Council Communication
City Council Meeting: 10/ /J,4
Prepared: 10/15/14
Dept. Head Signature:
# of Attachments: 2
SUBJECT: LaPorte Road Pumping Station and Force Main, City Contract No. 847
Submitted by: Larry N. Smith, WMS Superintendent
Recommended City Council Action: Attached for your consideration and approval is a copy
of Change Order No. 2 for LaPorte Road Pumping Station and Force Main. Change Order
No. 2 includes 7 additional changes : Seeding/fertilizing/mulching for hydraulic seeding,
explosion proof electrical boxes, additional float, alarm equipment, additional conduit, water
service, wood excelsior mat.
Summary Statement:
Expenditure Required: $28,984.90
Source of Funds :
Policy Issue:
Alternative:
Background Information: This project includes the construction of a new lift station,
approximately 1,880 L.F. of gravity main, approximately 2,960 L.F. of force main, one air
release manhole, seven sanitary sewer manholes and incidentals located along LaPorte Road.
Work also includes removal of the existing lift station, installation of a manhole once the
new statin is operational, and grading and surface restoration.
CITY WEB SITE: www.cityofwaterlooiowa.com
WE'RE WORKING FOR YOU!
An Equal Opportunity/Affirmative Action Employer
CHANGE ORDER NO. 2
Owner qty of Waterloo Date: September 29, 2014
Project LaPorte Road Pumping Station and Force Main
Owner's Contract No. 847 Contractor Rlckiefs Excavating
Date of Contact Start January 28, 2024 Contract Amount $ 352,134.00
You are directed to make the following changes in the Contract Documents. Description:
22 Seeding, Fertilizing and Mulching for Hydraulic Seeding (0.6 AC @ $2,690.00)
2-1 Explosion Proof Electrical Boxes
2-2 Aciffitional Float in Wet Weil
2-3 Alarm Equipment at Pump Station
2-4 Additional Conduit from lighting Panel to Meter Pit
2-5 Water Service for Pump Station
2-6 Wood Excelsior Mat
TOTAL ADDITIONS
$ 1,614.00
$ 1,100.00
$ 729.75
$ 6,150.90
$ 2,840.25
$ 3,900.00
$ 12,650.00
$ 28,984.90
Reason for Change Order
22 & 2-6 During SWPPP Inspections by City staff it was noted that there were some erosion Issues In the newly seeded
areas of this project. In order to take care of these issues it was requested that the areas in question be
re -graded, re -seeded, and covered with wood excelsior mat. The existing wattles will also need to be
removed and replaced. This item covers the purchase and installation of the matting, the grading and seeding
work, and the removal and reinstallation of the existing wattles.
2-1 During an initial electrical inspection, it was requested that three junction boxes be changed to explosion proof boxes
due to their Class 1, Division 1 location. This item Is for the removal of the original boxes and the purchase and
installation of the new boxes.
2-2 During pump testing the City WPCF staff requested that an additional float be added to the wet well to allow easier
maintenance of the pumps. This item rovers the purchase, installation and wiring of this float
2-3 The City WPCF staff requested that the contractor provide and install the alarm equipment for the pump station instead
of the City as shown In the contract documents. This item covers the purchase and Installation of this equipment_
2-4 The City WPCF staff requested additional conduit be placed from the lighting panel to the wet well for future use. Thi<
item covers the purchase and installation of this conduit.
2-5 An existing water service was found to be plumbed to the original pump station at E Orange Road. WPCF staff requested
that this service be extended to the new pump station and a yard hydrant installed for use during maintenance. This item
covers the purchase and Installation of this water service and hydrant.
CONTRACT PRICE
Original:
Previous C.O.s {ADD/DEDUCT)
This C.O. (ADD/DEDUCT)
Contract Price with all approved
Change Orders:
$ 352,134.10 Original Completion Date:
$ 26,229.86
$ 28,984.90 Revised Completion mate:
$ 407,348.76
CONTRACTTIME
To Substantial
Completion
To Final
Completion
4/30/2014
10/8/2014
it Is agreed by the Contractor that this Change Order includes any and ail casts associated with or resulting from the change(s) ordered herein,
indud'mg all impact delays, and accelerathm costs. Other than the doilaramotmt and time ailoerance listed above, there shall be no further
time or dolor compensation ase result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND All
PULAT1ONS AND CONVENANTS OF THE CONTRACT SHAII APPLY HERETO_