SUBJECT: Approval of agreement with AECOM of Waterloo, Iowa in the amount of $17,900
for engineering services related to the design of upgrades to emergency generator; rehabilitation of
FBO building windows and masonry sealing; and replace exterior doors in Terminal bag makeup
area for Waterloo Regional Airport.
Submitted by: Keith Kaspari, Director of Aviation
Recommended City Council Action: Approval of agreement with AECOM of Waterloo, Iowa in
the amount of $17,900 for engineering services related for Waterloo Regional Airport.
Summary Statement
Expenditure Required: $17,900
Source of Funds: $17,900 (100%) from IDOT grant.
Policy Issue
Alternative
Background Information: The Waterloo Regional Airport has received an IDOT Commercial
Service Vertical Infrastructure Grant to upgrade the emergency generator for the airport to meet
EPA RICE HESHAP Requirements; rehabilitate the FBO building to replace some of the
casement windows and clean and seal the exterior masonry; and replace roll -up steel doors and
upgrade electrical in the bag makeup area. This agreement is to provide for the design and
construction administration for the project to include data collection, final design, project
specifications, quality review, and project administration among other assistance.
A=COM
AECOM 319-232-6531 tel
501 Sycamore Street 319-232-0271 fax
Suite 222
Waterloo, Iowa 50703
www.aecom.com
FY 2015 VERTICAL INFRASTRUCTURE PROJECTS
IDOT PROJECT NO. 91150AL0200
IDOT CONTRACT NO. 16609
WATERLOO REGIONAL AIRPORT
WATERLOO, IOWA
Project Description - See Attachment and incorporated herein.
Scope of Services - See Attachment and incorporated herein.
Compensation
Compensation for Services for this project shall be a cost plus fixed fee not -to -exceed Seventeen
Thousand Nine Hundred Dollars ($17,900.00). See attachment and incorporated herein.
General Conditions
Except as specifically amended by this Individual Project Agreement, Services shall be provided in
accordance with the Consultant Services Agreement for the Waterloo Regional Airport, entered
between AECOM Technical Services, Inc. ("ATS"), and the City of Waterloo ("Client"), dated April
15, 2014.
APPROVED:
CITY OF WATERLOO, IOWA
APPROVED:
AECOM TECHNICAL SERVICES, INC.
By 7 ByIiL tI
Ernest G. Clark D;.uglas W. Scher'", P.E.
Mayor
Date
ssociate Vice President
Date December 8, 2014
A=COM
SCOPE OF SERVICES
FY 2015 VERTICAL INFRASTRUCTURE PROJECTS
IDOT PROJECT NO. 91150AL0200
IDOT CONTRACT NO. 16609
WATERLOO REGIONAL AIRPORT
WATERLOO, IOWA
I. Project Description
Page 2
The project is described as the projects associated with the Iowa Department of
Transportation FY 2015 Vertical Infrastructure Projects. Projects identified in the grant
include the following:
1. Upgrade the Emergency Generator for the airport to meet the EPA RICE HESHAP
Requirements. The generator that serves the terminal building and airfield lighting
does not meet the National Emission Standards for Hazardous Air Pollutants for
Stationary Reciprocating Internal Combustion Engines. These standards limit
emissions of toxic pollutants from the combustion engine. In order to meet these
requirements, modifications to the exhaust and the addition of a monitoring system
is required.
2. Window Replacement and Exterior Masonry Sealing. The FBO building was
constructed in 1981. The windows have deteriorated over the years and some
currently leak. This project will replace some of the casement windows in the
building, and clean and seal the exterior masonry.
3. Replace Exterior Doors in Terminal Building Bag Makeup Area. The current doors
are roll -up steel doors, and the new doors will be more energy-efficient and
customer -friendly. The improvements to the electrical system will include motion
sensor switches and LED lighting in the bag makeup area.
11. Scope of Services
The work to be performed by the Consultant includes the following tasks:
1. Data Collection and Review. This task consists of the collection of existing data
applicable to this project and related to the proposed work site. The record
drawings of completed projects and utility information will be compiled as
background information for the project. As part of this task, a field survey will be
performed to collect dimensional sketches as necessary for the window
replacement in the FBO building and the replacement of the exterior doors in the
terminal building bag makeup area. The Client shall coordinate with lease holders
of FBO so that the Consultant can gain access to these in a timely manner for the
purpose of survey, investigation and photographic documentation of the FBO office
building windows.
2. Final Design. This task consists of the preparation of the final bid documents for
this project, including specifications, drawings (if required) and cost estimates. The
final plans and/or specifications will set forth the requirements of the design phase.
3. Final Project Specifications. This task consists of the preparation of specifications
for the project. The specifications will be in compliance with current City of
A=COM
Page 3
Waterloo and Iowa Department of Transportation requirements in effect at the time
the specifications are prepared.
4. Estimate of Probable Construction Cost. This task consists of the preparation of an
estimate of construction costs based upon the plans and specifications. This
statement of probable construction cost prepared by the Consultant represents the
Consultant's best judgment as a design professional at the time the estimate is
drawn. It is recognized, however, that neither the Consultant nor the Client has any
control over the cost of labor, materials or equipment; over the contractor's method
of determining bid prices; or over competitive bidding or market conditions.
Accordingly, the Consultant cannot and does not guarantee that bids will not vary
from any Statement of Probable Construction Cost or other cost estimates
prepared by the Consultant.
5. Quality Review. This task consists of the quality review of work elements on the
project. During the course of this project, quality reviews will be conducted by
senior technical personnel not directly involved in the project.
6. Bid Assistance. This task consists of assisting the Client in advertising for and
receiving bids or quotes, analyzing the bids or quotes received and preparing a
recommendation to the Client for award of contract.
7. Bid Document Interpretation. This task consists of answering bid document
interpretation questions from bidders, preparing and issuing any required addenda.
8. Resident Review. This task consists of limited on-site construction review at key
critical construction operations to observe construction operations to determine
compliance with contract documents. Site reviews will be documented in a
construction journal. Coordination with airport tenants related to this project will be
the responsibility of the Client.
9. Project Administration. This task consists of office administration and coordination
of the project. Interoffice meetings, general day-to-day administrative
responsibilities, and typing of interoffice memoranda and minutes of meetings are
included in this task.
L:\work\ADMINWGREE\PROF\Wat Air 2015 Vert Infra.doc
Upgrade Emergency Generator, Replace Windows in FBO Biding & Replace Doors at Bag Makeup
Waterloo Regional Airport
Waterloo, Iowa
2015 IDOT Vertical Infrastructure - IDOT Proj. No. 91150ALO200 - IDOT Cont. No. 16609
Engineering Services
Consultant Cost Summary
Direct Labor Cost
Category Hours Rate/Hour Amount
Senior Professional 28 $80.00 $2,240.00
Project Professional 0 $53.10 $0.00
Staff Professional 40 $42.20 $1,688.00
Professional 0 $32.00 $0.00
CADD Operator II 24 $31.35 $752.40
CADD Operator I 0 $22.65 $0.00
Senior Technician 24 $33.20 $796.80
Technician 0 $25.25 $0.00
Project Support 16 $28.45 $455.20 $5,932.40
132
II. Payroll Burden and Overhead Costs 150.00% $8,898.60
III. Direct Project Expenses
Category Units Rate/Unit Amount
Mileage 800 0.560 448.00
Per Diem 0 40.00 0.00
Lodging 0 80.00 0.00
B/W Copies 500 0.06 30.00
Color Copies 200 0.22 44.00
Plan Copier 100 0.50 50.00
EDM Equipment 0 12.50 0.00
GPS Equipment 0 25.00 0.00
Nuclear Density Guage 0 40.00 0.00
Miscellaneous, Other 270.00 $842.00
IV. AECOM Estimated Actual Costs $15,673.00
Rounded $15,675.00
V. Subcontract Expense
$0.00
VI. Estimated Actual Costs $15,675.00
VII. Fixed Fee (15% of Items I & II) $2,225.00
VIII. Maximum Amount Payable $17,900.00
Upgrade Emergency Generator, Replace Windows in FBO Biding & Replace Doors at Bag Makeup
Waterloo Regional Airport
Waterloo, Iowa
2015 IDOT Vertical Infrastructure - IDOT Proj. No. 91150ALO200 - IDOT Cont. No. 16609
Engineering Services
Staff Hour Estimate
Item
No.
Description
Senior
Prof
Project
Prof
Staff
Prof
Prof
CADD
Operator II
CADD
Operator I
Senior
Technician
Technician
Project
Support
Totals
1
Data Collection & Review
8
8
2
Project Plans
4
20
24
48
3
Project Specifications
8
12
20
4
Estimate of Construction Cost
2
4
6
5
Quality Review
4
4
6
Bid Assistance
4
4
7
Bid Document Interpretation
2
4
6
8
Resident Review
24
24
9
Construction Administration
8
4
12
Total Services
28
0
40
0
24
0
24
0
16
132