HomeMy WebLinkAboutCedar Valley Corp, LLC.-10/20/2014Form 830240wd 04-08 com Iowa Department of Transportation Change Order rieabe return tills copy to: Qty Clerk & Finance Dept. 715 Mulberry St. Waterloo, IA 50703 Non -Substantial: No. Six (6) Substantial: Contract Accounting ID No.: 031521 County BLACK HAWK (07) Part . Jon - Part ❑ ❑ October Concurrence Date Project No: STP -U-8155(731)--70-07 Kind of Work: PCC PAVEMENT - GRADE/REPLACE Date Prepared: 10/14/2014 Contractor: CEDAR VALLEY CORP., LLC You are hereby authorized to make the following changes to the contract documents. A - Description of change to be made or extra work to be done: S=Substantial; NS=Non-Substantial; P=Participating; NP=Non-Participating 7007 0200 — Add 150 tons on Hot Mix Asphalt Mixture, Commercial Mix (Includes Asphalt Binder), As Per Plan (NS;P) 7008 0060 — Add 125 cubic yards of Modified Subbase (NS;P) 7009 0820 — Add 900 square yards of Removal of Pavement (NS;P) 8011 Add Additional Traffic Control for Winter Shutdown Pavement. (Lump Sum) (NS;P) B - Reason for change or extra work: 7007-7009, 8011 Because of delays to the construction progress as a result utility conflicts, work will not be complete on the pavement of Stage 2 (adjacent to Stage 1) and Stage 4 (adjacent to Stage 3A) and a temporary pavement will be constructed to bridge the 3 -foot gap between the pavements. The temporary pavement will be 3 -inches of HMA pavement on a 5 -inch modified subbase. Continued on reverse side) Approved District Construction Engineer /0.- a 3-/z/ Date Project Engineer Receipt is acknowledged of this change or extra work and terms of settlement Approved contingent upon funds being available under the existing project agreement or upon additional Federal -aid funds being made available by a modified project agreement. Date For the Division Administrator Federal Highway Administration are hereby agreed to. Cedar Va y Corp., LLC Date Contractor By `p- ---- /0-y/� / Ddte Approved Approved Mayor Clark Assistant Construction Engineer /6/2 7/64 Date Date DISTRIBUTION: Project Engineer— Forward original to District. District — Nonsubstantial — Forward original and one copy to the Office of Construction and two copies bade to the Project Engineer. - Substantial - Forward original and two copies to the Office of Construction. AIP C-1 —Settlement for cost of work to be made as follows: 7007, 7008, 7009 Contract Price 8011 Agreed Lump Sum Price Accounting ID No. 10 3 1 1 1 5 12 11 1 2 3 4 5 6 Change Order No. Six (6) C-2 — Justification for cost(s) 7007, 7008, 7009 Contract Price 8011 The cost is for traffic control during the pavement operation for the 3 -foot gap. The cost is considered appropriate because the gap will be paved under traffic and the traffic control will need to be maintained for a period of approximately one week. D - ITEMS INCLUDED IN CONTRACT If Credit Add "CR° Item Number Change No. Line Item Number Unit Price .xxx Quantity .xxx Amount .xx 7007 0200 Hot Mix Asphalt Mixture, Commercial Mix (Includes Asphalt Binder), As Per Plan 175.000 150.000 26,250.00 7008 0060 Modified Subbase 39.500 125.000 4,937.50 7009 0820 Removal of Pavement 7.700 900.00 6,930.00 7 7 TOTAL 38,117.50 E - ITEMS NOT INCLUDED IN CONTRACT If Credit, Add "CR" Change No. Item Description Item Number Function Code Unit Price .xxx Quantity .xxx Amount .xx 8012 Traffic Control for Winter Shutdown Pavement 2599-9999010 3,740.000 1.000 3,740.00 8 8 8 8 8 TOTAL 3,740.00