HomeMy WebLinkAboutK & W Electronics Inc.-10/20/2014CITY OF WATERLOO Council Communication City Council Meeting: October 20, 2014 Prepared: October 8, 2014 Dept. Head Signature: Sheila Combs # of Attachments: 1 (4 copies) SUBJECT: Approval of Change Order #5, in the amount of $5,250.00, for Rehabilitation of Airfield Vault project for Waterloo Regional Airport. Submitted by: Sheila Combs, Airport Bookkeeper Recommended City Council Action: Approval of Change Order #5 for Rehabilitation of Airfield Vault project. Summary Statement Expenditure Required: $5,250.00 Source of Funds: 90% ($4,725.00) FAA; 10% ($525.00) PFC Policy Issue Alternative Background Information: This change order provides for milling and replacement of HMA Pavement with extensive cracking where thermoplastic signs are required for the Rehabilitation of Airfield Vault project for Waterloo Regional Airport. There is also a time extension to allow curing of the new HMA pavement prior to the application of the thermoplastic material. This request has been reviewed and approved by FAA. CHANGE ORDER NQ. 5 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date September 17, 2014 Project Rehabilitate Airfield Vault Owner's Contract No. FAA AIP Project No. 3-19-0094-40 Contractor K&W Electric Inc. Date of Contract Start August 13, 2012 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 108 Repair HMA Pavement to Allow for Application of Thermoplastic Signs LS $5,250.00 1 $5,250.00 Change Order Subtotal $5,250.00 Total Amount of Change Order $5,250.00 Reason for Change Order: Item 108 — Three (3) locations on existing HMA Pavement where thermoplastic signs are required have extensive cracking and will not allow proper application of thermoplastic material. The pavement in these areas will be milled to a depth of 2 -inches below surface and replaced with new HMA material to allow the material to adhere to the pavement. The time extension related with this change order is to allow curing of the new HMA pavement prior to the application of the thermoplastic material. Rehabilitate Airfield Vault CO -5 Project No — 60275869' 1 CONTRACT PRICE Original: $ 865,905.00 Previous C.O.s (ADD): $ 29,736.75 This C.O. (ADD): $ 5,250.00 Contract Price with all approved Change Orders: $ 900,891.75 CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 270 0 45 315 Original Completion Date: 270 Revised Completion Date: 315 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. Engineer (Authorized Signature) APPRO J D: By: Owner (Authorized Signature) ACCEPTED: By: Contractor (Authorized Signature) Date /b/ZO/r� Date 1/23//y Date Rehabilitate Airfield Vault CO -5 Project No — 60275869 2