Loading...
HomeMy WebLinkAboutCedar Valley Corp, Inc.-11/24/2014CITY OF WATERLOO Council Communication City Council Meeting: November 24 2 Prepared: November 17, 2014 Dept. Head Signature: Keith Kaspa # of Attachments: 1 (4 copies) SUBJECT: Approval of Change Order #2, in the amount of -$60,160.83, for Rehabilitate Taxiway B project for Waterloo Regional Airport. Submitted by: Keith Kaspari Recommended City Council Action: Approval of Change Order #2 for Rehabilitate Taxiway B project. Summary Statement Expenditure Required: N/A Source of Funds: Policy Issue Alternative Background Information: This change order adjusts all contract quantities to match field measurements for quantities installed; also adjusts payment percentage on pavement lot number 1 in accordance with the contract documents. The change order decreases the total contract amount by $60,160.83. This request has been reviewed and approved by FAA. CHANGE ORDER NO. 2 (FINAL) Owner Waterloo Regional Airport, City of Waterloo, Iowa Date October 23, 2014 Project Rehabilitation of Taxiway B Owner's Contract No. FAA AIP Project No. 3-19-0094-42 Contractor Cedar Valley Corp., LLC Date of Contract Start September 3, 2013 You are directed to make the following changes in the Contract Documents. The table below represents an adjustment in all quantities to match actual field installed quantity for each line item. ITEM NO. DESCRIPTION UNIT UNIT BID PRICE QUANTITY AMOUNT 3 PAVEMENT REMOVAL SY $ 4.50 (65.8) $ (296.10) 4 PAVEMENT MILLING SY $ 15.00 (100.0) $ (1,500.00) 8 INLET PROTECTION EA $ 125.00 (1.0) $ (125.00) 9 INLET PROTECTION REMOVAL EA $ 75.00 (1.0) $ (75.00) 12 ASPHALT TRANSITION PAVEMENT TON $ 250.00 (11.0) $ (2,750.00) 13 13 -INCH PORTLAND CEMENT CONCRETE PAVEMENT SY $ 51.11 (28.3) $ (1,446.41) 14 RUNWAY AND TAXIWAY MARKING (YELLOW -REFLECTIVE- WATERBORNE) SF $ 3.00 (81.2) $ (243.60) 15 RUNWAY AND TAXIWAY MARKING (BLACK -WATERBORNE) SF $ 2.25 (493.5) $ (1,110.38) 17 TEMPORARY RUNWAY AND TAXIWAY MARKING (WATERBORNE) SF $ 3.35 1,715.3 $ 5,746.26 18 6 -INCH PERFORATED SUBDRAIN PIPE LF $ 22.00 (0.5) $ (11.00) 20 SEEDING AND MULCHING AC $ 4,950.00 0.8 $ 3,960.00 21 STABILIZING CROP AC $ 600.00 (0.6) $ (360.00) 22 TOPSOIL - OBTAINED OFFSITE CY $ 24.00 (36.0) $ (864.00) 23 NO. 8 AWG L -824C CABLE, INSTALLED IN DUCT BANK OR CONDUIT LF $ 1.10 (390.0) $ (429.00) 24 NO. 6 AWG BARE COPPER COUNTERPOISE, INSTALLED IN TRENCH INCLUDING GROUND RODS AND GROUND CONNECTORS LF $ 1.20 (370.0) $ (444.00) 25 2 INCH SCHEDULE 40 PVC ELECTRICAL CONDUIT INSTALLED IN TRENCH LF $ 2.50 (370.0) $ (925.00) 110 PAY REDUCTION FOR P-501 LOT # 1 SY $ (25.555) 2,320.0 $ (59,287.60) Total Change Order No. 2 (FINAL) $ (60,160.83) Rehabilitation of Taxiway B CO -2 (FINAL) 1 Project No - 60305837 Reason for Change Order: Item No. 3 - Pavement Removal - Quantity adjusted based on field measurements. Item No. 4 - Pavement Milling — Item was not required, removed from project. Item No. 8 - Inlet Protection - Quantity adjusted based on field measurements. Item No. 9 - Inlet Protection Removal — Quantity adjusted based on field measurements. Item No. 12 — Asphalt Transition Pavement — Quantity adjusted based on field installed quantities. Item No. 13 — 13 -Inch Portland Cement Concrete Pavement — Quantity adjusted based on field measurements. Item No. 14 — Runway and Taxiway Marking (Yellow -Reflective -Waterborne) — Quantity adjusted based on field measurements. Item No. 15 — Runway and Taxiway Marking (Black -Waterborne — Quantity adjusted based on field measurements. Item No. 17 — Temporary Runway and Taxiway Marking (Waterborne) — Final paving of project was too late in construction season to allow for application of any permanent pavement marking. Additional temporary pavement marking was required to allow use of taxiway over winter season. Item No. 18 — 6 -Inch Perforated Subdrain Pipe — Quantity adjusted based on field measurements. Item No. 20 — Seeding and Mulching — Quantity adjusted based on field measurements. Item No. 21 — Stabilizing Crop — Quantity adjusted based on field measurements. Item No. 22 — Topsoil — Obtained Offsite — Quantity adjusted based on field measurements. Item No. 23 — No. 8 AWG L -824C Cable, Installed in Duct Bank or Conduit — Quantity adjusted based on field measurements. Item No. 24 — No. 6 AWG L -824C Copper Counterpoise, Installed in Trench including Ground Rods and Ground Connectors — Quantity adjusted based on field measurements. Item No. 25 — 2 Inch Schedule 40 PVC Electrical Conduit Installed in Trench — Quantity adjusted based on field measurements. Item No. 110 — The change is due to pay reduction for Pavement Lot No. 1. Pay reduction is in accordance with the requirements of Paragraph 501-8.1, Basis of Adjusted Payment, in Specification Section P-501, Portland Cement Concrete Pavement. Rehabilitation of Taxiway B CO -2 (FINAL) Project No — 60305837 2 CONTRACT PRICE Original: $ 592,527.40 Previous C.O.s (ADD): $ 13,440.00 This C.O. (DEDUCT): $ 60,160.83 Contract Price with all approved Change Orders: $ 545,806.57 CONTRACT TIMES (Calendar Days) To substantial To final completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 90 0 10 100 Original Completion Date: Dec. 2, 2013 90 Revised Completion Date: Dec. 12, 2013 100 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: n `3. lam_ Engineer (Authorized Signature) APPRU' By /yfr wner (Authorized Signature) ACCEPTd D: By: Contractor (Authorized Signature) Date /i/v/i/z--f Date /0/Z -7//y Date Rehabilitation of Taxiway B CO -2 (FINAL) Project No — 60305837 3