HomeMy WebLinkAboutVJ Engineering-4/1/2013Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SEWAGE TREATMENT AGREEMENT
INSTRUCTIONS
This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e., a
private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the
permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the project.
This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities.
However, the Department of Natural Resources must be informed in writing that the contractual agreement does exist.
APPLICANT ENGINEER
OWNER...._... — �....__......
Allen Memorial Hospital
ADDRESS
1825 Logan Avenue, Waterloo, IA 50703
REPRESENTATIVE
Terry Flynn, Director of Plant Services
PROJECT IDENTIFICATION
FIRM
VJ Engineering
ADDRESS
1501 Technology Parkway, Suite 100, Cedar Falls, IA 50613
TELEPHONE
319-235-3604
PROJECT OFFICER
Bruce P. Radue, P.E.
rELEP1-IONE
319-266-5829
United Medical Park - South Sanitary Sewer Extension
OWNER AND SYSTEM RECEIVING WASTES
City of Waterloo
CF.RTIF1CATE
I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be
constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the
treatment system identified above.
TITLE
Director of Plant Services
AGREEMENT TO PROVIDE SEWAGE TREATMENT
1 am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary
sewerage facilities identified above is approved by the owner, and that the owner accepts responsibility for providing adequate
treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B, Code of Iowa, and the rules
of the Department of Natural Resources. This agreement shall not be construed in any way to affect any local ordinances, sewer
service agreements, or fee systems entered into between the parties.
TUR
1—TYPED OR PRINTED NAME
_.__....-- - - ... lit
PHONE NUMBER DATE
DNR form 29 (Nov 00
m -0q i- 41i /61
542-3219
Exhibit 11A
Iowa Department of Natural Resources Wastewater Engineering Section
Construction Permit Application
SCHEDULE A, General Information
APPLICANT
ENGINEER
OWNER E-MAIL ADDRESS
Allen Memorial Hospital F1ynnTM@ihs.org
FIRM E-MAIL ADDRESS
VJ Engineering bradue@vjengineering.com
ADDRESS
1825 Logan Avenue, Waterloo, IA 50703
ADDRESS
1501 Technology Parkway, Suite 100, Cedar Falls, IA 50613
REPRESENTATIVE TELEPHONE
Terry Flynn, Director of Plant Services 319-235-3604
PROJECT OFFICER TELEPHONE
Bruce P. Radue, P.E. 319-266-5829
PROJECT IDENTIFICATION
United Medical Park— South Sanitary Sewer Extension
ESTIMATED START DATE *
March 15, 2013
ESTIMATED COMPLETION DATE
July 31, 2013
1. Has an engineering
If Yes=>
2. Does the
loadings,
facilities
If No-=>
3. Are there
For a
Standard
three
4. Are approved
If Yes=>
5. Does each
"professional
If No=> Processing
specifications
6. Is this a
If Yes=> A
Water
7. Is the applicant
If No=> A
accompany
8. Is a new
If Yes=> A
9. Is any waterline
within 400
If Yes=> Identify
10. Will construction
If No=>
11. Will this
project
construction
plan?
Provide
three
minor
sets
joint
construction
Sewage
or
new
PLEASE RESPOND TO ALL QUESTIONS
report, facilities plan or other information previously been submitted for this project?
YES NO
❑ /1
PROJECT IDENTITY
DATE SUBMITTED
and construction permit application, as submitted, follow the recommendations, design
schedule, permit limits, and conclusions of the approved engineering report or
the design basis and technical information justifying all changes.
complete sets of plans and specifications accompanying this application?
gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design
11.1, two complete sets will be adequate for expeditious approval. For more complex projects,
of plans and specifications may be requested.
standard specifications a part of this application?
11 ❑
/1 ❑
4 ❑
APPROVED STANDARD SPECIFICATIONS OF
(municipality or firm)
City of Waterloo
DATE APPROVED
set of plans and specifications or engineering report accompanying this application contain a
engineering seal" executed in conformance with 542B.16, Code of Iowa?
will be delayed pending receipt of applicable design schedules and certified plans,
or engineering report.
wastewater and water supply project?
permit application for the water supply project should be submitted separately to the
Supply Section. A water supply permit fee may be required.
to provide treatment of effluent resulting from this construction?
Treatment Agreement (DNR Form 29) executed by the authority providing treatment must
this application.
amended operation permit necessary to use the facilities described in this application?
or amended permit to operate may be requested prior to the receipt of a construction permit.
located within 10 feet; or any private or public well, lake, or public recreation area located
feet of the proposed construction?
and locate the facility(s) relative to the proposed construction.
inspection be conducted by a licensed engineer employed by the applicant?
w ❑
❑ ►'
❑ w
❑ �/
❑ N
w ❑
❑ 11
NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
project utilize CWSRF loan funds?
CERTIFICATION
APPLICANT
I certify that I am the authorized representative of the owner and
state that the project identified above is approved by the owner.
J
r' S
ENGINEER
I certify that all aspects of design included in this application
conform to applicable standards contained in Chapter 567 IAC
64, or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application, and to the best of my
knowledge, such information is complete and accurate.
SIGNATUR //ll DATE
o✓
SIGNATURE DATE
i fP g�
���"'-%�--d c Gi=-_� jv= 1°''ter " i % y
* Estimated Construction Start Date: Complete applications must be submitted at least 120 days in advance of the date for
starting construction in accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
orm 28A (Sept 2010)
542-3129
Construction Permit Application
SCHEDULE A, General Information, page 2
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules attached to this application.
INCLUDED IN SUBMITTAL
SCHEDULE TITLE ATTACHED PROJECT DATE
B Collection system ® ❑
C Lateral Sewer Extension
D Trunk & Interceptor Sewer
E Wastewater Pump Station
F Treatment Project Site Selection
G Treatment Project Design Data
H1 Schematic Flow Diagram
H2 Treatment Process Loading and
Removal Efficiency
H3 Mechanical Plant Reliability
I Screening, Grit Removal and Flow
Measurement
J Septic Tank System
K1 Controlled Discharge Pond
K2 Aerated Pond
K3 Anaerobic Lagoon
L Setting Tanks
M Fixed Film Reactor — Stationary Media
N Rotating Biological Contactor
O Aeration Tanks or Basins
P Gas Chlorination
Q Sludge Digestion and Holding
R1 Sludge Dewatering and Disposal
R2(A & B) Low Rate Land Application of Sludge
R3 Land Application of Sewage Sludge
(To be developed)
S Land Application of Wastewater
(To be developed)
Sewage Treatment Agreement
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A (Sept 2010)
542-3129
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B, Collection system
DATE PREPARED
1/9/2013
DATE REVISED
PROJECT IDENTITY
United Medical Park - South Sanitary Sewer Extension
DNR USE
PROJECT NO.
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the
system. If no portion is subject to flooding, state none.
Segment
None
Flooding Protection
*2. Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and
3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
Location
Design capacity, MGD
Peak Hourly Dry weather Flow
MGD (actual)
Peak Hourly Wet Weather Flow
MGD (actual)
Segment
Segment
Segment
NW1/4, 5-88-13
2.29
0.78
1.56
*3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water
Pollution Control Plant
Facility Loading
Design
Average Wet Weather (actual)
Peak Hourly Wet Weather (actual)
MGD
#BODS/day
34.8
88,000
24.53
31,500
60+
48,000+
Provide projected design loading increase, which will be added to this facility as a result of this project.
Design Loading
Initial
Design Year (2020)
Residential service area Acres Acres
Population Persons Persons
Flow (100 GPCD) GPD GPD
BOD5 (0.17 #/d/cap) #/day #/day
Industrial service area Acres Acres
Rated flow GPD GPD
BODS #/day #/day
Other Comm. 1.6 Acres 4.0 Acres
Rated Flow 8,000 GPD 20,000 GPD
BODS 13.6 #/day 34.0 #/day
Total BOD5 13.6 #/day 34.0 #/day
Total Flow 8,000 GPD 20,000 GPD
Peak Hourly Flow 32,000 GPD 80,000 GPD
* Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
DNR form 28B (Nov 00)
542-3095
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE C, Lateral Sewer Extension
DATE PREPARED
1/9/2013
DATE REVISED
PROJECT IDENTITY
United Medical Park - South Sanitary Sewer Extension
DNR USE
PROJECT NO.
PERMIT NO.
1. Design Basis Initial Design Year (2020)
Residential service area Acres Acres
Population Persons Persons
Flow (100 GPCD) GPD GPD
BOD5 (0.17 #/d/cap) #/day #/day
Industrial service area 5.4 Acres 22.2 Acres
Rated Flow 27,000 GPD 111,000 GPD
BOD5 45.9 #/day 188.7 #/day
Other Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Total BODS 45.9 #/day 188.7 #/day
Total Flow 27,000 GPD 111,000 GPD
Peak Hourly Flow 102,600 GPD 421,800 GPD
2. Pipe
Diameter 8 Inch 10 Inch 12 Inch
Material PVC Truss
Joint Elastomeric
Minimum Slope 2.80 % % %
Maximum Manhole Space 175 ft. ft. ft.
Total Sewer Length 205 ft.. ft. ft.
Maximum Cover 8.3 ft. ft. _ ft.
Minimum Cover 7.1 ft. ft. ft.
3. Construction specifications (indicate ASTM No. or other standard included in the specifications). A brief description is required
in each part.
A. Bedding class ASTM Class II, D2321-75 except as modified by ASTM D2680-01
B. Pipe laying ASTM Class II, D2321-75 except as modified by ASTM D2680-01
C. Compaction 95% Standard Proctor Density
D. Manhole ASTM C478, 48" dia.
E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI
F. Infiltration/exfiltration test procedures v -notch weir, televising, or air test
G. Alignment & grade test procedures
(1) During construction: Stake & batter board yes Laser yes
(2) After construction: Lamping yes Other televising
H. Deflection test procedures NA
4. Are detailed manhole drawings included: Yes ❑ No
Typical frame and cover assembly Neenah R-1642
Are manhole covers nonvented: Yes ® No ❑
Manhole diameter 48 in.
Manhole opening diameter 24 in. Material Concrete
5. Minimum sewer & water main separation: Horizontal 10
Are specifications included? No
ft. Vertical 18 in.
6. Stream, road, or railroad crossing protection NA
Are specifications included? NA
DNR form 28C (Nov 00)
542-3096