HomeMy WebLinkAboutAspro. Inc-12/15/2014CITY OF WATERLOO Council Communication City Council Meeting: December 15, 2014 Prepared: December 8, 2014 Dept. Head Signature: Keith Kaspari # of Attachments: 1 SUBJECT: Approval of Change Order #3, which decreases the total contract by $111,705.70, for Rehabilitation of Taxiway E project for Waterloo Regional Airport. Submitted by: Keith Kaspari, Director of Aviation Recommended City Council Action: Approval of Change Order #3 for Rehabilitation of Taxiway E project. Summary Statement Expenditure Required: N/A Source of Funds: Policy Issue Alternative Background Information: This final change order decreases the contract with ASPRO, Inc for the Rehabilitation of Taxiway E project for Waterloo Regional Airport. This change order adjusts all contract quantities to match field measurements for quantities installed. This change order also adjusts payment percentage on Bituminous Leveling Course Lot #1, which did not meet requirements, contractor chose to leave bituminous pavement in place and take a 50% reduction in payment. This request has been reviewed and approved by FAA. CHANGE ORDER NO. 3 (FINAL) Owner Waterloo Regional Airport, City of Waterloo, Iowa Date November 20, 2014 Project Rehabilitation of Taxiway E Owner's Contract No. FAA AIP Project No. 3-19-0094-41 Contractor Aspro, Inc. Date of Contract Start June 3, 2013 You are directed to make the following changes in the Contract Documents. Description: Item No. Description Unit Unit Price Quantity Amount 3 PAVEMENT MILLING LESS THAN 6 -INCHES SY $4.95 (59.0) ($292.05) 5 PCC PAVEMENT PATCHING SF $22.60 (0.5) ($11.30) 7 PCC PAVEMENT JOINT AND CRACK FILLING LF $2.40 710.0 $1,704.00 11 UNCLASSIFIED EXCAVATION CY $25.00 (360.0) ($9,000.00) 12 INLET PROTECTION EA $145.00 (2.0) ($290.00) 13 INLET PROTECTION REMOVAL EA $76.50 (2.0) ($153.00) 14 WOOD EXCELSIOR MAT SY $1.35 (1,980.0) ($2,673.00) 15 BITUMINOUS LEVELING COURSE TON $85.25 174.79 $14,900.85 16 BITUMINOUS SURFACE COURSE TON $85.25 (658.93) ($56,173.78) 17 BITUMINOUS TACK COAT GAL $3.00 (475.0) ($1,425.00) 18 RUNWAY AND TAXIWAY MARKING (YELLOW - REFLECTIVE -WATERBORNE) SF $0.75 (4.0) ($3.00) 19 RUNWAY AND TAXIWAY MARKING (WHITE - REFLECTIVE -WATERBORNE) SF $0.55 (6,756.0) ($3,715.80) 20 RUNWAY AND TAXIWAY MARKING (BLACK -NON - REFLECTIVE -WATERBORNE) SF $0.65 5,334.0 $3,467.10 22 TEMPORARY MARKING SF $0.65 (2,015.0) ($1,309.75) 24 STABILIZING CROP AC $675.00 (1.0) ($675.00) 25 TOPSOIL - OBTAINED OFFSITE EA $60.00 (360.0) ($21,600.00) 27 NO. 6 AWG BARE COPPER COUNTERPOISE, INSTALLED IN TRENCH, DUCT OR CONDUIT LF $1.20 (125.0) ($150.00) 28 2 INCH SCHEDULE 40 PVC ELECTRICAL CONDUIT INSTALLED IN TRENCH LF $2.50 (80.0) ($200.00) 102 PAY REDUCTION FOR LEVELING COURSE MATERIAL LOT #1 TON $42.625 (800.14) ($34,105.97) Change Order Subtotal ($111,705.70) Total Amount of Change Order ($111,705.70) Rehabilitation of Taxiway E CO -3 (FINAL) Project No - 60278510 1 Reason for Change Order: Items 3 & 5 — Final quantities revised to match field measured quantities. Item 7 — Thermal cracking in pavement surface was routed and sealed. Items 11, 12 & 13 — Unclassified excavation was not required since the contractor minimized their disturbance along the edge of the pavement. Due to the limited disturbance the inlet protection was also not needed. As a result, these three bid items are being deleted from the contract. Item 14 — Due to the limited disturbance noted above, the amount of wood excelsior mat required for this project was less than estimated. As a result, the final quantity is being adjusted to match the field measured quantity. Items 15, 16 & 17 — Final quantity revised to match field measured quantity. Items 18, 19, 20 & 22 — Final quantities revised to match field measured quantities. Item 24 — Stabilizing crop was not needed for this project and will be deleted from the contract. Item 25 — Adequate topsoil was salvaged on site due to the limited disturbance area. As a result this item is being deleted from the contract. Items 27 & 28 — Final quantity revised to match field measured quantity. Item 102 —Lot #1 of the Bituminous Leveling Course did not meet requirements of P-401. Contractor chose to leave bituminous pavement in place and take a 50% reduction in payment per specification P- 401. Rehabilitation of Taxiway E CO -3 (FINAL) Project No — 60278510 2 CONTRACT PRICE CONTRACT TIMES (Calendar Days) To substantial To fmal completion completion Original: $ 1,083,425.25 Original: 90 Previous C.O.s (ADD): $ 18,961.45 Previous C.O.s (ADD): 21 This C.O. (ADD): $ (111,705.70) This C.O. (ADD): 0 Contract Price with all REVISED: 111 approved Change Orders: $ 990,681.00 Original Completion Date: Aug. 31, 2013 90 Revised Completion Date: Sept. 21, 2013 111 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: Q .►.)1 3. Engineer (Authorized (Authorized Signature) Date 020/ Owner (Authorized Signature) Date ACCEPTED: ractor (Authorized Signature) /i%// Date Rehabilitation of Taxiway E CO -3 (FINAL) Project No — 60278510 3