HomeMy WebLinkAboutMurphy Tractor & Equipment, Co.-11/24/2014CITY OF WATERLOO
Council Communication
City Council Meeting: November 24, 2014
Prepared: November 18, 2014
Dept. Head Signature: Keith Kaspari
# of Attachments:
SUBJECT: Approval of Change Order #1 in the amount of $490.00 for Acquisition of Snow
Removal Equipment project for Waterloo Regional Airport.
Submitted by: Keith Kaspari, Director of Aviation
Recommended City Council Action: Approval of Change Order #1 for Acquisition of Snow
Removal Equipment project for Waterloo Regional Airport.
Summary Statement
Expenditure Required: $490.00
Source of Funds: 90% ($441.00) FAA; 10% ($49.00) PFC
Policy Issue
Alternative
Background Information: This change order provides for the installation of a new handheld
microphone assembly and external speaker for the air -band radio in the Front End Loader being
acquired under the Snow Removal Equipment project. This request has been reviewed and
approved by FAA.
CHANGE ORDER NO. 1
Owner Waterloo Regional Airport, City of Waterloo, Iowa Date October 23, 2014
Project Snow Removal Equipment (Front End Loader)
Owner's Contract No. FAA AIP Project No. 3-19-0094-043
Contractor Murphy Tractor & Equipment, Co.
Date of Contract Start September 22, 2014
You are directed to make the following changes in the Contract Documents.
ITEM NO.
DESCRIPTION
UNIT
UNIT BID
PRICE
QUANTITY
AMOUNT
110
INSTALL ADDITIONAL RADIO
EQUIPMENT
LS
$ 490.00
1.0
$ 490.00
Total Change Order No. 1 $ 490.00
Reason for Change Order:
Item No. 110 — The change is provide a handheld microphone assembly and external speaker for the air -band radio
installed in the equipment.
Snow Removal Equipment (Front End Loader)
CO -1 Project No — 60323419
1
CONTRACT PRICE
Original: $
Previous C.O.s (ADD): $
This C.O. (ADD): $
Contract Price with all
approved Change Orders: $ 243,984.00
CONTRACT TIMES (Calendar Days)
To substantial To final
completion completion
243,494.00 Original:
Previous C.O.s (ADD):
490.00 This C.O. (ADD):
REVISED:
Original Completion Date:
Revised Completion Date:
180
0
0
180
It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the
change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time
allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order.
THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL
STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO.
RECOMMENDED:
By: 45.
Engineer (Authorized Signature)
APPR
By
wner (Authorized Signature)
ACCEPTED:
B
Contractor (Authorized Signature)
lcb 12. ) 9."%
Date
11/74//
Date
Date
Snow Removal Equipment (Front End Loader)
CO -1 Project No — 60323419
2