Loading...
HomeMy WebLinkAboutAspro, Inc-9/15/2014CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2014 STREET RECONSTRUCTION PROGRAM, CONTRACT NO. 859 Date Prepared: September 15, 2014 AMOUNT: $ 5,049.00 INCREASE TO: ASPRO, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated April 21, 2014 A. Description of change to be made or extra work to be done: 1001 Construct Type SW -509 Inlet at E. San Marnan Drive and Sovia Street B. Reason for ordering change or extra work: 1001 Due to the intersection improvements at the intersection by the developer, the storm sewer structures were revised requiring the construction of an inlet not included in the plans. Settlement for cost of work to be made as follows: 1001. Type SW -509 Inlet ASPRO, INC. CONTRACTO BY: TOTAL INCREASE TITLE: //E:5//) F,v-- 9/7/tY Date APPROVED: Adopp 912 Z City Engi Date 1 Each @ $5,049.00 Each = $ 5,049.00 _ $ 5,049.00