HomeMy WebLinkAboutAecom Technical Services-9/22/2014 (2)CITY OF WATERLOO Council Communication City Council Meeting: September 22, 2014 Prepared: September 16, 2014 Dept. Head Signature: Eric Thorson, City Engineer # of Attachments: SUBJECT: FY 2015 4Th STREET CANOPY BRIDGE PAINTING AND REPAIRS SUPPLEMENTAL AGREEMENT NO. 3 WITH AECOM TECHNICAL SERVICES, INC. CONTRACT NO. 875 Submitted by: Jeff Bales, Associate Engineer Recommended City Council Action: It is recommended that the Council approve this Supplemental Agreement No. 3 with AECOM Technical Services, Inc. and authorize the Mayor to sign and enter into said agreement. Summary Statement: This agreement is for professional services to complete final design and construction plan preparation for the painting and structural repairs of the 4th Street Bridge Walkway Canopy over the Cedar River. Compensation for the services will be on an hourly basis with actual costs for a maximum estimated amount of $36,200. This agreement has been reviewed by staff and it is recommended for approval by the City Council. This agreement is available in the City Clerk's office if you wish to review it in its entirety. Expenditure Required $36,200 Source of Funds General Obligation Bonds - $36,200 Policy Issue N/A Alternative N/A Background Information: N/A A=COM AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com CITY OF WATERLOO 4TH STREET BRIDGE AND WALL REPAIRS 4T" STREET CANOPY BRIDGE PAINTING AND REPAIRS SUPPLEMENTAL AGREEMENT NO. 3 WHEREAS, a Professional Service Agreement was entered into by City of Waterloo (Client), and AECOM Technical Services, Inc. (ATS), of Waterloo, Iowa, dated January 28, 2013, for slope protection repairs at the west end of the Fourth Street Bridge, in addition to riverwall repairs for approximately 95 feet of length below the west end of the bridge; and WHERAS, the Client and ATS entered into Supplemental Agreement No. 1, dated August 13, 2013, to investigate the rehabilitation of the 4th Street Walkway Canopy Bridge over the Cedar River and prepare a conceptual design report; and WHEREAS, the Client and ATS entered into Supplemental Agreement No. 2, dated November 5, 2013, to provide engineering services during the construction phase of the 4th Street Bridge and Wall Repair project; and WHEREAS, the Client and ATS desire to enter into Supplemental Agreement No. 3 to provide engineering services to complete final design and construction plan preparation for the painting and structural repairs of the 4th Street Canopy Bridge over the Cedar River. NOW THEREFORE, it is mutually agreed to amend the original Professional Service Agreement as follows: I. PROJECT DESCRIPTION The project consists of the painting and structural repairs of the 4th Street Canopy Bridge over the Cedar River. II. SCOPE OF SERVICES The Scope of Services will encompass and include services, materials, equipment, personnel and supplies necessary to provide final design, construction document preparation and project administration for the project defined above. The Scope of Services is further defined as follows: Detailed Field Investigation and Data Collection (Tasks 1-3) The following identifies tasks leading to the compilation of all needed existing conditions required to design the repairs to the el Street Canopy Bridge: Task 1 — Detailed Field Investigation Task 2 — Initial Quantity Development from Field Review (Frame Members, Concrete Walls, Concrete Deck) Task 3 — Base Mapping and Plan Sheet Development Final Construction Plans and Specifications (Tasks 4-17) These tasks include developing final construction plans and specifications for the 4th Street Canopy Bridge Project. Included in these tasks will be the typical sections and details, tabulations and quantities, final plan sheets, detail sheets, traffic control details, quality control A=COM Page 2 review, construction cost estimate and technical specifications. The following specific tasks lead to the completion of the final construction plans and specifications: Task 4 - Title and Legend Sheets Task 5 - Typical Sections and Details Task 6 - Bid Items and General Notes a. Bid Item and Quantity Listing b. Estimate Reference Information c. General Notes Task 7 - Tabulations and Quantities Task 8 - Plan Sheets Task 9 — Detail Sheets Task 10 - Traffic Control Sheets Task 11 — Coordination with Iowa DNR Task 12 - Quality Control Review Task 13 - Final Revisions Task 14 - Construction Cost Estimate Task 15 - Specifications Task 16 - Printing and Submittals Task 17 - Field Review Project Administration, Coordination and Meetings (Tasks 18-20) These tasks include project administration, coordination and meetings throughout the project development. These tasks also include pre -letting activities and general project administration. The following identifies tasks leading to the completion of project administration, meetings and coordination during the design phase of the project. Task 18 - Project Meetings Task 19 - Pre -Letting Activities Task 20 - Project Administration Schedule The construction plan and project specifications preparation will be completed by January 15, 2015, in anticipation of an early February letting date (pending project funding). Phase III - Construction -Related Services The scope of construction -related services will be determined at the time the services are needed and defined under a future amendment. Construction -related services include construction staking, on-site field review, materials testing, contract administration during construction and right-of-way staking. III. COMPENSATION Compensation for the Services shall be on an hourly basis in accordance with the hourly fees and other direct expenses in effect at the time the services are performed. Total compensation is an estimated fee of Thirty -Six Thousand Two Hundred Dollars ($36,200.00) and shall be segregated from the fees estimated for Part VI of the original agreement, and Supplemental Agreement Nos. 1 and 2. IV. In all other aspects, the obligations of the Client and ATS shall remain as specified in the Professional Services Agreement dated January 28, 2013, and subsequent amendments. AZCOM Page 3 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 3 as of the dates shown below: AECOM TECHNICAL SERVICES INC. By (�Vr - l/n �/, ' Date September 16, 2014 Douglas 'chin . -I, P.E. Associate Vi - resident CITY OF WATERLOO, IOWA By �� Date , Q �2, 2D l rnest G. Clark Mayor L:\work\ADMIN\AGREE\SUPPLE\SA3 Wat 4thStrCanopyBridgeRepairs.doc