Loading...
HomeMy WebLinkAboutPella Roofing and Insulation, Inc.-11/24/2014CITY OF WATERLOO Council Communication City Council Meeting: November 24, 2014 Prepared: November 19, 2014 Dept. Head Signature: Keith Kaspari # of Attachments: SUBJECT: Approval of Change Order #1 in the amount of -$650.00 for Pella Roofing and Insulation Contract, IDOT FY13 CSVI project for Waterloo Regional Airport. Submitted by: Keith Kaspari, Director of Aviation Recommended City Council Action: Approval of Change Order #1 for IDOT FY13 CSVI project for Waterloo Regional Airport. Summary Statement Expenditure Required: N/A Source of Funds: N/A Policy Issue Alternative Background Information: This change order adjusts all contract quantities to match field measurements for quantities installed including: inspection of roof deck determined that no replacement was necessary; and removal of unused roof vents and metal roofing patched to eliminate unnecessary penetrations in the roofing system prior to coating. Changes result in a decrease of $650 to the total contract price. Additionally, contract time was originally based on an early award of this project. The project was awarded almost a month later than anticipated therefore the project completion was extended by one month. CHANGE ORDER NO. 1 Owner Waterloo Regional Airport, City of Waterloo, Iowa Date October 21, 2014 Project Metal Roofing Restoration — Snow Removal Equipment Building Owner's Contract No. IDOT CVSI 91130A L0200 Contract # 14132 Contractor Pella Roofing and Insulation, Inc. Date of Contract Start September 22, 2014 You are directed to make the following changes in the Contract Documents. The table below represents an adjustment in all quantities to match actual field installed quantity for each line item. ITEM NO. DESCRIPTION UNIT UNIT BID PRICE QUANTITY AMOUNT 1 REMOVE AND REPLACE ROOF DECK SF $ 2.50 (540) $ (1,350.00) 110 REMOVE UNUSED ROOF STACKS EA $ 350.00 2.0 $ 700.00 Total Change Order No. 1 (FINAL) $ (650.00) Reason for Change Order: Item No. 1 — Remove and Replace Roof Deck - Roof deck was inspected and determined that no replacement was necessary, therefore item was not used. Item No. 110 — During inspection of metal roof deck it was determined that there were some roof vents that no longer were providing a function to the building. The vents were removed and the metal roofing patched to eliminate unnecessary penetrations in the roofing system prior to coating. Contract time was originally based on an early award of this project. The project was awarded almost a month later than anticipated therefore the project completion was extended by one month. CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: $ 27,950.00 Original: Previous C.O.s (ADD): $ Previous C.O.s (ADD): This C.O. (DEDUCT): $ 650.00 This C.O. (ADD): Contract Price with all REVISED: approved Change Orders: $ 27,300.00 Original Completion Date: Sept. 30, 2014 Revised Completion Date: Oct. 30, 2014 Metal Roofing Restoration CO -1 (FINAL) Project No — 60275974 1 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: U4 - Engineer (Authorized Signature) APPRO D: By: wner (Authorized Signature) ACCEPTE By: 11) Iv) Date rz/f� Date %G -z.7 -Ai Contractor (Authorized Signature) Date Metal Roofing Restoration CO -1 (FINAL) Project No - 60275974 2