Loading...
HomeMy WebLinkAboutAment Design-9/22/2014CITY OF WATERLOO Council Communication City Council Meeting: September 22, 2014 Prepared: September 17, 2014 Dept. Head Signature: Eric Thorson, PE., City Engineer # of Attachments: SUBJECT: PROFESSIONAL SERVICE AGREEMENT VIRDEN CREEK TRIBUTARY DRAINAGE IMPROVEMENTS CITY CON'1'KACT NO. 840 Submitted by: Jamie Knutson, P.E., Associate Engineer Recommended City Council Action: Staff has reviewed this agreement and recommends Council approve this document and authorizes Mayor to sign and enter into said agreement. Summary Statement Transmitted herewith is the Professional Services Agreement with Ament, for professional services in connection with the Virden Creek Tributary Drainage Improvements, Contract No. 840. It is to do wetland delineation, take soil borings, slope stability analysis and administration for the final design of the Virden Creek drainage way. Without this information, we will not be able to complete the design. This agreement is available in the City Clerk's office if you wish to review it in its entirety. Expenditure Required The cost for the services is twenty-four thousand seven hundred dollars ($24,700.00), and shall not be exceeded without authorization of the City. Source of Funds G.O. Bonds Policy Issue N/A Alternative N/A Background Information DESIGN Archiieciure• Engineering • Sur AMENT DESIGN 625 32nd Ave SW Cedar Rapids, Iowa 52404 (319) 378-1401 - TEL (319) 378-1975 - FAX To: Waterloo Engineering Department 715 Mulberry Street Waterloo, IA 50703 LETTER OF TRANSMITTAL DATE September 16, 2014 JOB NO. G0004.12200 ATTENTION Mr. Jamie Knutson RE Virden Creek Tributary Drainage Improvements Waterloo, Iowa City Project Number: 840 09-16-2014 2 pages WE ARE SENDING YOU ® Attached 0 Under separate cover via _ the following items: ❑ Shop drawings ❑ Copy of letter O Prints 0 Change order0 ❑ Plans 0 Samples 0 Specifications COPIES DATE NO. DESCRIPTION 2 09-16-2014 2 pages Partially -Executed Project Work Order 3 (#14-01) — Signed and Dated by Ament Design THESE ARE TRANSMITTED AS CHECKED BELOW: ® For approval 0 Approved as submitted ® For your use 0 Approved as noted ® As requested ❑ Retumed for corrections ❑ For review and comment 0 ❑ For Bids Due REMARKS ❑ Resubmit copies for approval ❑ Submit copies for distribufion ❑ Return corrected prints O PRINTS RETURNED AFTER LOAN TO US COPY TO: None SIGNED: Larry D. Bems, P. If enclosures are not as noted, kindly notify us at once. h:\company\projects\g00412.20 virden creek\word\g0004.12200se160.doc Architecture • Engineering • Surveying City of Waterloo Attn: Jamie Knutson 715 Mulberry Street Waterloo, IA 50703 WORK ORDER #14-01 Date: September 16, 2014 Base Agreement Date: September 10, 2012 Ament Design Project Number: G0004.12200 City of Waterloo Project Number: 840 Re: Virden Creek Tributary Drainage Improvements — Geotechnical, Wetland Delineation, Survey and Design, and Bid Services A. Previous Contract Amount = $110,300.00 B. Work Order Amount ($21,700 Not -to -Exceed Amount + $3,000 Lump Sum Amount) = $24,700.00 C. New Contract Maximum Amount: (A + B) = $135,000.00 Scope of Work Order: Geotechnical Services (Not -to -Exceed Amount) $17,250 • The additional services required for obtaining soil borings and performing geotechnical analysis to be performed by Terracon as a subconsultant outside of the original scope of services include: o Drilling and sampling for soil borings including rock and groundwater conditions o Geotechnical analysis (including slope stability analysis) o Geotechnical engineering report Wetland Delineation Services (Not -to -Exceed Amount) $4,450 • The additional services required for wetland delineation to be performed by Terracon as a subconsultant outside of the original scope of services include: o Site data review, field assessment, and wetland identification o GPS survey of identified wetland o WUS delineation report o Follow-up site visit to confirm vegetation (If requested by USACE) Survey and Design Services to Assist Geotechnical and Wetland Delineation Studies $3,000 • The additional services required for geotechnical services and wetland delineation services to be performed by Ament Design include: o Project coordination with subconsultant o Field location of proposed soil boring sites including determining existing ground elevations at these sites o Field location of easterly study limits for wetland delineate study o Field location of wetland boundary, if subconsultant is unable to do so because of tree cover in the area o Incorporation of soil boring locations into plans o Incorporation of identified wetland area boundary into plans o Meeting with Owner to review study findings and possible Project impacts H:\Company\Projects\G00412.20 Virden Creek\Word\Virden Creek Tributary Drainage Way - Work Order 3 (Rev 1).doc Virden Creek Tributary Drainage Improvements Work Order # 14-01 - Geotechnical, Wetland Delineation, Survey and Design Services, and Bid Services Date: September 16, 2014 (NOTE: This work order does not include any design revisions to platting documents or contract documents that may be necessary as a result of the findings of the geotechnical and wetland delineation studies or that may be necessary so as to minimize impacts to any identified wetland areas. These additional design services will be determined once the additional studies have been performed and the impacts of the study findings have been assessed.) Schedule: Unless we are delayed by events beyond our control, Ament Design and its subconsultants intend to complete the aforementioned scope of services within seven (7) weeks from the receipt of Notice to Proceed. Fee: Not -to -Exceed Amount (Terracon) — LumD Sum Fee Amount (Ament) — Total Not -to -Exceed Amount — Ap ed by: City of Waterloo $21,700.00 $3,000.00 $24,700.00 Submitted by: ZZ Li - Date Ame6 Design Date The Base Agreement signed between Ament Design and the City of Waterloo is referenced by this statement, and shall be considered part of this work order. H:\Company\Projects\G00412.20 Virden Creek\Word\Virden Creek Tributary Drainage Way - Work Order 3 (Rev 1).doc