Loading...
HomeMy WebLinkAboutAecom Technical Services-9/15/2014CITY OF WATERLOO Council Communication City Council Meeting: September 15, 2014 Prepared: September 9, 2014 Dept. Head Signature: Eric Thorson, PE., City Engineer # of Attachments: SUBJECT: PROFESSIONAL SERVICES AGREEMENT CONSTRUCTION RELATED SERVICES FOR THE F.Y. 2014 FLOOD CONTROL GATEWELL REPAIRS CITY CONTRACT NO. 867 Submitted by: Jamie Knutson, P.E., Associate Engineer Recommended City Council Action: Staff has reviewed this agreement and recommends Council approve this document and authorizes Mayor to sign and enter into said agreement. Summary Statement Transmitted herewith is the Professional Services Agreement with AECOM for the construction related services for the F.Y. 2014 FLOOD CONTROL GATEWELL REPAIRS, Contract No. 867. This agreement is available in the City Clerk's office if you wish to review it in its entirety. Expenditure Required The cost for the CRS services is sixty-nine thousand dollars ($69,000.00), and shall not be exceeded without authorization of the City. Source of Funds G.O. Bond Funds Policy Issue N/A Alternative N/A Background Information The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide construction staking, field review, materials testing and contract administration during the construction phase for the above-mentioned project. Letter of Transmittal TO: City of Waterloo 715 Mulberry Street Waterloo, Iowa 50703 WE ARE SENDING YOU: El Attached ❑ Shop Drawings ❑ Copy of Letter ❑ Prints ❑ Change Order A=COM DATE: September 10, 2014 JOB ID NO....„—- _^-- ATTENTION: Mr. Jamie Knutson, P.E. i ` RE: Gatewell Repair Project ..r Black Hawk Creek and Cedar Riv Et ' Construction -Related Services , . SY GO��ER rvv°1V,.��0 i ❑ Under separate cover via ❑ Plans ❑ Samples the followin ' eum. El Specifications COPIES DATE NO. DESCRIPTION 3 Supplemental Agreement No. 1 for Above -Referenced Project THESE ARE TRANSMITTED AS CHECKED BELOW: O For approval ❑ For your use E l As requested ❑ Approved as submitted ❑ Resubmit copies for approval O Approved as noted 0 Submit copies for distribution O Returned for corrections ❑ Return corrected prints ❑ For review and comment 0 O For Bids due 20 El Prints returned after loan to us REMARKS: Hi Jamie. Please sign and return one (1) executed agreement for our files. We look forward to continuing to work with the City of Waterloo on this project. Thanks! COPY TO SIGNED: Douglas If enclosures are not as noted, kindly notify us at once. Schindel, P.E. 501 Sycamore Street, Suite 222 • P.O. Box 1497 • Waterloo, Iowa 50704-1497 • (319) 232-6531 • Fax: (319) 232-0271 A=COM Please return this copy to: City Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO GATEWELL REPAIR PROJECT BLACK HAWK CREEK AND CEDAR RIVER CONSTRUCTION -RELATED SERVICES SUPPLEMENTAL AGREEMENT NO. 1 WHEREAS, a Professional Services Agreement was entered into between the City of Waterloo, Iowa (Client), and AECOM Technical Services, Inc. (ATS) of Waterloo, Iowa, dated December 9, 2013, for the design survey and final design for the Gatewell Repair Project in Waterloo, Iowa; and WHEREAS, the Client and ATS now desire to enter into Supplemental Agreement No. 1 for construction -related services for the Gatewell Repair Project. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as follows: Project Description The project consists of the removal and replacement of twenty-one (21) gate valves, which outlet into Black Hawk Creek and the Cedar River. The project includes removal and replacement of existing gatewell equipment and operators, storm sewer connections, traffic control and other incidental items for the Gatewell Repair Project. II. Scope of Services The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide construction staking, field review, materials testing and contract administration during the construction phase for the project defined above. The Scope of Services is further defined as follows: Task 1. Conduct a preconstruction conference attended by representatives of the Contractor, Client, Consultant and affected utilities. Task 2. Provide construction -staking for horizontal and vertical controls for the project as follows: a. Set Stakes for Horizontal and Vertical Location of Structures, as Needed b. Field Verification of Structure Elevations, as Needed Task 3. Review shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. Task 4. Answer design interpretation questions from the Client, Contractor, review staff and appropriate agencies. Task 5. Prepare bi-weekly applications for payment based on information provided by field review staff and Contractor and forward to the Client for execution with recommendation for approval and payment. A=COM Page 2 Task 6. Perform construction site visits by design personnel at appropriate stages of construction to review the quality of the work and to determine whether the work conforms to the contract documents. Task 7. Prepare and assist the Client and Contractor in processing contract change orders. Task 8. Provide periodic field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Staffing requirements may be adjusted during the project in relation to the level of construction activity. Task 9. Report to the Client any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advise the Client of any work that should be corrected or rejected. Task 10. Consider and evaluate Contractor's suggestions for modifications and report them with recommendations to the Client. Task 11. Participate in a review of the project with the Client and review staff near project completion and prepare a list of items to be completed or corrected. Task 12. Participate in a field observation of the completed project with the Client and review staff before a final application for payment is processed for the Contractor. Task 13. Maintain files for correspondence, reports of the job conferences, shop drawings and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other project -related documents. Task 14. Provide the Client with a copy of revised drawings of the construction plans (record drawings) for the project based on the construction observation records of the field review staff and the Contractor showing those changes made during construction considered significant. Task 15. Prepare and assist the Client with the final close-out documentation received from the Contractor. III. Compensation Compensation for the above services will be on an hourly basis in accordance with Part VI of the original agreement. Total compensation is an estimated fee of Sixty -Nine Thousand Dollars ($69,000.00). IV. In all other respects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated December 9, 2013. IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 1 as of the dates shown below: A=COM CITY OF WATERLOO, IOWA B ATTEST: By: Ernest G. Clark Mayor AECOM TE NICAL SERVICES, INC. Date 9//5/til- Page 3 By �/� �✓ % �% Date September 9, 2014 ouglas . Sc' ' del, P.E. Associate Vice President L:\work\ADMIN\AGREE\SUPPLE\SA1 WatGatewelICRS.doc