HomeMy WebLinkAboutAspro Inc-1/28/2013CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2013 TRAIL REPAIR PROGRAM — ZONE 1 CONTRACT NO. 825 Date Prepared: January 22, 2013 AMOUNT: $3,660.85 INCREASE TO: ASPRO, INC. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated October 8, 2012 . A. Description of change to be made or extra work to be done: Adjust original construction quantities to actual construction quantities. B. Reason for ordering change or extra work: As -built quantities varied for some bid items. C. Settlement for cost of work to be made as follows: Compensation already made to contractor through original bid items. See attached summary. CITY OFANATERLOQ BY: z"/1,`� A Mayor ATTEST: City OCerk i Change Order No. 8 NET INCREASE $3,660.85 112)d )0' ASPRO INC. Date CONTRACTOR BY: ��� C/ Ze'.4/- 1/23/2013 Date `/..)(7t -4„) Date PRINTED NAME: Milt Dakovich TITLE: President APPROVED: h./a>c } � `%23/13 City Engineer Date Contract No. 742 Page 1 of 1 FY 2013 Trail Repair Program - Zone 1 Over/Under Summary 1/23/2013 B/d Item Description Unit Contract Quantity Completed Quantity ASPRO Unit Cost ASPRO Total Cost Over/Under Quantity Over/Under Amount 1 Partial Depth Pavement Section Removal SY 3189.0 3180 $ 7.00 $ 22,260.00 9.0 $ 63.00 2 Subbase Compaction SY 3189.0 3180.0 $ 0.75 $ 2,385.00 9.0 $ 6.75 3 Hot Mix Asphalt, 3 -inch Ton 550.0 571.1 $ 115.00 $ 65,676.50 -21.1 $ (2,426.50) 4 Hydroseeding SY 1276.0 1710.7 $ 3.00 $ 5,132.10 -434.7 $ (1,304.10) 5 Traffic Control LS 1.0 1.0 $ 1,500.00 $ 1,500.00 0.0 $ - Subtotal= $ Original Contract Amount = $ Final Contract Amount = $ Pay Estimate Summary Pay Est. No. Amount 1 $ 80,992.25 2 $ 11,113.67 (3,660.85) 93,292.75 89, 631.90