Loading...
HomeMy WebLinkAboutRicklefs Excavating-10/20/2014CITY OF WATERLOO, IOWA WASTE MANAGEMENT SERVICES 3505 Easton Ave. Waterloo, IA 50702. (319) 291-4553 Fax (319) 291-4523 Council Communication City Council Meeting: 10/ /J,4 Prepared: 10/15/14 Dept. Head Signature: # of Attachments: 2 SUBJECT: LaPorte Road Pumping Station and Force Main, City Contract No. 847 Submitted by: Larry N. Smith, WMS Superintendent Recommended City Council Action: Attached for your consideration and approval is a copy of Change Order No. 2 for LaPorte Road Pumping Station and Force Main. Change Order No. 2 includes 7 additional changes : Seeding/fertilizing/mulching for hydraulic seeding, explosion proof electrical boxes, additional float, alarm equipment, additional conduit, water service, wood excelsior mat. Summary Statement: Expenditure Required: $28,984.90 Source of Funds : Policy Issue: Alternative: Background Information: This project includes the construction of a new lift station, approximately 1,880 L.F. of gravity main, approximately 2,960 L.F. of force main, one air release manhole, seven sanitary sewer manholes and incidentals located along LaPorte Road. Work also includes removal of the existing lift station, installation of a manhole once the new statin is operational, and grading and surface restoration. CITY WEB SITE: www.cityofwaterlooiowa.com WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer CHANGE ORDER NO. 2 Owner qty of Waterloo Date: September 29, 2014 Project LaPorte Road Pumping Station and Force Main Owner's Contract No. 847 Contractor Rlckiefs Excavating Date of Contact Start January 28, 2024 Contract Amount $ 352,134.00 You are directed to make the following changes in the Contract Documents. Description: 22 Seeding, Fertilizing and Mulching for Hydraulic Seeding (0.6 AC @ $2,690.00) 2-1 Explosion Proof Electrical Boxes 2-2 Aciffitional Float in Wet Weil 2-3 Alarm Equipment at Pump Station 2-4 Additional Conduit from lighting Panel to Meter Pit 2-5 Water Service for Pump Station 2-6 Wood Excelsior Mat TOTAL ADDITIONS $ 1,614.00 $ 1,100.00 $ 729.75 $ 6,150.90 $ 2,840.25 $ 3,900.00 $ 12,650.00 $ 28,984.90 Reason for Change Order 22 & 2-6 During SWPPP Inspections by City staff it was noted that there were some erosion Issues In the newly seeded areas of this project. In order to take care of these issues it was requested that the areas in question be re -graded, re -seeded, and covered with wood excelsior mat. The existing wattles will also need to be removed and replaced. This item covers the purchase and installation of the matting, the grading and seeding work, and the removal and reinstallation of the existing wattles. 2-1 During an initial electrical inspection, it was requested that three junction boxes be changed to explosion proof boxes due to their Class 1, Division 1 location. This item Is for the removal of the original boxes and the purchase and installation of the new boxes. 2-2 During pump testing the City WPCF staff requested that an additional float be added to the wet well to allow easier maintenance of the pumps. This item rovers the purchase, installation and wiring of this float 2-3 The City WPCF staff requested that the contractor provide and install the alarm equipment for the pump station instead of the City as shown In the contract documents. This item covers the purchase and Installation of this equipment_ 2-4 The City WPCF staff requested additional conduit be placed from the lighting panel to the wet well for future use. Thi< item covers the purchase and installation of this conduit. 2-5 An existing water service was found to be plumbed to the original pump station at E Orange Road. WPCF staff requested that this service be extended to the new pump station and a yard hydrant installed for use during maintenance. This item covers the purchase and Installation of this water service and hydrant. CONTRACT PRICE Original: Previous C.O.s {ADD/DEDUCT) This C.O. (ADD/DEDUCT) Contract Price with all approved Change Orders: $ 352,134.10 Original Completion Date: $ 26,229.86 $ 28,984.90 Revised Completion mate: $ 407,348.76 CONTRACTTIME To Substantial Completion To Final Completion 4/30/2014 10/8/2014 it Is agreed by the Contractor that this Change Order includes any and ail casts associated with or resulting from the change(s) ordered herein, indud'mg all impact delays, and accelerathm costs. Other than the doilaramotmt and time ailoerance listed above, there shall be no further time or dolor compensation ase result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND All PULAT1ONS AND CONVENANTS OF THE CONTRACT SHAII APPLY HERETO_ A 3- D I v4.1 .1.��. BY: Contractor (Authorized Signature) ACCEPTED: ryc BY: t AECOM Date /'5I /, y Date Date AECOM 603116671 2 Project No. C.O. No.