Wastewater Disposal System Construction Permit
Application Fee Form
CASHIER'S USE ONLY
0945-542-N P D E -C P-0570
32-3202
Owner
Owner Name: City of Waterloo, Iowa
Address: 715 Mulberry Street
City, State, Zip: Waterloo, Iowa, 50703
Project Identification: La Porte Road Pumping Station and Force Main, City Contract No. 847
$100 Fee enclosed
Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources".
Place it and the check or money order on top of other Construction Permit Application documents.
Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by
Iowa Code 455B.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by
Iowa Code 455B.197 and Iowa Administrative Code 567 IAC 64.16(3)"c".
The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump
stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents
necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well
as the appropriate schedules indentified on page 2 of Schedule A). The construction permitting process is initiated as
planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility
plans precedes submittal of technical documents necessary to constitute a construction permit application. The
application fee is not necessary when submitting a planning document but must accompany construction permit
application documents. A fee should accompany each permit application received on or after July 1, 2006.
Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions
regarding the application fee, please contact Donna Gomm at 515-281-8502 or Donna.Gomm@dnr.iowa.gov
Signature of Owner or Representative:
Printed Name: C -d 6u -
Telephone or email contact:
Cwt 0I CC)
Mail to:
Iowa Department of Natural Resources
Wastewater Engineering Section
502 East 9th Street
Des Moines, IA 50319-0034
06/2011 cmz
DNR Form 542-1245
Exhibit 11A
Iowa Department of Natural Resources Wastewater Engineering Section
Construction Permit Application
SCHEDULE A, General Information
APPLICANT
ENGINEER
OWNER E-MAIL ADDRESS
City of Waterloo, IA larry.smith@waterloo-ia.org
FIRM E-MAIL ADDRESS
AECOM todd.aliyn@aecom.com
ADDRESS
715 Mulberry Street, Waterloo, IA 50703
ADDRESS
500 SW 7t' Street, Suite 301, Des Moines, Iowa 50309
REPRESENTATIVE TELEPHONE
Larry Smith 319-291-4553
PROJECT OFFICER TELEPHONE
Todd Allyn 515-323-7921
PROJECT IDENTIFICATION
La Porte Road Pumping Station & Force Main
City Contract No. 847
ESTIMATED START DATE *
06/03/13
ESTIMATED COMPLETION DATE
09/30/13
PLEASE RESPOND TO ALL QUESTIONS YES NO
1. Has an engineering report, facilities plan or other information previous! been submitted for this project? 0
►�
If Yes=>
PROJECT IDENTITY
DATE SUBMITTED
2. Does the project and construction permit application, as submitted, fol ow the recommendations, design
loadings, construction schedule, permit limits, and conclusions of the approved engineering report or
facilities plan?
If No=> Provide the design basis and technical information justifying all changes.
3. Are there three complete sets of plans and specifications accompanying this application?
For a minor gravity sewer extension within the meaning of 4558.183.3 Code of Iowa and Design
Standard 11.1, two complete sets will be adequate for expeditious approval. For more complex projects,
three sets of plans and specifications may be requested.
4. Are approved standard specifications a part of this application?
0
►t
1 /
CI
■
0
If Yes=>
APPROVED STANDARD SPECIFICATIONS OF
(municipality or firm)
SUDAS Specifications
DATE APPROVED
2012
5. Does each set of plans and specifications or engineering report accompanying this application contain a
"professional engineering seal" executed in conformance with 5428.16, Code of Iowa?
If No=> Processing will be delayed pending receipt of applicable design schedules and certified plans,
specifications or engineering report.
6. Is this a joint wastewater and water supply project?
If Yes=> A construction permit application for the water supply project should be submitted separately to the
Water Supply Section. A water supply permit fee may be required.
7. Is the applicant to provide treatment of effluent resulting from this construction?
If No=> A Sewage Treatment Agreement (DNR Form 29) executed by the authority providing treatment must
accompany this application.
8. Is a new or amended operation permit necessary to use the facilities described in this application?
If Yes=> A new or amended permit to operate may be requested prior to the receipt of a construction permit.
9. Is any waterline located within 10 feet; or any private or public well, lake, or public recreation area located
within 400 feet of the proposed construction?
If Yes=> Identify and locate the facility(s) relative to the proposed construction.
10. Will construction inspection be conducted by a licensed engineer employed by the applicant?
0
0
/1
•
i4
■
0
►i
■
11
0
//
If No=>
NAME OF ENGINEERING FIRM CONDUCTING INSPECTION
AECOM
11. Will this project utilize CWSRF loan funds? 0
CERTIFICATION
APPLICANT
I certify that I am the authorized representative of the owner and
state tha project identified abov is a oved by the owner.
5/1/
LP IN 3
ENGINEER
I certify that all aspects of design included in this application
conform to applicable standards contained in Chapter 567 IAC
64, or that an explanation and justification for any proposed
variations from such standards is attached. I am familiar with the
information contained in this application, and to the best of my
knowledge, such information is complete and accurate.
SIG TU IRE / I
ORA (. 01,14 i diuku
' DATE
` r
SIGNATURE DATE
47 evtZ2 V_3
* Estimated Construction Start Date: Complete applications must be sub e a 20 days in advance of the date for
starting construction In accordance with Rules 567 IAC 60.4 and 64.2
PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM
rm 28A (Sept 2010
Ldwarklpmo)ed\602788T400 Teeh*a11420 Specs180278887 - LaPorte Road Pump Ste -Force Mein )O La Porto Road -SCHEDULE Ad=
542-3129
Construction Permit Application
SCHEDULE A, General Information, page
2
SCHEDUL
E
B
C
D
E
F
G
H1
H2
H3
J
K1
K2
K3
L
M
N
0
P
Q
R1
R2(A & B)
R3
S
DOCUMENT CHECKLIST
Identify all categories included in this project. Also, identify schedules
TITLE ATTACHED
Collection system
Lateral Sewer Extension
Trunk & Interceptor Sewer
Wastewater Pump Station
Treatment Project Site Selection
Treatment Project Design Data
Schematic Flow Diagram
Treatment Process Loading and
Removal Efficiency
Mechanical Plant Reliability
Screening, Grit Removal and Flow
Measurement
Septic Tank System
Controlled Discharge Pond
Aerated Pond
Anaerobic Lagoon
Setting Tanks
Fixed Film Reactor — Stationary
Media
Rotating Biological Contactor
Aeration Tanks or Basins
Gas Chlorination
Sludge Digestion and Holding
Sludge Dewatering and Disposal
Low Rate Land Application of
Sludge
Land Application of Sewage Sludge
(To be developed)
Land Application of Wastewater
(To be developed)
Sewage Treatment Agreement
0
0
0
0
0
0
0
attached to this application.
INCLUDED IN
PROJECT
SUBMITTAL
DATE
® 04/03/13
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
04/03/13
Identify any categories included in this project which are not provided in the above list of schedules.
DNR form 28A (Sept 2010)
L•Mork proJedto02788B7\400 Technicall420 Spece180278887 - Laporte Road Pump Sta-For MainU0Hs Porte Road -SCHEDULE AA=
542-3129
DATE PREPARED
04/03/13
DATE REVISED
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE B, Collection system
PROJECT IDENTITY
La Porte Road Pumping Station & Force Main, City of Waterloo, Iowa
City Contract No. 847
DNR USE
PROJECT NO.
PERMIT NO.
1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the system. If no portion is
subject to flooding, state none.
Segment Flooding Protection
None
*2 Indicate hydraulic capacity of: 1) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and 3) all downstream
segments where flow restriction may occur. Indicate the source and accuracy of numerical data.
*3.
Location
Design capacity, MGD
Peak Hourly Dry weather Flow
MGD (actual)
Peak Hourly Wet Weather Flow
MGD (actual)
Segment
Segment
Segment
15"Dia. @
Discharge of New
F.M.
88,000
24.5
1.6
60±
48,000
0.01
0.03
Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data.
Facility name and number Waterloo Water Pollution Control Facility - IDNR Permit #0790001
Facility Loading
Design
Average Wet Weather (actual)
Peak Hourly Wet Weather (actual)
MGD
#BOD5/day
34.8
88,000
24.5
31,500
60±
48,000
Provide projected design loading increase, which will be added to this facility as a result of this project. None. This project replaces an existing
private pumping station with a city -owned pumping station and reroutes flow from a problem area; however, it does not add any flow or
area to the system.
Design Loading
Initial
Design Year
Residential service area Acres Acres
Population Persons Persons
Flow (100 GPCD) GPD GPD
BOD5 (0.17 #/d/cap) #/day #/day
Industrial service area Acres Acres
Rated flow GPD GPD
BOD5 #/day #/day
Other Acres Acres
Rated Flow GPD GPD
BOD5 #/day #/day
Total BOD5 #/day #/day
Total Flow GPD GPD
Peak Hourly Flow GPD GPD
*Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded.
DNR form 28B (Nov 00)
60279867/50W—La Porte Road -SCHEDULE B.docx
542-3095
DATE PREPARED
04/03/13
DATE REVISED
Iowa Department of Natural Resources
Wastewater Section
Construction Permit Application
SCHEDULE E, Wastewater Pump Station
PROJECT IDENTITY
La Porte Road Pumping Station & Force Main, City of Waterloo, Iowa
City Contract No. 847
DNR USE
PROJECT NO.
PERMIT NO.
1. Design Basis
Design Year (
Residential Area, Acres
Population, Persons
PHDW Flow, MGD
Type
Opening
(in)
HP
Capacity
GPM
TDH (ft.)
Operating Level
Computed
Industrial Area, Acres
PHDW Flow, MGD
On
Off
1
Submersible
Sewage Pump
4
Other
, Acres
60
68
PHDW Flow, MGD
843.75
2
Submersible
Sewage Pump
Peak Hourly Infiltration, MGD
10
200
60
Peak Hourly Inflow, MGD
846.25
843.75
3
Total PHDW Flow, MGD
Total PI-IWW Flow, MGD
2. Provide pump information
Pump
No.
Type
Opening
(in)
HP
Capacity
GPM
TDH (ft.)
Operating Level
Computed
Rated
On
Off
1
Submersible
Sewage Pump
4
10
200
60
68
846.25
843.75
2
Submersible
Sewage Pump
4
10
200
60
68
846.25
843.75
3
4
5
Sump
Are pumps specified as being capab e of passing three-inch diameter spheres? Yes ® No
Can remaining pumps handle PHWW flow with largest pump out of service? Yes No 0
3. Wet -well effective volume 1,000 gallons. Maximum retention time: Initial flow
Design flow
4. Is forced air ventilation provided? No
Continuous: wet -well dry -well Intermittent wet -well
dry -well air changes/hour dry -well
Are spark -proof materials specified? Yes ►�0 No D
5 minutes.
5 minutes.
dry -well
air changes/hour
5. Force main: Is profile of force main provided? Yes 11- No 0
Size 6 in. Length 4,857 ft. Detention time at ADW design flow hours.
Pipe material PVC Joint Restrained @ Trenchless & Unrestrained @ Trenched
Minimum cover 6 ft. Minimum velocity fps
Number of high points 2 Are air relief valves provided? Yes ® No 0
Number of thrust blocks provided? At location(s)
Is pressure test specified? Yes a No ❑ Does installation conform to AWWA C600? Yes IN No 0
If no, explain
6. Are valves provided on the suction & discharge lines? Yes ►/ No 0
Type: Discharge Gate & Check Valves
Suction
7. Is an alarm system provided? Yes ® No 0 Type SCADA System
Indicate where audio/visual warning signals will be located Waterloo Wastewater Treatment Plant
8. Method of pump control Floats
9. Are the pumps protected from clogging? Yes ® No 0
Method of cleaning Self -Cleaning Pumps
Method of pump removal Guides & Lifting Cable Are lifting hook/arms provided? Yes
10. Are permanent emergency piping bypass connections provided?
Is an emergency power supply available? Yes
No
Describe station operation in an emergency (equipment, piping, bypass, etc.)
Portable generator connected to station during
power outage. Duplex system allows station to
function even with single pump failure.
11. Is the wastewater pump station located in a floodplain? Yes ❑ No
Elevation of 100 year flood (MSL) Elevation of 25 year flood (MSL)
DNR form 28E (Nov 00)
60279867/420/—La Porte Road -SCHEDULE E.docx
542-3098