HomeMy WebLinkAboutJDE Engineering, PLC-10/6/2014CITY OF WATERLOO
Council Communication
City Council Meeting: October 6, 2014
Prepared: October 1, 2014
Dept. Head Signature: Eric Thorson, PE., City Engineer
# of Attachments:
SUBJECT: F.Y. 2015 GERALDINE ROAD - PHASE III
CITY CONTRACT NO. 871
South Port Third Addition - Sanitary Sewer Plans
Sewage Treatment Agreement For The
Iowa Department of Natural Resources
Submitted by: Jeff Bales, Associate Engineer
Recommended City Council Action:
Staff has reviewed these plans and construction permit application agreement with Iowa DNR and
recommends Council approve these documents and authorizes Mayor to sign and enter into said
agreement.
Summary Statement
Transmitted herewith is the sanitary sewer plans that will serve South Port Third Addition and the
construction permit application agreement with Iowa DNR in conjunction with the RISE -funded road
project - Geraldine Road (Phase III) as prepared by JDE Engineering.
The plans and agreement are available in the City Clerk's office if you wish to review it in its entirety.
Expenditure Required N/A
Source of Funds N/A
Policy Issue N/A
Alternative N/A
Background Information
The roadway project has been awarded RISE Funding by the DOT Commission and includes a
1394 -ft. extension of Geraldine Road to tie into Airline Highway.
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e., a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities.
However, the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT
ENGINEER
OWNER
Glenn Behrends
FIRM
JDE Engineering, PLC
ADDRESS
3261 W. Airline HWY., Waterloo, IA 50703
ADDRESS
402 E. 4th Street, Suite 101, Waterloo, IA 50703
REPRESENTATIVE
Glenn Behrends
TELEPHONE
319-233-5616
PROJECT OFFICER
Jim D. Ellis, PE
TELEPHONE
319-464-7913
PROJECT IDENTIFICATION
Geraldine Road Phase III Contract No. 871
OWNER AND SYSTEM RECEIVING WASTES
City of Waterloo waste water treatment facility
CERTIFICATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
SIGNATURE
a '1!.,
6 ,1,41,9
TITLE
DATE
AGREEMENT TO PROVIDE SEWAGE TREATMENT
I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary
sewerage facilities identified above is approved by the owner, and that the owner accepts responsibility for providing adequate
treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B, Code of Iowa, and the rules
of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances, sewer
service agreements, or fee systems entered into between the parties.
T E
Mayor
TYPED OR PRINTED NAME
Ernest G. Clark
PHONE NUMBER
319-291-4301/ &Al/
DATE 5//,
DNR form 29 (Nov 00)
542-3219
IOWA DEPARTMENT OF NATURAL RESOURCES
Wastewater Disposal System Construction Permit
Application Fee Form
CASHIER'S USE ONLY
0945-542-N PD E -CP -0570
32-3202
Owner
Owner Name: Glenn Behrends
Address: 3261 W. Airline Hwy.
City, State, Zip: Waterloo, IA 50703
Project Identification: Geraldine Road Phase III Contract No. 871
$100 Fee enclosed
Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources".
Place it and the check or money order on top of other Construction Permit Application documents.
Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by
Iowa Code 455B.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by
Iowa Code 4558.197 and Iowa Administrative Code 567 IAC 64.16(3)"c".
The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump
stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents
necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well
as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as
planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility
plans precedes submittal of technical documents necessary to constitute a construction permit application. The
application fee is not necessary when submitting a planning document but must accompany construction permit
application documents. A fee should accompany each permit application received on or after July 1, 2006.
Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions
regarding the application fee, please contact Donna Gomm at 515-281-8502 or Donna.Gomm@dnr.iowa.gov
Signature of Owner or Representative: 04tAA✓�
Printed Name:
Telephone or email contact: 5J Z 3 '— 5.4 ,14 G.L E I MM & @ fkx.. .
Mail to:
Iowa Department of Natural Resources
Wastewater Engineering Section
502 East 9th Street
Des Moines, IA 50319-0034
06/2011 cmz DNR Form 542-1245
Exhibit 11A
Iowa Department of Natural Resources Wastewater Engineering Section
Construction Permit Application
SCHEDULE A, General Information
DNR form 28A (Sept 2010)
542-3129
APPLICANT
ENCINEER
OWNER E-MAIL ADDRESS
Glenn Behrends glennb c�i ptnic.us
FIRM E-MAIL
JDE ENGINEERING, PLC jdeeng@lpctel.net
ADDRESS
ADDRESS
ADDRESS
3261 W. Airline Hwy, Waterloo, IA 50703
402 E. 4" Street, Suite 101, Waterloo, IA 50703
REPRESENTATIVE TELEPHONE
PROJECT OFFICER TELEPHONE
Glenn Behrends 319-232-5616
Jim D. Ellis, PE 319-464-7913
PROJECT IDENTIFICATION
ESTIMATED START DATE *
ESTIMATED COMPLETION DATE
Geraldine Road Phase III Contract No. 871
12/01/2015
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering
report, facilities plan or other information previously been submitted for this project? ❑ X
If Yes=>
PROJECT IDENTITY
DATE SUBMITTED
2. Does the project
and construction permit application, as submitted, follow the recommendations, design
loadings, construction schedule, permit limits, and conclusions of the approved engineering report or
facilities plan? X ❑ 9
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application? X ❑ l
For a minor gravity sewer extension within the meaning of 455B. 183.3 Code of Iowa and Design
Standard 11.1, two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved
standard specifications a part of this application?
X ❑
If Yes=>
APPROVED STANDARD SPECIFICATIONS OF
DATE APPROVED
(municipality or firm)
10/18/2011
SUDAS Standards
5. Does each
set of plans and specifications or engineering report accompanying this application contain a
"professional engineering seal" executed in conformance with 542B.16, Code of Iowa? X ❑
If No=> Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project? X ❑
If Yes=> A construction permit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction? X ❑
If No=> A Sewage Treatment Agreement (DNR Form 29) executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application? ❑ X
If Yes=> A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet; or any private or public well, lake, or public recreation area located
within 400 feet of the proposed construction? ❑ X
If Yes=> Identify and locate the facility(s) relative to the proposed construction.
10. Will construction
inspection be conducted by a licensed engineer employed by the applicant?
❑ X,
If No=>
NAME OF ENGINEERING FIRM CONDUCTdNG INSPECTION
JDE Engineering, PLC "
11. Will this project
utilize CWSRF loan funds?
❑ X
CERTIFICATION
APPLICANT
ENGINEER
I certify that I am the authorized representative of the owner and
I certify that all aspects of design included in this application
state that the project identified above is approved by the owner.
conform to applicable standards contained in Chapter 567 IAC
64, or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the "
q
information contained in this application, and to the best of my
r/. �� a f : `, ` _ " `i SiN
knowledge, such information is complete and accurate.
SIGNATURE DATE
SIGNATURE DATE
s ,.
VZ2114
* Estimated Construction Start Date: Complete applications m st be submitted at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
DNR form 28A (Sept 2010)
542-3129
Construction Permit Application
SCHEDULE A, General Information, page 2
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules attached to this application.
TITLE
Collection system
C Lateral Sewer Extension
D Trunk & Interceptor Sewer
E Wastewater Pump Station
F Treatment Project Site Selection
G Treatment Project Design Data
H1 Schematic Flow Diagram
H2 Treatment Process Loading and
Removal Efficiency
H3 Mechanical Plant Reliability
Screening, Grit Removal and Flow
Measurement
J Septic Tank System
K1 Controlled Discharge Pond
K2 Aerated Pond
K3 Anaerobic Lagoon
L Setting Tanks
M Fixed Film Reactor — Stationary Media
N Rotating Biological Contactor
O Aeration Tanks or Basins
P Gas Chlorination
Q Sludge Digestion and Holding
RI Sludge Dewatering and Disposal
R2(A & B) Low Rate Land Application of Sludge
R3 Land Application of Sewage Sludge
(To be developed)
S Land Application of Wastewater
(To be developed)
Sewage Treatment Agreement
INCLUDED IN SUBMITTAL
ATTACHED PROJECT DATE
X ❑
xxxx
X
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A (Sept 2010) 542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE 13, Collection system
DATE PREPARED PROJECT IDENTITY
09/12/2014 Gerladine Road Phase III Contract No. 871
DATE REVISED
DNR USE
PROJECT NO.
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding, state none.
Segment Flooding Protection
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Location
Design capacity, MGD
Peak Hourly Dry weather Flow
MGD (actual)
Peak Hourly Wet Weather Flow
MGD (actual)
Segment Segment
Segment
24"
1.152
0.143
0.356
*3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water
Polution Control Plant
Facility Loading
Design
Average Wet Weather (actual)
Peak Hourly Wet Weather (actual)
MGD
#BODS/day
34.8
88,000
24.53
31,500
60+
48,000+
Provide projected design loading increase, which will be added to this facility as a result of this project.
Design Loading
Residential service area
Population
Flow (100 GPCD)
BOD5 (0.17 #/d/cap)
Industrial service area
Rated flow
BOD5
Other
Rated Flow
BOD5
Total BOD5
Total Flow
Peak Hourly Flow
Initial
Design Year (
Acres Acres
N/A Persons N/A Persons
N/A GPD N/A GPD
N/A #/day N/A #/day
23 Acres 55 Acres
125,000 GPD 275,000 GPD
212.50 #/day 467.50 #/day
N/A Acres N/A Acres
N/A GPD N/A GPD
N/A #/day N/A #/day
212.50 #/day 467.50 #/day
125,000 GPD 275,000 GPD
475,000 GPD 1,045,000 GPD
Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
DNR form 28B (Nov 00) 542-3095
lowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C, Lateral Sewer Extension
DATE PREPARED PROJECT IDENTITY
09/12/2014 Geraldine Road Phase 111 Contract No. 871
DATE REVISED
Design Basis
Residential service area
Population
Flow (100 GPCD)
BOD5 (0.17 #/d/cap)
N/A
N/A
N/A
N/A
Initial
Acres
Persons
GPD
#/day
Industrial service area 25 Acres
Rated Flow 125,000 GPD
Design Year (2014 )
N/A
N/A
N/A
N/A
55
275,000
BOD5 212.50 #/day 467.50
Other N/A Acres N/A
Rated Flow N/A GPD N/A
BOD5 N/A #/day N/A
Total BOD5 212.50 #/day 467.50
Total Flow 125,000 GPD 275,000
Peak Hourly Flow 475,000 GPD
1,045,000
Acres
Persons
GPD
#/day
Acres
GPD
#/day
Acres
GPD
#/day
#/day
GPD
GPD
Pipe
Diameter 8 Inch 10 Inch 12 Inch
Material N/A N/A PVC TRUSS
Joint N/A N/A ELASTOMERIC
Minimum Slope N/A % N/A % 0.12 %
Maximum Manhole Space N/A ft. N/A ft. 390 ft.
Total Sewer Length N/A ft.. N/A ft. 1,750 ft.
Maximum Cover N/A ft. N/A ft. 13.00 ft.
Minimum Cover N/A ft. N/A ft. 03.00 ft.
Construction specifications (indicate ASTM No. or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class ATM Class II, D2321-75 except as modified by ASTM D2680-01
B. Pipe laying ASTM Class II, D2321-75 except as mofified by ASTM D2680-01
C. Compaction 95
5 Standard Proctor Density
D. Manhole ASTM C4782 48" dia.
E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures v -notch weir, televising, or air test
G. Alignment & grade test procedures
(1) During construction: Stake & batter board yes Laser yes
(2) After construction: Lamping yes Other televising
H. Deflection test procedures N/A
Are detailed manhole drawings included: Yes 0. No ❑
Typical frame and cover assembly
Are manhole covers nonvented: Yes
Manhole diameter 48"
-4
Manhole opening diameter 24
No ❑
in.
in. Material concrete
Minimum sewer & water main separation: Horizontal 10
Are specifications included? no
ft. Vertical 18 in.
Stream, road, or railroad crossing protection N/A
Are specifications included? N/A
DNR form 28C (Nov 00) 542-3096