to providing the Information subject to the acknowledgments, understandings, and indemnification commitments and agreements provided for in this Agreement. 5. MidAmerican represents that, to its knowledge, the Information is true and correct for the facilities that provide electric service to the Customer at the Customer's location as of the date and time the Information is provided. However, Customer acknowledges that the Information is subject to change and may be rendered inaccurate due to factors such as, but not limited to, changes in distribution or substation transformer sizes, distribution or transmission circuit switching, and transmission and/or distribution circuit re-conductoring or rebuilds. Customer acknowledges that such changes are routine and numerous and that it is impractical to provide notice to Customer of such changes. If any such changes were to occur, any models or studies based upon the Information, in whole or in part, could be rendered incorrect due to these changes. 6. MidAmerican recommends that the Customer's customer -owned equipment always be de -energized and grounded whenever personnel are required to work on or around the Customer's customer -owned equipment. 7. To help ensure safety, MidAmerican recommends that Customer consider the industry and governmental standards concerning the upper and lower transformer impedance ranges and employee safety. 8. INDEMNIFICATION. In consideration of MidAmerican providing the Information to Customer, Customer hereby agrees to indemnify, protect and hold harmless MidAmerican, its employees, agents, officers, directors, and representatives from any and all claims, causes of action, demands, losses, damages, or liability, including personal injury, death, and property damage of any nature to any person or entity arising from, or the use of, the Information by Customer or by anyone on behalf of or to the benefit of Customer, except as to the gross negligence of MidAmerican. 9. Customer certifies that the individual signing this Agreement on its behalf is authorized to, and does in fact, bind the Customer to the terms of this Agreement. In Witness Whereof, the City of Waterloo and MidAmerican Energy Company have executed this Arc Flash Information and Indemnification Agreement by their duly authorized representatives as of the date first above written. Printed: Ei5f 6. ej4, Ir lc__ Title: MIDAMERICAN ENERGY COMPANY By: Printed: Title: 2 Revised 8/20/13