HomeMy WebLinkAboutAecom Technical Sevice-3/25/2013ACOM March 8, 2013 Mr. Larry Smith Water Pollution Control Facilities 3505 Easton Avenue Waterloo, Iowa 50702 Subject: Waterloo WPCF UV Disinfection Facilities City Contract No. 817 AECOM #60184375 AECOM 319-232-6531 tel 501 Sycamore Street 319-232-0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com Dear Larry, Enclosed please find two (2) copies of Change Order No. 1 to the above -referenced project. The change order reflects a number of items and is for a net increase in the Contract Amount of $38,777.00. The change order reflects an increase of approximately 0.94%. The most significant item in the change order is the switchgear, which was originally going to be supplied by MidAmerican Energy. As you know, they changed their policy, and we ended up purchasing the switchgear under this Contract. The city also purchased an additional transformer as a result of the MidAmerican change. The project is very nearly completed, and we do not anticipate any significant change order items through project completion. We have discussed the change order previously. If you have any questions or if you need anything further from us at this time, please let us know. Yours sincerely, Robert E. Bamsey, P.E. Enclosures: As Noted c: Ms. Suzy Schares (w/enclosure) 602709631200nsCOt.docx CHANGE ORDER NO. 1 Owner: City of Waterloo, Iowa Date: February 25, 2013 Project Waterloo WPCF—UV Disinfection Owner's Contract No.: 817 Contractor: Story Construction, Co. Date of Contract Start May 29, 2012 $ 4,123,000 You are directed to make the following changes in the Contract Documents. Description: See attached list. Reason for Change Order: See attached list. CONTRACT PRICE CONTRACT TIMES To Completion Original: $ 4,123,000.00 Original: April 30, 2013 Previous r n r wnnmEDT CT). $ 0.00 Previous C.O.s (ADD/DEDUCT): This C.O. (ADD,"'�CT): $ 38,777.00 This C.O. (ADD/DEDUCT): Contract Price With All Approved Change Orders: $ 4,161,777.00 REVISED: April 30, 2013 Original Completion Date: April 30, 2013 Revised Completion Date: April 30, 2013 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration cost. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO ACCEPTED„,:j By: —/3 —/ 3 -5- 1� uthorized Signature) Date: L:\work\project\602709631600 CRS1606 Construction Contract_Changes\606.1_Change_Orders\C01.doe AECOM 60270963.600 1 Project No. Change Order No. Waterloo WPCF UV Disinfection Project # 60270963 Contractor : Story Construction Company Item # Description Deduct Add Reason for Change 1 Shift Building 31' South $ 13,800.00 Simplify Excavation & Plant Operation 2 Add Filter Fabric at Excavation for Building $ 9,171.00 Drainage to Prevent Settlement @ Building 3 Add Switchgear $ 30,392.00 MidAmerican Energy Policy Change 4 Add 2 - 2" Electrical Conduits $ 7,988.00 Provide Spare Conduits for Future Use 5 Add Insulation to Roof Drain & 2" Water in UV Building $ 2,335.00 Insulate Pipes for Corrosion Protection 6 Change Power Cable to 1/0 $ 2,691.00 MidAmerican Energy Requirement SUBTOTAL $ 13,800.00 $ 52,577.00 TOTAL $ 38,777.00 L:\work\project\60270963\600_CRS\606_Construction_Contract_Changes\Change Order #1 Information.xlsx